Slide 1: CACM GL Update
CACM GL UPDATE EMD MEETING SEPTEMBER 22ND 2014 EUROPEAN ACTIVITIES
Slide 2: Brief Introduction and Update to the Latest Events
BRIEF INTRODUCTION AND UPDATE TO THE LATEST EVENTS
Slide 3: CACM Guideline Main Issues
CACM GUIDELINE MAIN ISSUES
Slide 4: CACM GL - General Aspects
CACM GL- GENERAL ASPECTS • Adoption of terms and conditions or methodologies (QMV) • 2/3 issue / Impossibility to comply in certain countries (enforceability issues) • Amendment process of the CACM GL and stakeholders forum • GL nature of the text and implications • Referencing error in 9(12) for am
Slide 5: CACM GL - Technical Aspects (1/2)
CACM GL- TECHNICAL ASPECTS (1/2) • Capacity Calculation Methodology • 20(4): by 31/12/18 harmonised CC inputs (as far as possible) and harmonised CC methods pan-EU (feasible target technically? efficiency justification?) • 19(1)+(8): 6 months of FB parallel run during the 10 months for developing th
Slide 6: CACM GL - Technical Aspects (1/2)
CACM GL- TECHNICAL ASPECTS (1/2) • Bidding Zones Review • “Several” TSOs/“any” MS can launch a review of BZs out of their areas • Decision process for reconfiguration after study submission is missing • Intra-Day • Definition issues (cfr. ID Energy Gate Closure and timing), others… • Stoppage of the
Slide 7: CACM GL - Main Conclusions
CACM GL- MAIN CONCLUSIONS • CURRENT PROCESS • PRESENT CONTENTS DISCUSSION • FUTURE EVOLUTION > AMENDMENTS 7