  1. Slide 1: Manica Gold Project Mozambique

    Manica Gold Project Mozambique March 2017

  2. Slide 2: An Important Disclosure

    Xtract Resources PLC An Important Disclosure The information contained in this document, including any information and opinions contained or discussed in any accompanying oral presentation, question and answer session and any other materials distributed in connection with this document (the ‘Present

  3. Slide 3: Manica Gold Project - Mozambique: Why?

    Manica Gold Project - Mozambique Why?  Stable African Economy  Upgrading of infrastructure underway  Mature mining legislation, industry and culture  GDP >5% - high growth rate  Purchase from Auroch concluded  Definitive Feasibility Study Completed  Economically viable project  Low cost and

  4. Slide 4: Mozambique: Good Place To Work

    Mozambique Good Place To Work  Favourable political and legal environment  Multi-Party Democracy since 1994  Stable Southern African jurisdiction  Mature mining legislative regime  No local ownership requirements  Upgrading of National Ports and Power and other infrastructure underway  High G

  5. Slide 5: Manica Gold Project: Established Area

    Manica Gold Project Established Area  Situated in the Odzi-Mutare-Manica Greenstone Belt. Over 2 million oz of gold previously mined  43,6 km² concession  1,262 m oz SAMREC compliant gold resources  Only 10% of concession drill tested  Definitive Feasibility Study of open pit mine completed 4

  6. Slide 6: DFS – Key Financial Parameters

    Manica Gold Project DFS – Key Financial Parameters  Extraction Method – Conventional Open Pit  Life of Mine – 7 years  Total Ore Tonnes Processed – 3.3Mt (42 ktmp)  Total Ounces Produced – 215 koz (~31 kozpm)  Recovered Grade – 2.62 g/t  Gold Price – US$1,262 per oz Project Payback – 2 years 

  7. Slide 7: The Focus

    Manica Gold Project The Focus  1.262 moz SAMREC compliant Au Resources (782koz measured and indicated)  Low cost, near-term ready-to-build production  Metallurgical risk solved by fine grinding and pressure oxidation  Additional nearby prospects for further exploration success, namely  Guy Fawk

  8. Slide 8: Fair Bride Overview

    Fair Bride Overview Main deposit – Fair Bride  Situated in the Odzi-Mutare-Manica Greenstone Belt of Mozambique  1.262moz SAMREC compliant Au Resources (782koz measured and indicated)  Well drilled - a total of 229 drill holes (31,662m) has been completed on the Fair Bride deposit accounting for

  9. Slide 9: Fair Bride: Simple Project

    Fair Bride Simple Project Lower Risk – Lower Cost – Quick into production  Elimination of underground technical mining risk and gold locked up in the crown pillar  Instead of 4 years open pit and 8 years underground mining; expectation is 7 years of open pit mining with a 7.2 strip ratio milling 4

  10. Slide 10: Fair Bride: Solving Metal Recovery

    Fair Bride Solving Metal Recovery  Three types of ore: Oxide; Transitional; and Sulphide  Several test campaigns completed by SGS, Maelgwyn,  Oxide Zone:  standard CIL will result in final recoveries achievable of 95%  Sulphide Zone:  Floatation followed by ultra-fine grinding (-14µm) and oxid

  11. Slide 11: Process Flow Design

    Fair Bride Process Flow Design Tertiary Cone Crusher middlings Secondary Cone Crushers o/s Vibrating Milling & Screen Classification Mill Feed u/s Stockpile Transitional & Sulphides Oxides Jaw Float TSF Crusher o/s Float Tail Thickener UFG u/s Grizzly Thickener Tails Thickener RoM Pad UFG CIL RoM Re

  12. Slide 12: Fair Bride Base Case

    Fair Bride Base Case  Gold price USD 1262/oz  480,000 of ore tonnes per annum mined  7 years of mine life  Average grade 2.72 g/t mined  Stripping Ratio 7.2:1  All up break even cost(C3) USD862/oz  Capital USD43.68 million  NPV at 8.5% discount USD42 million 11

  13. Slide 13: Optimised Pit Views

    Fair Bride Optimised Pit Views  Before Geological Overview  After Initial Mine Key Parameters DFS Optimised DFS Design 12

  14. Slide 14: Fair Bride Insight

    Fair Bride Insight  The mineralised strike of the ore body is approximately 1,040m  Well understood mineralization and geological model shows excellent continuity  Bounded by a fault in the west and low grade mineralization in the east, open on dip  Mainly pre-drilling exploration has taken plac

  15. Slide 15: Before optimised pit view

    Fair Bride Before optimised pit view This is how it looks Project area extending west – approximately Manica Project area- 5km from 85% of tenement remains unexplored town in next river valley Good gravel road Processing Facility Mining and Engineering Area of mining is relatively Site workshop and

  16. Slide 16: Manica Potential: Other Projects

    Manica Potential Other Projects Drilling has targeted the below resources: Dots Luck (750m strike, 100m depth)  43 drill holes for 5000m, of which 38 holes comprise the resource  Bounded by faults on the west and east, but open on dip (off-set of the Northern shear zone) Guy Fawkes (1350m strike,

  17. Slide 17: Manica Exploration Potential

    Manica Exploration Potential Regional Exploration Potential (within current concession)  Only 10% of the 4,300 ha has been drilled  Mainly pre-drilling targeting has taken place along the southern and northern share zone between Dot’s Luck and Fair Bride and further East (14km) and between Guy Faw

  18. Slide 18: Exploration Potential: Top Ten

    Manica Exploration Potential Regional Exploration Potential Top Ten Manica Gold Project Exploration Target** Tonnes (Kt) Au (g/t) Contained Au (oz) 250 – 360,000 – 1,500 2.0 – 4.0 1,795,000 **The potential quantity and grade of the Exploration Target is conceptual in nature, and there has so far bee

  19. Slide 19: Compelling Investment Case

    Compelling Investment Case Global Gold Developing Mines Relative Strengths  Simple open pit – low initial cost and lead time  Alluvial Mining Income Generation whilst mine construction in progress  Good mining jurisdiction  Major exploration potential and Fair Bride depth continuity  At end of