  1. Slide 1: Research on Operation Strategy and Method of West Africa integration project

    SIS Global Forum 2019 Research on Operation Strategy and Method of West Africa integration project Guo Xiaofei Sep. 2019 1

  2. Slide 2: Introduction, Analyze, Case Study, Conclusion

    SIS Global Forum 2019  Introduction  Analyze  Case Study  Conclusion 2

  3. Slide 3: Introduction

    Introduction SIS Global Forum 2019  Integration project Upstream • the West African oil and gas resources project - located in the inland project domestic sales of the host country of the resources to establish a long pipeline to the international market. Refinery Pipeline project project • Interna

  4. Slide 4: Pipeline integration project

    Analyze SIS Global Forum 2019  Upstream and Pipeline integration project  When the cost recovery pool is sufficient, Production Sale Price • Contractor’s Cash Inflows = Cost Recovery + Profit Sharing= Cost Transportation cost Recovery + (Revenue - Cost Recovery) ×Profit Sharing Rate=CR(1- Sales Ne

  5. Slide 5: Pipeline integration project

    Analyze SIS Global Forum 2019  Upstream and Pipeline integration project  If the unrecovered investment is huge, the real recoverable cost per year Production Sale Price is the cost recovery ceiling (CRC), Transportation cost • Contractor’s Cash Inflows = Cost Recovery + Profit Sharing= CRC× Sales

  6. Slide 6: Pipeline integration project

    Analyze SIS Global Forum 2019  Upstream and Pipeline integration project Transportation  Contractor’s Net Cash flows = Revenue- Capex- Opex- Income Tax Volume cost  If the annual profit is positive, Revenue • Income Tax = Profit × Income Tax Rate= (Revenue – Opex – Depreciation) ×ITR Capex, Opex

  7. Slide 7: Refinery integration project

    Analyze SIS Global Forum 2019  Upstream and Refinery integration project  When the cost recovery pool is sufficient, Production Sale Price • Contractor’s Cash Inflows = Cost Recovery + Profit Sharing= Cost Recovery + (Revenue - Cost Recovery) ×Profit Sharing Rate=CR(1- Sales Net Back Price PSR) +O

  8. Slide 8: Refinery integration project

    Analyze SIS Global Forum 2019  Upstream and Refinery integration project Production Sale Price  If the unrecovered investment is huge, the real recoverable cost per year is the cost recovery ceiling (CRC), Sales Net Back Price • Contractor’s Cash Inflows = Cost Recovery + Profit Sharing= CRC× Reve

  9. Slide 9: Refinery integration project

    Analyze SIS Global Forum 2019  Upstream and Refinery integration project  Contractor’s Net Cash flows = Revenue- Crude Oil Purchase - Capex- Refined Refined Oil Oil price Volume Opex- Income Tax= Revenue- Crude Oil Purchase - Capex- Opex- (Revenue- Crude Oil Purchase - Depreciation- Opex) ×Income

  10. Slide 10: Analysis and Generalize

    Analyze SIS Global Forum 2019  Analysis and Generalize  The influence from the link variable has the following common to both integration projects, "upstream + pipeline", "upstream + refinery" • Upstream and pipeline or refinery have reverse changes, that is, when upstream net cash flow increases,

  11. Slide 11: Analysis and Generalize

    Analyze SIS Global Forum 2019  Analysis and Generalize PSR × WI the cost pool is sufficient > (1-ITR) × WI improving upstream economics (CRC-CRC × PSR) × WI the cost pool is insufficient PSR × WI the cost pool is sufficient < (1-ITR) × WI improving downstream economics (CRC-CRC × PSR) × WI the cost

  12. Slide 12: Case Study

    Case Study SIS Global Forum 2019  PSR × WI upstream>(1-ITR) × WIdownstream  PSR × WI upstream<(1-ITR) × WIdownstream Cumulative Cashflows Changes with different Cumulative Cashflows Changes with different Transportation Fee Transportation Fee 80.0 100.0 Cumulative Cashflows Cumulative Cashflows 60

  13. Slide 13: Conclusions

    Conclusions SIS Global Forum 2019  Whether it is the "upstream and pipeline" integration project or the "upstream and refinery" integration project, the influence from the link variable has the following common: • Upstream and pipeline or refinery have reverse changes. • Change Rate of the internat