Tinone Resources Inc · TSXV:TORC

Tinone Resources — Investor Presentation (January 2025)

26 slides from Tinone Resources's investor presentation, January 2025

  1. Slide 1: Corporate Presentation

    Corporate Presentation January 2025 TSXV: TORC OTCQB: TORCF

  2. Slide 2: Disclaimer

    Disclaimer General This corporate presentation is intended to provide an overview of the business of TinOne Resources Inc. (the "Company"). It has been prepared for informational purposes only and does not purport to be complete. The information in this presentation is not intended to be relied upon

  3. Slide 3: TinOne Resources

    TinOne Resources TinOne is focused on the exploration and growth of prospective tin, lithium and tin/tungsten projects in Australia, with a focus on Tasmania Quality asset portfolio Building a significant position A portfolio of highly prospective tin, lithium and Expanding district scale exploratio

  4. Slide 4: Company Snapshot

    Company Snapshot 36% owned by Directors, Management & Advisors Attractive valuation relative to peers Share Structure & Cash (MILLIONS) Shares Outstanding 9.3 Warrants* 7.8 Stock Options ($2.13) 0.5 RSUs 0.0 Fully Diluted 17.6 Share Price $0.10 Market Capitalization** $ 0.93 Cash $ 0.5 Convertible D

  5. Slide 5: Why Tin?

    Why Tin? Every component of the carbon reduced and growing data-driven economy requires tin, without it, electrons don’t flow. Metals Most Impacted by New Technology1 Autonomous Advanced Energy Advanced Key Highlights Renewable & Electric Vehicles Robotics Energy Storage Computation & IT • 50% of co

  6. Slide 6: Driving Force Behind Tin Demand – Growth in End Consumption

    Driving Force Behind Tin Demand – Growth in End Consumption Electric Vehicle Base Case Growth Rate1 Global Growth In Semi-Conductors2 Number of Estimate Vehicles, Millions Semi-Conductor Market Value Vertical. Indicative, $B 2016-30 % CARG1 +CAGR, 2021-30, 120 7% 60 Wired Communication Global produc

  7. Slide 7: Supply Constrained

    Supply Constrained Supply constrained by limited number of new projects and lack of expansion by existing producers Limited Industry Supply Structural Deficit Caused By Lack of Development - 20301 • Due to global economic slowdown, there was a reported tin surplus of 9,700 t in 2023, but 500 2030 an

  8. Slide 8: Geopolitical Outlook

    Geopolitical Outlook The global critical metal outlook has become a geopolitical tug of war between certain countries Key Geopolitical Policies Top 10 Global Tin Production by Country5 01 Indonesia implemented a ban on the export of tin in early 2024, to encourage downstream processing domestically,

  9. Slide 9: TinOne’s Portfolio of Key Tin Assets

    TinOne’s Portfolio of Key Tin Assets TinOne holds a dominant ground position over the prospective lithium-hosting granites in north-east Tasmania A Great Pyramid Project - Tin • Estimate: 8.4 million tonnes at an average grade of 0.17% tin for 14.4 thousand tonnes of contained tin1 • Completed 4,687

  10. Slide 10: Why we like Tasmania

    Why we like Tasmania Location & access to infrastructure/utilities creates an efficient exploration platform Major Ports Burnie, Devonport & Bell Bay Easy access to Efficient, fast Launceston projects via permitting and Major city with a population of ~110,000 network of licencing system Great Pyram

  11. Slide 11: Great Pyramid Tin Project

    Great Pyramid Tin Project A highly prospective tin project with a historical resource that had seen no modern, systematic exploration Location Tier 1 Jurisdiction, NE Tasmania, Australia ~135 km from Launceston Significant resource growth potential Recently completed drill program demonstrated signi

  12. Slide 12: Great Pyramid – What we know

    Great Pyramid – What we know The deposit’s nature and extent are not constrained laterally or vertically, and the deposit is considered open for expansion in all directions. Great Pyramid Deposit Overview Great Pyramid Resource - Oblique View Bulk mineable sheeted vein style tin Deposit begins at su

  13. Slide 13: Great Pyramid – 2022 & 2024 Drilling Program Summary

    Great Pyramid – 2022 & 2024 Drilling Program Summary Great Pyramid Program Aims and Results Confirm historical drilling & resource estimate Weighted average tin grade for all 2022 recorded intersections was 0.23% Sn Drill hole plan showing Sn grades and key selected intersections 2024 drilling confi

  14. Slide 14: The Opportunity

    The Opportunity Tin projects are highly leveraged and high margin operations High Level Overview1 Open Pit Tin Projects,2 120 Mt Lindsay, • The average open pit All In Sustaining Cost (AISC) for undeveloped PFS tin projects is approximately $US17.5k per ton tin produced 100 Contained Sn (kt) – M&I o

  15. Slide 15: Great Pyramid – Upside

    Great Pyramid – Upside Modern geophysical surveys conducted by TinOne have identified several key exploration targets Great Pyramid Potential Interpreted granite source not encountered, therefore mineralization remains entirely open at depth open Mineral Resources Tasmania geophysical modelling inte

  16. Slide 16: Aberfoyle Tin, Tungsten & Lithium Project

    Aberfoyle Tin, Tungsten & Lithium Project A past producing, highly prospective tin district that has seen no modern exploration Aberfoyle Tin Project Located NE Tasmania ~95 km from Launceston Property Size 96 km2 over two blocks Ownership 100% TinOne Resources Inc Easy access due to a network of we

  17. Slide 17: Aberfoyle – Tin / Tungsten

    Aberfoyle – Tin / Tungsten Extensive areas of known geological systems have seen little to no systematic exploration Aberfoyle tin / tungsten project overview Past producing tin district • Aberfoyle historic production1 2.1Mt @ 0.9% Sn and 0.3% WO3 • Multi-kilometre scale vein corridors with sparse

  18. Slide 18: Aberfoyle – Lithium Focused Exploration

    Aberfoyle – Lithium Focused Exploration Most recent sampling program has confirmed and expanded previously reported lithium discovery Key Highlights • Lithium mineralization zone expanded from initial sampling program • 10 samples from tin-focussed sampling program returned lithium values 0.1% Li2O

  19. Slide 19: Board of Directors, Management & Advisors

    Board of Directors, Management & Advisors A highly diversified board team with all aspects of local exploration, development and capital markets Chris Liz Ota Dr. Chris Donaldson Monger Hally Leslie Executive Chairman, CEO Director Director Technical Advisor 25-year track record raising funds. Chart

  20. Slide 20: APPENDIX

    eftinOne APPENDIX

  21. Slide 21: Great Pyramid – Drilling Program Summary

    Great Pyramid – Drilling Program Summary Great Pyramid drill hole plan showing Sn grades and key selected intersections. The mineralization is open in all directions laterally and at depth. 21 TSXV: TORC tinone.ca

  22. Slide 22: Great Pyramid – 2024 Drilling Program Summary

    Great Pyramid – 2024 Drilling Program Summary Plan showing collar locations of 2024 and previous drilling on LiDAR- generated hill Great Pyramid drill section showing TinOne 2024 and shade. Main access track – black line. Pyramid Hill Fault (interpreted position) – Paringa-Aberfoyle 1969-1970 drilli

  23. Slide 23: Aberfoyle – Soil Sampling Results

    Aberfoyle – Soil Sampling Results Map showing lithium-in-soil geochemical results from Aberfoyle see Company news release dated July 20, 2023 23 TSXV: TORC tinone.ca

  24. Slide 24: Peers: The Development Life Cycle

    Peers: The Development Life Cycle Lower pre-production capital required to develop a tin deposit compared to other commodities Tin mines Study results from several tin deposits Units The Achmmach1 Heemskirk2 Oropesa3 Taronga4 South Crofty5 Year complete 2018 2019 2021 2014 2017 Study type PFS Scopin

  25. Slide 25: Disclaimer

    Disclaimer Forward-Looking Statements This presentation contains “forward looking statements” regarding the Company within the meaning of applicable securities legislation, including statements as to future events, results and plans. Forward- looking statements are sometimes but not always identifie

  26. Slide 26: Contact the Team

    Contact the Team Chris Donaldson (Executive Chairman) - Canada chris@tinone.ca www.tinone.ca TSXV: TORC OTCQB: TORCF

TinOne Resources — Investor Presentation (January 2025) on 6ix