Alamos Gold Inc. · TSX:AGI

Alamos Gold — Shareholder Meeting (May 2006)

16 slides from Alamos Gold's shareholder meeting presentation, May 2006

  1. Slide 1: Major New Sierra Madre Advanced Projects/Mines

    Major New Sierra Madre Advanced Projects/Mines New Mines/ Advanced Development Projects – Sierra Madre, Mexico • Sauzal (HS) – production • Palmarejo (LS) - exploration 2.3 Moz Au 136M oz Ag 3.9 Moz Ag 1 M oz Au • Mulatos (HS) - production • Pinos Altos (LS) - exploration 4.1 Moz Au 2.1M oz Au • Oca

  2. Slide 2: Focus on: Achieving Commercial Production, Expanding Reserves, Regional Exploration

    Focus on: ACHIEVING COMMERCIAL PRODUCTION EXPANDING RESERVES REGIONAL EXPLORATION 2

  3. Slide 3: Mulatos Deposit Resource Expansion Program

    Focus on: ACHIEVING COMMERCIAL PRODUCTION EXPANDING RESERVES REGIONAL EXPLORATION Mulatos Deposit Resource Expansion Program 3

  4. Slide 4: Escondida/Gap/El Victor/San Carlos Model and UG Drill Plan

    Escondida/Gap/El Victor/San Carlos Model and UG Drill Plan Exploration Drift Escondida/El Victor Drifting • 1534 m total progress to date • 523 m remaining • Escondida drifting: 9381 t shipped to leach pads (92%) • 1.37 g/t Au, 5.9 g/t Ag average grade • El Victor portion advancing while drilling Es

  5. Slide 5: Escondida Underground Drilling Program

    Escondida Underground Drilling Program • Two rigs • 93 holes completed (7876m) • 28 holes remaining (2100m) • Completion - July • Continued difficult drilling due to extremely hard, broken core and recovery issues • Drill crew staffing becoming problematic Escondida Underground Drilling – challengin

  6. Slide 6: Escondida Hangingwall Zone Au

    Escondida Hangingwall Zone Au • Missed by three previous drill campaigns • Coarse native gold with barite • Gold to 4mm • Highest assays in deposit: 100- 540 g/t Au Escondida Hanging Wall Zone Plan Map 6

  7. Slide 7: Escondida Hanging Wall Zone Long and Cross Sections

    Escondida Hanging Wall Zone Long Section Escondida Hanging Wall Zone Cross Section 7

  8. Slide 8: EHWZ Large-diameter Core Drilling Program

    EHWZ Large-diameter Core Drilling Program • Core twins of high- grade intervals for met and bulk sample test work. • Seven holes, 194m • Variable recovery due to highly fractured and broken extremely hard silica. EHWZ Characteristics • Native gold very loosely held on fractures and in vugs. • Gold l

  9. Slide 9: Greater Mulatos Deposit Mineralized Areas

    Greater Mulatos Deposit Mineralized Areas El Salto - Mina Vieja – Escondida Long Section 9

  10. Slide 10: 1885 Mina Vieja Stope Map

    1885 Mina Vieja Stope Map Greater Mulatos Deposit Mineralized Areas 10

  11. Slide 11: El Victor Underground Development and Drilling Program

    El Victor Underground Development and Drilling Program • 930m total development in two drifts • EVE: 4410t shipped, 1.01 g/t Au, 7.5 g/t Ag • EVW: 4983t shipped, 0.91 g/t Au, 12.5 g/t Ag • 31 core holes completed (1852m) • 50 holes remaining (6000m) remaining Resource Estimation Projections • Origin

  12. Slide 12: San Carlos High-grade Zone

    Known High-Grade Mineralized Areas Known areas of high-grade (+1 opt) Primary mineralized structures San Carlos High-grade Zone • K3 : 9m @ 12.1 g/t Au • K67: 4.57m @ 22.4 g/t Au K67 K3 Y San Carlos Adit El Victor 12

  13. Slide 13: Puerto del Aire

    Puerto del Aire • 15 holes (3273m) drilled to date • Previous high- grade intercepts. • Deep, 100-200m • Extension of Mulatos mineralization • Additional holes pending Focus on: ACHIEVING COMMERCIAL PRODUCTION EXPANDING RESERVES REGIONAL EXPLORATION 13

  14. Slide 14: 2006 Mulatos Resource Expansion and District Exploration Program

    2006 Mulatos Resource Expansion and District Exploration Program • 3 Phase IV (Resource and reserve definition) Escondida, El Victor, Gap • 3 Phase III (Step-out drilling of multiple intercepts) West Bajios, Realito, San Carlos • 3 Phase II (Mineralized intercepts) Jaspe, Halcon, Yaqui • 2 Phase I (

  15. Slide 15: West Bajios Project

    El Realito Mine Area Phase I Drilling • Phase I – 14 holes • Best intercept 24.4 m of 5.98 g/t Au in 04RE007 • Strongly oxidized system; Sauzal-style high sulfidation • Visible gold • Stage Undrilled rockI chip drilling restricted to gold central anomalies400m of system Rock chip gold anomaly 0 250m

  16. Slide 16: El Jaspe Phase I Drilling

    El Jaspe Phase I Drilling • 34 holes drilled (4566m) • Blind discovery of extensive thick (<95m) stratiform silica-sulfide breccia • Breccia moderately to strongly gold anomalous • Local strong Ag + Cu concentrations • Awaiting Phase II drilling 16