  1. Slide 1: Eagle Mountain Gold Mine: Construction Completed, Commissioning Started

    EAGLE MOUNTAIN GOLD MINE Construction Completed, Commissioning Started Production Phase Imminent February 2016 570 Granville Street, Suite 501 Toll Free: 1‐866‐691‐1760 Vancouver, BC V6C 3P1 Tel: 604‐694‐1760 info@goldsourcemines.com Fax: 604 604‐694‐1761 694 1761 www.goldsourcemines.com

  2. Slide 2: Company Disclaimer

    Company Disclaimer Certain statements contained in this presentation constitute “forward‐looking statements” within the meaning of applicable Canadian securities legislation. Such forward‐ looking statements herein include but are not limited to: strategic plans and expectations in the Preliminary E

  3. Slide 3: Eagle Mountain Highlights

    Eagle Mountain Highlights • Eagle Mountain Preliminary Economic Assessment (Effective Date of June 15, 2014) – Initial Capex of US$5.9 million (US$24.4 million LOM) – US$4.5 million spent to date on construction – Four‐stage development ramping up from 1,000 tpd to 4,000 tpd producing 168,700 ounces

  4. Slide 4: Management

    Management J. Scott Drever, BSc., CEO (45 + years experience) Strategic planning, mergers and acquisitions. Management and operational experience with several production companies companies, incl incl. Placer Dome Dome, Blackdome Mining and SilverCrest Mines Inc.. Inc Also serves as Director for Sil

  5. Slide 5: Capitalization Structure

    Capitalization Structure Shares outstanding 126,973,249 Fully diluted 177 675 595 177,675,595 Available Cash in Hand (Jan 2016): Approx. CD$1.7 million Market Capitalization: C$46 million (Feb. 16, 2016) Key Shareholders (January 1, 2015) Management / Directors 16% Mine Commissioning Donald Smith Va

  6. Slide 6: Company History & Highlights

    Company History & Highlights • Eagle Mountain Gold Project located in Guyana, South America, a mining‐friendly, f English‐speaking jurisdiction with stable democracy based on British law. • February 2014, Amalgamation of Goldsource Mines (TSX‐V: GXS.V) and Eagle Mountain Gold (TSX‐V: Z.V) was comple

  7. Slide 7: Project Logistics

    Project Logistics • Project is located 230 km SW of capital Georgetown, Guyana and is accessible by existing roads. • Commercial airport at Mahdia Township, 45 min. flight from Georgetown ‐ 7km from Eagle Mtn. • Located 45 km from historic Omai gold mine which produced est. 4 million oz of Au from 1

  8. Slide 8: Eagle Mountain Gold Project Resources

    Eagle Mountain Gold Project Resources NI 43‐101 compliant gold resources: Category Material Tonnes Gold Gold Used in ppm ounces PEA Indicated Saprolite 1,590,000 1.45 74,000 Yes Fresh 2,331,000 1.52 114,000 No Inferred* Saprolite 7,203,000 1.32 306,000 Yes Fresh 13,433,000 1.13 486,000 No Eagle Moun

  9. Slide 9: PEA Financial Analysis Results

    PEA Financial Analysis Results Pre‐tax P t Internal I t lR Rate t off Return R t (“IRR”) of 84% and after‐tax IRR of 63% US$1,250 /oz Gold Price Used Pre‐tax NPV(5%) of US$69.4 million and after‐tax NPV(5%) of US$45.6 million Total LOM capital (sustaining and growth) All figures of US$24 US$24.44 mi

  10. Slide 10: PEA Highlights – Part 1

    PEA Highlights – Part 1 _ Phase I mining rates would be 1,000 tonnes per day in year one ramping up to 4,000 tonnes per day by year four. _ Each incremental phase costs ~US$4 million and takes five months. _ Conventional open cut mining of soft weathered rock – no blasting or truck hauling is requir

  11. Slide 11: PEA Highlights – Part 2

    PEA Highlights – Part 2 _ Good infrastructure, only requires 7 km of road rehabilitation to Mahdia town – labor supply _ Low power requirements – 500 KVA diesel generator – Ample water is locally available. _ Phase I, pre‐production capital costs of US$5.9 million including a 15% contingency _ Total

  12. Slide 12: Resources Not Considered in the PEA

    Resources Not Considered in the PEA _ Inventory of 161,900 oz Au stockpiled from gravity‐only processing rejects for potential future reprocessing using standard technologies _ Future option value (not considered in the PEA) “fresh‐rock” resources of Indicated 2,331,000 tonnes @ 1.52 g/tonne Au cont

  13. Slide 13: Five-Year Strategy

    Five‐Year Five Year Strategy • Become a low cost gold producer in the Guyana Belt with significant free cash flow • Use cash flow to expand production capacity from 1,000 to 4,000 tpd • Assess potential to treat gravity tailings inventory to increase recovery and production • Acquire similar project

  14. Slide 14: Project Construction Commenced in February 2015

    Project Construction Commenced in February 2015 C Current t Status St t (January (J 2016) – Construction C t ti nears Completion C l ti The most significant construction activities are as follows: • Construction of gold processing plant (100 tonnes per hour) from Sepro Minerals Systems Corp. (“Sepro

  15. Slide 15: FALCON Gravity Concentrators being assembled on site

    FALCON Gravity Concentrators being assembled on site From Grizzly to Slurry 15

  16. Slide 16: Construction photos: dozer, electrical panel, slurry pipe

    CAT D8R Dozer leveling ground Electrical Panel with computerized control centre for the Sepro FALCON system 8” Slurry Pipe Connecting S bb Plant Scrubber l with i h Falcon l Concentrators 16

  17. Slide 17: Road Mahdia Town to Eagle Mountain - Rehabilitation

    Road Mahdia Town to Eagle Mountain ‐ Rehabilitation Same section OLD ROAD Same section NEW ROAD (while in construction) 17

  18. Slide 18: Example of a new bridge

    Example of a new bridge g Old bridge 18

  19. Slide 19: Why Goldsource Mines?

    Whyy Goldsource Mines? Highlights • Extensive management experience in low‐cost phased project execution in the Americas • Low development Capex (PEA: US$5.9 M, expected (Sept 2015): US$4.5‐$5.0 M) • Low Opex (US$600 to US$700/oz All‐in sustaining cash costs) Saprolite • Low technical risk • Short t

  20. Slide 20: Contact Us

    Contact Us Suite 501 – 570 Granville St. Vancouver, BC V6C 3P1 info@goldsourcemines.com info@goldsourcemines com www.goldsourcemines.com T ll Free: Toll F 1 1‐866‐691‐1760 866 691 1760 Tel: 604‐694‐1760 TSX‐V: GXS.V OTCMKT: GXSFF 20