Rimfire Pacific Mining Limited · ASX:RIM

Rimfire Pacific Mining — Investor Presentation (August 2020)

15 slides from Rimfire Pacific Mining's investor presentation, Aug 18, 2020

  1. Slide 1: Corporate Presentation

    Gold Explorer and Mine Developer in the Lachlan Fold Belt CORPORATE PRESENTATION August 2020

  2. Slide 2: Disclaimer and Competent Person Statements

    Disclaimer and Competent Person Statements Competent Persons Declaration The information in the report to which this statement is attached that relates to Exploration and Resource Results is based on information reviewed and/or compiled by Craig Riley who is deemed to be a Competent Person and is a

  3. Slide 3: Company Overview

    Company Overview Value Proposition 1. Sorpresa Gold Mine Development 2. Exciting additional Gold / Copper Prospects for evaluation in highly prospective Lachlan Transfer Zone (fault) of the Lachlan Fold Belt with significant current and historical gold and copper production  Multiple projects 1 hou

  4. Slide 4: Lachlan Fold Belt (LFB) – Gold Exploration Hot Spot

    Lachlan Fold Belt (LFB) – Gold Exploration Hot Spot “If the Paterson Province was the hottest exploration destination in 2018, New South Wales Lachlan Fold Belt is the hot spot of this year” Mining Journal, December 2019  Region is host to Cu/Au mines including;  Cowal Au (Evolution Mining ~$10b M

  5. Slide 5: Rimfire Executing Strategy

    Rimfire Executing Strategy Strategy 1: Sorpresa Asset Monetisation  Executed Earn-in  Pathway for Mine Development Approval  Au Exploration for further discoveries Strategy 2: Ongoing Discovery  “The Valley” – Cu / Au  Targets ready for Drilling  Greater Cowal Area – Cu / Au  Located in NSW M

  6. Slide 6: Strategy – Sorpresa Monetisation – Commercial Terms

    Strategy 1 – Sorpresa Monetisation – Commercial Terms  Rimfire retain 100% project management, technical and budget control during Earn-in Period 3  Golden Plains Resources (GPR) obtain 50.1% interest in a JVA if deliver;  $4.5m over 3 years, and  funding for Rimfire’s share of approved mine dev

  7. Slide 7: Strategy 1 – Sorpresa Monetisation - Technical Program

    Strategy 1 – Sorpresa Monetisation - Technical Program Mine Development Approval  Sorpresa • Environmental Impact Assessment • Geotechnical, Hydrological, Metallurgical and Sterilisation Drilling • Mine Development Plans and Process Plant Design • Timeline to obtain Mining Development Approval circ

  8. Slide 8: Strategy – Discovery Targets outside Earn-in Area

    Strategy 2 – Discovery Targets outside Earn-in Area Primary Target:  The Valley  Porphyry Cu / Au and / or Skarn Mineralisation  Targets ready for drilling  Contiguous EL boundary with Kinkora Copper / Rare X  Anomalous Geochem west of Mordialloc Prospect  Targets ready for drilling Additional

  9. Slide 9: Primary Target - The Valley

    Primary Target - The Valley Location:  South east of Sorpresa Recent drilling supports  Situated ~5kms west of Kincora / RareX Porphyry system at depth Mordialloc Prospect (share EL boundary). Work to date: IP Survey  Anomalous results include  Rock chips (> 1% Cu and up to 5% Cu),  Elevated Au

  10. Slide 10: The Valley – Shallow IP Targets Ready for Drilling

    The Valley – Shallow IP* Targets Ready for Drilling 3 5 4  Key Details: PFE  Proposed Drilling, 5x150m= 750m  Anomalous Surface Geochemistry Resistivity  Unexplained IP* signatures  Program Objectives: 1 2 PFE Drill holes to test for  Primary mineralisation  Alteration assemblages Resistivity

  11. Slide 11: Primary Target - The Valley

    Primary Target - The Valley Proposed Work Program  Desktop Study (complete)  Reconnaissance Mapping (ongoing)  Reprocess magnetic data and produce a +3D model to ascertain depth of magnetic features  100 hole Auger program (bedrock samples)  5 x 150m RC / Diamond tail holes to test existing IP

  12. Slide 12: Additional Targets - Greater Cowal and IRGS

    Additional Targets - Greater Cowal and IRGS Proposed Work Program – Greater Cowal  Reconnaissance Mapping  2,000m Aircore Program  600m RC Program (3 x 200m holes) Proposed Work Program – IRGS 6  Re-assaying of pulps for lower detection limits to identify and better vector geochemical anomalism

  13. Slide 13: Rimfire Work Programs - Timeline

    Rimfire Work Programs - Timeline Mine Development Strategy 1 Environmental Impact Assessment (EIA) Geotechnical, Hydrological, Metallurgical and Mine and Process Plant Design Sorpresa Sterilisation Drilling and IRGS Exploration IRGS Vectoring Study Aircore Drilling – Vector Study Targets Earn-in 114

  14. Slide 14: Rimfire Executing Strategy

    Rimfire Executing Strategy  Location Generating New Discoveries Isometric: 0.5g/t Au Sorpresa geological resource model (looking northeast)  Over 900 sq. km in the Lachlan Fold Belt (LFB) 200m  LFB “the hot spot” for Gold and Copper Exploration  Management Team  Experienced Gold Discoverers wit

  15. Slide 15: Thank you

    ASX Code “RIM” www.rimfire.com.au Stay tuned for updates on future work programs rimfire@rimfire.com.au Ph: +613 9620 5866 ROADSIDE Thank you Please contact us for more information Sign up to the Rimfire Website for news alerts 15

Rimfire Pacific Mining — Investor Presentation (August 2020) on 6ix