Pecoy Copper Corp. · TSXV:PCU

Pecoy Copper — Investor Presentation (October 2025)

26 slides from Pecoy Copper's investor presentation, October 2025

  1. Slide 1: Unlocking a New Copper District in Southern Peru

    UNLOCKING A New Copper District in Southern Peru CORPORATE OCTOBER TSXV: PCU PRESENTATION 2025

  2. Slide 2: Forward-Looking Statement

    FORWARD -LOOKING STATEMENT 2 This Presentation contains “forward-looking information” and “forward looking statements” within the meaning of applicable securities laws and (collectively, “forward-looking statements”). Forward-looking statements in this Presentation may include, but are not limited t

  3. Slide 3: The Vision: Two Adjacent Projects

    3 THE VISION To unlock the world-class potential of one of the largest copper-gold porphyry districts through responsible exploration, delivering sustainable, long-term value for all stakeholders and setting a benchmark for environmental and social stewardship PECOY TWO ADJACENT PROJECTS LOW ALTITUD

  4. Slide 4: Highlights

    HIGHLIGHTS 4 WORLD -CLASS COPPER DEPOSIT 865 million tonnes at 0.34% Copper 1 + gold upside Potential for low strip ratio + high grade starter pit Low altitude ~1,650 m above sea level within 100 km of the coas DISTRICT AND GROWTH POTENTIAL Significant exploration upside with projects open in all di

  5. Slide 5: Pecoy Now Fully Consolidated

    PECOY NOW FULLY CONSOLIDATED 5 Will benefit from over $85 million of historical expenditures on the consolidated Pecoy claims SIMPLIFIED PROJECT DEVELOPMENT Consolidation creates rare opportunity to unlock value from one of the largest copper deposits in the world with strong exploration upside FOR

  6. Slide 6: Located in a World-Class Copper Province

    LOCATED IN A WORLD -CLASS COPPER PROVINCE 6 Close to coast in southern Peru copper belt – multiple major copper deposits with infrastructure A RARE, LARGE -SCALE PROJECT AT LOW ELEVATION • Low altitude 1,650 – 2,200 m.a.s.l. • 85 km north of Ocoña (coastal town) and an additional 150 km from Mataran

  7. Slide 7: District Potential

    DISTRICT 7 COASTAL PAN AMERICAN HIGHWAY POTENTIAL Close to the coast 85km PECOY • Large established deposit with strong growth potential • Unlocking significant additional upside PECOY TORORUME TORORUME • Large -footprint porphyry system • Initial drilling confirms 3 zones 8km (east, west & north) T

  8. Slide 8: Pecoy – Copper, Gold, Molybdenum: One of the Largest Undeveloped Deposits

    PECOY – COPPER, GOLD, MOLYBDENUM 8 ONE OF THE LARGEST UNDEVELOPED DEPOSITS An initial robust resource based on limited drilling and small exploration programs ▪ Based on only 121 historical drill holes totaling 48,576 PECOY – Inferred Resources (100% basis) meters drilled Cut -off Tonnage Grade Cont

  9. Slide 9: Pecoy Is Open in All Directions

    PECOY IS OPEN IN ALL DIRECTIONS 9 DEPOSIT OUTLINE DEPOSIT OPEN IN ALL DIRECTIONS: ▪ 3 main target areas around current pit outline • Center Pit Target • West • East and Southeast ▪ Large porphyry expansion potential below holes to EAST the south UNDER DRILLED DEPOSIT ▪ Only 48,576 meters drilled to

  10. Slide 10: Pecoy – Copper Resource Expansion

    PECOY – COPPER RESOURCE EXPANSION 10 Drilling – Copper Intercepts Only CENTER PIT SOUTH BRECIA DEPTH TARGET Isometric View – Looking East Source: Company materials and VRIFY

  11. Slide 11: South Breccia High Grade Copper & Gold

    SOUTH BRECCIA HIGH GRADE COPPER & GOLD 11 Drilling – Gold Intercepts Only FROM SURFACE OCA12-010 300m @ 0.48% Cu, 0.17g/t Au PEC-16 606m @ 0.36% Cu, 0.21g/t Au ENTIRE HOLE MINERALIZED FROM SURFACE Including 106m @ 0.49% Cu, 0.50g/t Au FROM SURFACE PEC-15 478m @ 0.36% Cu, 0.26g/t Au Including 118m @

  12. Slide 12: Multiple Targets for Expansion & Growth

    MULTIPLE TARGETS FOR EXPANSION & GROWTH 12 Further upside potential to increasing resource base TARGETS DISTANCE TORORUME TO PECOY NORTHWEST CENTER OF EAST RIDGE In-Pit CAMP PIT OXIDES In-Pit SOUTH In-Pit CENTER PIT PECOY DEPOSIT BRECCIA & East EAST WEST PAMPA Below DEPTH Pit WEST 500M DEPTH ROAD PA

  13. Slide 13: Tororume: Follow-Up Drilling of Discovery Holes for 2026

    TORORUME 13 FOLLOW -UP DRILLING OF DISCOVERY HOLES FOR 2026 1. Large footprint warrants further testing & drilling 2. Size Potential to be → 3 times Pecoy 3. Great initial results with multiple untested zones TORORUME NORTH – TORO -008 • 262m @ 0.27% Cu, 0.028% Mo – From Surface TORORUME WEST – TORO

  14. Slide 14: Fully-Operational Camp

    14 FULLY -OPERATIONAL CAMP Full camp to expedite and support exploration efforts 40 PERSON CAPACITY | CORE SHACK | PREP SITE | SOCCER FIELD TSXV: P CU

  15. Slide 15: Long Standing Community Relationships

    30 -YEAR SURFACE AGREEMENT IN PLACE WITH 15 LONG ARIRAHUA 30-year surface right agreement with the option to renew for an additional 30 years STANDING Signed October 28, 2015 COMMUNITY PRO -MINING & FRIENDLY COMMUNITY While mining community is close, there is no direct exposure to settlement within

  16. Slide 16: Upcoming Catalysts – Execution Focus

    UPCOMING CATALYSTS – EXECUTION FOCUS 16 2025 2026 2027 PHASE 1 DRILLING – 10,000 M PHASE 2 DRILLING – 20,000 M DRILLING – 30,000m EXPLORATION CENTER OF THE PIT PECOY EXPANSION DRILLING SOUTH BRECCIA WAKA -WAKA & EAST TARGET TORORUME WEST TORORUME STARTER PIT / OXIDE ANALYSIS UPDATED NI 43 -101 RESOU

  17. Slide 17: Unlocking the Potential Phase 1

    17 UNLOCKING THE POTENTIAL PHASE 1 2025 work plan priority – focus on resource expansion GEOLOGY AND DRILLING PHASE 1 PROGRAM • 10,000-meter program to expand Pecoy’s footprint 1. INFILL (~3,000m) • Resource expansion drilling targeting >1Bt resource • 4 holes (~700m each) • Re -log select drill hol

  18. Slide 18: Leadership

    LEADERSHIP 18 Board of directors and executive management President & CEO, Director Chief Geological Officer Managing Director – Peru, Director Accomplished senior executive with over Accomplished geologist with extensive Finance and mining executive with 15 20 years of experience building explorati

  19. Slide 19: Capital Structure

    19 CAPITAL STRUCTURE as of September 8, 2025 SHARES VALUE (C$) • Offering Investors – C$63.5 M raise 105.8 M • Vendors and Optionors 49.3 M • Management and Officers 36.6 M • Others 21.3 M Shares Outstanding 213.1 M Market Capitalization C$127.8M Milestone Warrants at $0.75/sh. 12.0 M Strategic Part

  20. Slide 20: Peru for Copper: Land of Majors

    PERU FOR COPPER LAND OF MAJORS 20 A premier mining jurisdiction & world leading copper producer LOW-RISK AND MINING FRIENDLY CURRENT OPERATORS AND DEVELOPERS • Peru is one of the strongest economies in the region, with one of the best sovereign credit rating among South American countries • Continuo

  21. Slide 21: Thank You

    THANK YOU www.pecoycopper.com | @pecoycopper | vmetcalfe@pecoycopper.com | +1 514 249 9960

  22. Slide 22: Appendices

    APPENDICES

  23. Slide 23: Drilling Strategy Phase 1

    DRILLING STRATEGY PHASE 1 23 Increase Pecoy Ni 43 -101 Resource to > 1 BT INFILL (~3,000m in Phase 1) – Drillholes 1-4 • 4 holes (~700m each) • Infill drilling gat - Center of the Pit Target • Outcome – Convert 63Mt of Waste Material EXPANSION DRILLING TO THE WEST – Drillholes 5-7 • 3 holes (~600m e

  24. Slide 24: Unlocking the Potential Phase 2

    UNLOCKING THE POTENTIAL PHASE 2 24 2026 work plan – infill drilling & advanced studies GEOLOGY AND DRILLING • 20,000-meter program to better understand geological domains/ metallurgical and geotechnical characteristics • Follow-up drilling targeting >1Bt resource • Evaluate Oxide potential & starter

  25. Slide 25: Well-Understood Geology

    WELL -UNDERSTOOD GEOLOGY 25 NORTH Large porphyry & multiple WEST BRECCIA BRECCIA breccia bodies ▪ Porphyry: 1.9kms x 1.5kms ▪ Breccias: Various Sizes & up to 0.5 by 1.0kms ▪ Less than 49,000m of drilling within the area Porphyry (Mineral 1) • 1 Big Distinctive Body • Pyrite – Chalcopyrite (Cu) • Ext

  26. Slide 26: Multiple Targets for Expansion & Growth

    MULTIPLE TARGETS FOR EXPANSION & GROWTH 26 Further upside potential to increasing resource base TORORUME DISTANCE TARGETS DESCRIPTION TO PECOY CENTER OF 63 Mt in middle of pit currently valued at 0% Cu due to drill In-Pit PIT spacing OXIDES In-Pit Remains open in all directions SOUTH In-Pit Current

Pecoy Copper — Investor Presentation (October 2025) on 6ix