Emerald Horizon Ag · VIE:SMRX

Emerald Horizon — Investor Presentation (August 2026)

35 slides from Emerald Horizon's investor presentation, August 2026

  1. Slide 1: The Future of Clean Power

    THE FUTURE OF CLEAN POWER SAFE BY DESIGN. BUILT TO SCALE. SMR SUBCRITICAL MICROMODULAR REACTOR ENERGY STORAGE & ENERGY GENERATION ENERGY PRODUCTION CONFIDENTIAL

  2. Slide 2: The Company in One Page

    THE COMPANY IN ONE PAGE Two products. One platform. A policy tailwind. WHO WE ARE COMPANY & AMBITION Emerald Horizon AG A 10-year master plan to industrial-scale clean power Deep-tech scale-up building the platform behind Europe's Founded 2019, Emerald Horizon develops both an advanced modular, ship

  3. Slide 3: Solving Problems with High Impact Potential

    SOLVING PROBLEMS WITH HIGH IMPACT POTENTIAL RISK RISK Problem-Risk-Need- Critical chain reaction Volatile renewables Analysis Transuranic nuclear Or: Pollution & waste ocean acidification No critical chain reaction <1 g CO₂/kWh in operation Pressure-free by design 24/7 baseload — independent of weat

  4. Slide 4: SMRX - Subcritical Micromodular Reactor

    SMRX - SUBCRITICAL MICROMODULAR REACTOR ONE SYSTEM – CONTAINER SIZE - MODULAR & SCALABLE E-store CALstore Phase 1 DUALstorePLUS Battery Storage (BESS) Heat Storage (TESS) 5 MWh LFP battery per module. ≥8,000 cycles 5 MWh molten salt per module. 200–550°C NON-Nuclear Hybrid energy Storage System · Mo

  5. Slide 5: Political Tailwind

    POLITICAL TAILWIND THE EU JUST MADE STORAGE & SMRS ITS OFFICIAL ENERGY POLICY The macro thesis has now become official EU policy. The question for investors is no longer “Is this the right direction?” It is: “Who is best positioned to deliver it?” Significantly increases the probability of success N

  6. Slide 6: VDL Groep

    VDL GROEP INDUSTRIALIZATION PARTNER & KEY DE-RISKING ELEMENT CO-DEVELOPMENT & MANUFACTURING CONFIRMED €4.06bn 100+ 22 €190M 5-month due diligence | 30 Apr 2025 Annual Turnover Companies Countries R&D / year PROOF What VDL delivers for Emerald Horizon VDL: 13,500+ people -Precision engineering, syste

  7. Slide 7: Listing Milestone

    LISTING MILESTONE ON THE VIENNA STOCK EXCHANGE SINCE JUNE 26TH 2026 Ticker: SMRX (Vienna Stock Exchange) ISIN AT0000A3UZE1 Company: Emerald Horizon AG Group Structure: 3 subsidiaries (USA, Slovakia, EaaS spv) and 2 equity participations Capital Markets Advisor: Wiener Privatbank AG Corporate Brokera

  8. Slide 8: DUALstorePLUS

    DUALstorePLUS ENERGY STORAGE CONFIDENTIAL

  9. Slide 9: DUALstorePLUS: Modular to MWh

    DUALstorePLUS MODULAR 5 TO 100 MWh Hybrid storage combining heat (TESS) & electricity (BESS). Inputs: Stand-alone product today – integral building block for the Thorium Generator (ADES) tomorrow. ORDER NOW – DELIVERY SOON Configurable to client-needs : 0–10 modules per TESS or BESS + 1 MCU – AI Con

  10. Slide 10: DUALstorePLUS How It Works

    DUALstorePLUS HOW IT WORKS DUAL input DUAL output 10

  11. Slide 11: CALstore (TESS)

    CALstore (TESS) MOLTEN SALT HEAT STORAGE – REAL HARDWARE PROTOTYPE CELL 1 Cell -> 1 Container -> Serial Production @ VDL READY & VALIDATED Government-funded (FFG) – Ongoing audits 5 MWh molten salt heat storage – stand-alone & integral building block for ADES. Stand-alone product + Part of DUALstore

  12. Slide 12: ADES & DUALstorePLUS

    SMR ADES & DUALstorePLUS and ENERGY PRODUCTION INCL. STORAGE CONFIDENTIAL

  13. Slide 13: What is ADES?

    WHAT IS ADES? ACCELERATOR DRIVEN ENERGY SOURCE The Concept: Thorium + Particle Accelerator + X-Amplifier → CO₂-free energy Why Thorium? • 3x more abundant than uranium Pioneer: Carlo Rubbia • 300-400x more abundant than U-235 Nobel Prize in Physics 1984, CERN Director Pioneer of the Energy Amplifier

  14. Slide 14: ADES Technology, Modularity & Operation

    ADES TECHNOLOGY, MODULARITY & OPERATION FUSION of 5 Core Components 1 ADES ~ 25 MW Injector (Accelerator) Generates protons/ neutrons to initiate and control the thorium reaction (thermal) · ~10 MW electric · 20-year lifetime X-Amplifier Box Amplifies the neutron flux from the accelerator Scalable:

  15. Slide 15: ADES Fact Summary

    ADES ACCELERATOR DRIVEN ENERGY SOURCE – FACT SUMMARY The scalable and risk-optimized solution for CO₂-free energy READY FOR ON/OFF switch ORDER Output: • ADES features a passive-safe ON/OFF control unit. EST. 2031 High-temperature heat AI-powered optimization To generate: • ADES leverages AI to adju

  16. Slide 16: SMRX Is Addressing One of the World's Largest Markets

    SMRX IS ADDRESSING ONE OF THE WORLD'S LARGEST MARKETS EXPANDING BEYOND CONVENTIONAL SMR APPLICATIONS Positioned in the 10 MW sweet spot — one of the largest addressable energy markets in the world (TAM). 1 ADES = 10 MW(el) for 10,000 Hydrogen AI & Data Critical Infrastructure Enhances Wind Upgrade E

  17. Slide 17: SMRX in Action

    SMRX IN ACTION ILLUSTRATIVE X-CONFIGURATION OF THE MODULAR SYSTEM

  18. Slide 18: Accelerator Energy — Building the Future of Clean Power

    CONFIDENTIAL Emerald LaboraTHorium Karl-Huber-Gasse 15 A-8041 Graz www.emerald-horizon.com ACCELERATOR ENERGY — BUILDING THE FUTURE OF CLEAN POWER This material is provided for informational purposes only and does not constitute an offer or solicitation to buy or sell securities in the United States

  19. Slide 19: Appendix: De-Risking

    emerald horizon £4 Energy. Everywhere. “ b/] APPENDIX DE-RISKING

  20. Slide 20: De-Risking Overview

    APPENDIX DE-RISKING OVERVIEW READ THIS APPENDIX AS A MAP Five material risks. Five de-risking responses. The following pages show the evidence. 01 RISK THE RISK HOW EMERALD IS DE-RISKING IT EVIDENCE State it openly PRE-REVENUE DUALstorePLUS EARNS FIRST TIMING & 01 FY25 revenue: €0.2m. Group breakeve

  21. Slide 21: Interest Confirmation: NDA Engagement Landscape

    INTEREST CONFIRMATION THE NDA ENGAGEMENT LANDSCAPE 150+ MUTUALLY EXECUTED NDAs — BEYOND INVESTOR INTEREST Three distinct engagement pathways confirm institutional interest. WHAT EACH ENGAGEMENT TYPE PROVES INVESTMENT INTEREST 40% Holdings · Funds · Family Offices · Finance · International · Alt Inve

  22. Slide 22: Team De-Risking

    TEAM DE-RISKING BRAINS BEHIND EMERALD HORIZON EXECUTIVE TEAM Leaders with experience at the World Bank, the IMF, the ECB, the Austrian National Bank and in the Austrian federal government. CEO Florian Wagner Prof. Dr. Robert Holzmann Ing. Norbert Hofer, MBA DI Dr. Mario J. Müller MMag. Philipp Pölzl

  23. Slide 23: Financial De-Risking: We Don't Need Billions in Equity

    FINANCIAL DE-RISKING WE DON’T NEED BILLIONS IN EQUITY Conventional Plant Risk €6,900M Eliminated 1 GW Plant → Container-Size Modules No large power plant construction risk. Modular container units eliminate megaproject cost overruns. Grid €3,086M Infrastructure Avoided Distributed Grid → No Grid Inf

  24. Slide 24: Several Potential Funding Pathways

    FINANCIAL DE-RISKING SEVERAL POTENTIAL FUNDING PATHWAYS €75M SMRX – ADES prototype cost assumption 1 Commitment from CEO Florian Wagner (Carl Page, Philipp Pölzl, ..) €50M for prototype €5M initial investment + €20M follow-on investment = €25M total (EQS News ID: 2356964) development (TRL4.5->6) & €

  25. Slide 25: Regulatory De-Risking

    REGULATORY DE-RISKING NON-CRITICAL PATHWAY DUAL IDEAL WITH FLEET REGULATION 1. NON-Nuclear 2. Nuclear Adjacent Strategy Significant risk 3× Regulatory Friendly 3× Regulatory Friendly 3× Regulatory Friendly reduction Technical Facts Countries Expert Teams ▼ ▼ ▼ Not like normal DUALstorePLUS No critic

  26. Slide 26: Technical De-Risking

    TECHNICAL DE-RISKING FROM GW VISION TO PROVEN PHYSICS How to get Gigawatt WHY THIS WORKS LEVEL 1 – PARTICLE ACCELERATOR power The Neutron Source Proven Core Technology Compact accelerators are proven neutron sources in medical applications and beyond. TRL9 refers to TRL 9 accelerator technology is a

  27. Slide 27: Progress De-Risking

    PROGRESS DE-RISKING FROM IDEA TO SERIAL PRODUCTION – X SCALING NOW From Zero to Trillions Idea R&D Simulation R&D Hardware Business Plan Phase 1 product Phase 2 product Needs analysis Med Tech (AD–BNCT) & Team Concept Container design for energy Construction of the Completion of prototype Transition

  28. Slide 28: ADES Prototype Setup

    ADES PROTOTYPE SETUP CO-DEVELOPMENT - SERIAL PRODUCT TRL 9 PUMP TIER-1 execution partner CONTAINMENT: HTHX Co-Development isolation, shielding to achieve TRL 9 THORIUM – MOLTEN SALT – LOOP Manufacturing INJECTOR Supply Chain (Accelerator) A HTHX X-AMPLIFIER BOX Reality check: All prototype component

  29. Slide 29: Timing De-Risking Readiness

    TIMING DE-RISKING READINESS READINESS VALUATION TRIGGERS Readiness scorecards (current) Milestone de-risking: readiness scorecards translate technical, regulatory, and commercial progress into valuation step-ups. Timeline and near-term milestone triggers 2026 2027 2028+ DUALstore PLUS readiness (E-s

  30. Slide 30: DUALstorePLUS Technical Readiness

    DUALstorePLUS TECHNICAL READINESS – MILESTONES ACHIEVED - REMAINING PART TO TRL 9 1-9 E-store (BESS) - stand-alone or DUALstorePLUS 10-18 CALstore (TES) - stand-alone or DUALstorePLUS 19-27 MCU (Master Control Unit) DUALstorePLUS 1 Basic validated foundation DUALstorePLUS - READINESS DETAILS - 2700

  31. Slide 31: ADES Technical Readiness

    ADES TECHNICAL READINESS – MILESTONES ACHIEVED - REMAINING PART TO TRL 9 1-9 Structures (non-NUC) & Heat Transfer Loop 10-18 Accelerator (ACC) + Plasma + Targets 19-27 Nuclear Energy Release & Energy Transfer-Salt Loop 1 Basic validated foundation ADES - READINESS DETAILS - 2700 TARGET 2 Concept def

  32. Slide 32: ADES Physics Proof Chain

    ADES PHYSICS PROOF CHAIN EVERY COMPONENT IS VALIDATED The physics underlying ADES is validated. The challenge is system integration and scaling – that’s what VDL Groep delivers. 5 Components 5 Validations Neutron Production via Accelerator ✓ CERN: Accelerator R&D for European ADS Demonstrator 1 High

  33. Slide 33: ADES Energy Equation

    ADES ENERGY EQUATION TRANSMUTING & HARVESTING Physics-Based Validation Stable flux is designed to be achieved using accelerator-based neutron sources, with two complementary solutions planned to reduce technology risk. For further details see capture Th-232 Investment Proposal fission U-233 33

  34. Slide 34: Income De-Risking - X-Multiplier

    INCOME DE-RISKING - X-MULTIPLIER ATTRACTIVE & PREDICTABLE PRICE FOR CLIENTS AND CLEAR PROFIT FOR INVESTORS Flex margin Any overrun of our own costs is buffered. Creating negotiation power on prices and terms X Multiplication Profits multiply over time Modules × Annual Profit × Years Transforms Emera

  35. Slide 35: SMR

    CONFIDENTIAL Emerald LaboraTHorium Karl-Huber-Gasse 15 A-8041 Graz www.emerald-horizon.com SMRSUBCRITICAL MICROMODULAR REACTOR ENERGY STORAGE & ENERGY GENERATION . This material is provided for informational purposes only and does not constitute an offer or solicitation to buy or sell securities in

Emerald Horizon — Investor Presentation (August 2026) on 6ix