Akobo Minerals Ab · OSL:AKOBO

Akobo Minerals Ab — Stora Aktiedagen Stockholm 2025

14 slides from Akobo Minerals Ab's conference presentation, Nov 27, 2025

  1. Slide 1: Stora Aktiedagen - Stockholm

    Stora Aktiedagen - Stockholm AKOBO MINERALS AB (publ) 27th November 2025 Euronext – AKOBO OTC – AKOBF www.akobominerals.com

  2. Slide 2: Disclaimer

    Disclaimer This document has been used during an oral presentation. Therefore, this document is incomplete without the oral explanations, comments and supporting instruments that were submitted during the referred presentation. To the extent permitted by law, no representation or warranty is given,

  3. Slide 3: Scandinavian-based Ethiopian Gold Producer and Explorer

    Scandinavian-based Ethiopian Gold Producer and Explorer Strong corporate foundation Strong local foothold, based Low-cost and flexible to support continued growth upon the principles of good operations to be supported of resources and discovery ethics, transparency and by cash flow from current of n

  4. Slide 4: Akobo Minerals – Snapshot

    Akobo Minerals – Snapshot ▪ Segele, a high-grade deposit developed over 15 years from pure greenfield into a producing mine 3.000 shareholders + Ethiopian Investment Holding ▪ One of the very few juniors to progress from discovery to production, and now operating with cash flow ▪ First international

  5. Slide 5: Responsible Operations – Doing it Right

    Responsible Operations – Doing it Right ▪ Strong award-winning ESG policy ▪ Low environmental footprint ▪ Being Ethiopian-based is a strength for access, insight and continuity ▪ Mainly Ethiopian workforce, supported by a small number of experienced expats ▪ 2 employees outside Ethiopia, lean and fo

  6. Slide 6: Current Status

    Current Status ▪ Positive EBITDA expected in Q3 – first time in 15 years ▪ Steady production of 6–8 kg per month ▪ Operational break-even around ~5 kg ▪ No chemicals and gravity-only processing with ~86% recovery ▪ Tailings facility preparation for future CIL plant ▪ Camp upgrades for 200+ employees

  7. Slide 7: AKOBOMINERALS

    AKOBOMINERALS

  8. Slide 8: Vertical Shaft Development

    Vertical Shaft Development ▪ Vertical shaft development underway ▪ Designed to support up to 50 kg/month over time, with low incremental operating costs ▪ Operational during Q1 2026, with following ramp up period ▪ Will replace the current tunnels and save time and money ▪ Capacity: 100 to 150 tons

  9. Slide 9: High Grade vs Industry Average

    High Grade vs Industry Average ▪ Segele grade remains far above typical gold mines ▪ High grade supports low unit costs and stronger margins ▪ Segele Mineral Resource (SRK, April 2022) • Indicated: 41,000 oz @ 40.6 g/t • Total: 68,811 oz @ 22.7 g/t ▪ Segele is still small, but open at depth, and we

  10. Slide 10: Ethiopia – Positive Investment Climate

    Ethiopia – Positive Investment Climate ▪ Government reforms supporting mining and foreign investment and export-led growth ▪ Mining positioned as a core pillar in national economic development ▪ Positive engagement with Ministry of Mines ▪ New mining directive offering offshore accounts and stable e

  11. Slide 11: Geological Potential and Growth Pipeline

    Geological Potential and Growth Pipeline ▪ Ethiopia under-explored despite strong geological fundamentals ▪ Akobo operating in a favourable greenstone belt with first-mover advantage ▪ Near-mine exploration ongoing; good indications outside current model GINGIBIL ▪ Gingibil–Joru corridor already wel

  12. Slide 12: The Near Future

    The Near Future ▪ Shaft completion enabling higher and more stable production ▪ Ramp-up towards significantly higher production levels, driven by shaft efficiency ▪ Access to deeper zones and additional ore bodies ▪ Restart of near-mine drilling ▪ Start of Gingibil–Joru drill program ▪ Continued pla

  13. Slide 13: Summary

    Summary ▪ A producing, high-grade mine with clear upside ▪ Visible path to growth through shaft, exploration and plant development ▪ Low-cost, disciplined operator with improving cash flow ▪ Strong support and an improving investment climate ▪ Attractive long-term potential in an under-explored gold

  14. Slide 14: Q&A

    Q&A 14 14

Akobo Minerals — Stora Aktiedagen Stockholm 2025 on 6ix