Barrick Mining Corporation · TSX:ABX

Barrick Mining — Barrick Gold — Q2 2014 Earnings Presentation

20 slides from Barrick Mining's earnings presentation, Jul 31, 2014

  1. Slide 1: Second Quarter 2014 Results

    Second Quarter 2014 Results Conference Call / Webcast – July 31, 2014 1

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes "forward-looking statements”. All statements, o

  3. Slide 3: Second Quarter 2014 Results

    Second Quarter 2014 Results Jamie Sokalsky Kelvin Dushnisky Jim Gowans Ammar Al-Joundi Darian Rich Outgoing President and CEO Co-President Co-President Senior Executive Executive Vice President, Vice President and CFO Talent Management 3

  4. Slide 4: Second Quarter 2014 Highlights

    Second Quarter 2014 Highlights  Adjusted net earnings of $159M ($0.14/share)(1)  Net loss of $269M ($0.23/share) includes $514M impairment charge for Jabal Sayid – goodwill and asset impairments of $316M and $198M  Operating / adjusted operating cash flow of $488M(1)  Reduced mid-year 2014 guida

  5. Slide 5: Second Quarter Operating Highlights

    Second Quarter Operating Highlights  Gold production  Lower capital spending 1.5 Moz  External spend reductions AISC ($/oz) being sourced from: $910 – improved pricing and contracts $865 – elimination of contractors/in-sourcing – reductions to inventory, working capital and better maintenance pla

  6. Slide 6: Improvements to 2014 Guidance

    Improvements to 2014 Guidance(1)  Lowest AISC of senior peers AISC(2) ($/oz) Adj. Op. Costs(2) CAPEX ($B) ($/oz) 980 2.7 Guidance 940 2.5 Range 640 920 630 2.4 900 2.2 590 580 Original Revised Original Revised Original Revised 2014 2014 2014 2014 2014 2014 700 400 1.0 (1) See final slide #2. (2) Se

  7. Slide 7: Cornerstone Mines

    Cornerstone Mines CORTEZ PUEBLO VIEJO LAGUNAS NORTE VELADERO GOLDSTRIKE 7

  8. Slide 8: Cortez

    Cortez  Q2 performance impacted by lower than expected grades  2014 production expected at low end of 925,000-975,000 ounce range and AISC at high end of $750-$780 per ounce range 8

  9. Slide 9: Goldstrike

    Goldstrike  Better than expected performance in Q2  Patented thiosulfate process on schedule for Q4; brings production forward  2014 production expected at high end of 865,000-915,000 ounce range and AISC at low end of $920-$950 per ounce range 9

  10. Slide 10: Pueblo Viejo

    Pueblo Viejo  Autoclaves have achieved targeted and sustainable run rates  2014 production expected at 600,000-700,000 ounces and AISC to be at the high end of the $510-$610 per ounce range 10

  11. Slide 11: Lagunas Norte

    Lagunas Norte  Q2 impacted by construction delay on Phase 5 leach area  Higher grades and recoveries expected in second half  2014 production expected at high end of 570,000-610,000 ounce range and AISC at low end of $640-$680 per ounce range 11

  12. Slide 12: Veladero

    Veladero  Strong operating quarter with better than anticipated costs  2014 production expected at high end of 650,000-700,000 ounce range and AISC at low end of $940-$990 per ounce range 12

  13. Slide 13: Q2 Copper Operating Results

    Q2 Copper Operating Results LUMWANA ZALDIVAR  Conveyor repaired and  Steady generator of free processing re-started ahead cash flow with first quartile of schedule three weeks ago costs  67 million pounds at C1 cash costs of $2.04 per pound(1)  2014 total copper guidance unchanged: 410-440 milli

  14. Slide 14: Jabal Sayid – 50/50 JV Agreement

    Jabal Sayid – 50/50 JV Agreement  Agreement allows project to advance  Production anticipated to begin in late 2015  100-130 Mlbs of copper in concentrate at first quartile C1 cash costs expected in first full five years 14

  15. Slide 15: Future Growth Opportunities

    Future Growth Opportunities  Deep pipeline with strong potential to exceed risk- adjusted hurdle rates of return  Advancing several projects in Nevada through the prefeasibility stage (PFS) Near Mine Orebody Mine Third Party Exploration(1) Extensions Expansions Opportunities  Maximize  Excellent

  16. Slide 16: Cortez Camp / Goldrush

    Cortez Camp / Goldrush Cortez Camp 18 Moz production to date 11 Moz reserves(1) 4.9 Moz M&I resources(1) 0.9 Moz inferred resources(1) Portal Cortez Hills Open and Conceptual untested Exploration Decline Goldrush 10 Moz M&I resources(1) 5.6 Moz inferred resources(1) (1) See final slide #4. 16

  17. Slide 17: Pascua-Lama: Ramp-Down Completed

    Pascua-Lama: Ramp-Down Completed  Expect to incur costs of ~$0.30B(1) in 2014  Continuing to evaluate options to improve risk-adjusted returns (strategic partnerships, royalty/streaming deals)  MoU with Chilean indigenous groups signed in May (1) See final slide #5. 17

  18. Slide 18: Improving Financial Flexibility

    Improving Financial Flexibility  Focused on debt reduction to further enhance balance sheet flexibility  Only $0.3B of debt maturing through 2015 and $1.0B through 2017 Scheduled Debt Repayments(1) 7.0 6.0 5.0 4.0 $1.0B 3.0 2.0 $0.3B 1.0 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023+ (1) As

  19. Slide 19: A Stronger, More Flexible Barrick

    A Stronger, More Flexible Barrick  Disciplined capital allocation framework continues to guide every decision  Focus on operational excellence has resulted in lower cost guidance two years in a row  Optimized portfolio has some of the world’s best assets  Excellent pipeline of development projec

  20. Slide 20: Footnotes

    Footnotes 1. Adjusted net earnings, adjusted net earnings per share, adjusted operating cash flow, all-in sustaining costs per ounce (“AISC”), adjusted operating costs per ounce and C1 cash costs per pound are non-GAAP financial performance measures with no standardized definition under IFRS. See pa