Vendetta Mining Corp. · TSXV:VTT

Vendetta Mining — Investor Presentation (October 2017)

28 slides from Vendetta Mining's investor presentation, October 2017

  1. Slide 1: Advanced Lead-Zinc Resource Development

    Slide 1: Advanced Lead-Zinc Resource Development

    Advanced Lead-Zinc Resource Development October 2017 Pegmont Deposit Queensland, Australia

  2. Slide 2: Important Information

    Slide 2: Important Information

    IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publ

  3. Slide 3: Report Card

    Slide 3: Report Card

    REPORT CARD Vendetta Mining Corp. VTT : TSX-V • C$9M - Total $ Raised • Cash ~$2M Property Payments • A$750K paid - A$1.5M remaining Exploration Expenditure • A$6M to date Option Commitments Met Total Metres Drilled • 24,500 m (2014-2017) Option Commitments Met Cost per Metre Drilled • 2017 Program

  4. Slide 4: Senior Management and Board of Directors

    Slide 4: Senior Management and Board of Directors

    SENIOR MANAGEMENT AND BOARD OF DIRECTORS Michael Williams Peter Voulgaris David Baker Doug Flegg Doug Ramshaw B B.Eng.(Hons), MEngSci. MAusIMM, MAIG MBA CA MBA CFA B.Sc.(hons), A.R.S.M President, CEO, Director Director, Qualified Person Director (independent) Director (independent) Director (indepen

  5. Slide 5: Consultants & Advisors

    Slide 5: Consultants & Advisors

    CONSULTANTS & ADVISORS Ocean Partners David Esser Geoff Richmond B.Sc. (Hons) Geology, MAIG B.Sc. (Metallurgy) FAusiMM Concentrate Marketing Advisor Contract Exploration Manager Contract Chief Metallurgist Ocean Partners Holdings Limited is a base and precious metals concentrate trader providing Ove

  6. Slide 6: Corporate Structure

    Slide 6: Corporate Structure

    CORPORATE STRUCTURE Shares Issued and Outstanding* 119,246,491 Warrants ($0.13 | exp. 09/18) 1,010,000 Warrants ($0.10 | exp. 05/18) 25,580,000 Warrants ($0.20 | exp. 05/19) 11,263,328 Options ($0.25 | exp. 10/18) 1,125,000 Options ($0.15 | exp. 12/21) 5,100,000 Options ($0.15 | exp. 10/22) 4,850,00

  7. Slide 7: Transaction (all amounts in Australian dollars)

    Slide 7: Transaction (all amounts in Australian dollars)

    TRANSACTION (ALL AMOUNTS IN AUSTRALIAN DOLLARS) Amended Agreement • Option to acquire 100% December 2015 Status • $2.25m cash payments over 4.5 On TSX:V Approval $250,000 Paid years - $1.5m remaining 2014 Drill Program $350,000 Paid Completed by Vendor • $3m in exploration expenditures over During 2

  8. Slide 8: Mount Isa – McArthur River Province – Lead & Zinc

    Slide 8: Mount Isa – McArthur River Province – Lead & Zinc

    MOUNT ISA – MCARTHUR RIVER PROVINCE – LEAD & ZINC McArthur River – Glencore • Production cut backs Myrtle & Teena – Teck • Teck exercised pre-emptive right to acquire Rox’s 30% for total value of $19.6m Century – New Century Resources, Tails Retreatment Project • MMG sold closed open pit operation f

  9. Slide 9: Infrastructure

    Slide 9: Infrastructure

    INFRASTRUCTURE Australia^ 2nd Largest lead producer 2nd Largest zinc producer 4th Largest silver producer Queensland* Australia's largest producer of copper, lead and zinc* Home to over 100 metalliferous mines www.vendettaminingcorp.com | TSXv : VTT ^ Source: U.S. Geological Survey, Mineral Commodit

  10. Slide 10: Infrastructure

    Slide 10: Infrastructure

    INFRASTRUCTURE • 28 km from South32’s Cannington Mine, one of the world’s largest lead and silver mines (3.2 Mtpa) • 25 km from Chinova’s Osborne copper-gold Mine (2Mtpa) • Concentrate rail loading sidings at Phosphate Hill and Cloncurry Mt Isa, a regional mining centre Korea Zinc Townsville: Refine

  11. Slide 11: June 2017 Mineral Resource Update

    Slide 11: June 2017 Mineral Resource Update

    JUNE 2017 MINERAL RESOURCE UPDATE Area Classification Material type Tonnes (kt) Pb % Zn % Ag g/t Transition 685 5.2 2.5 9 Indicated Sulphide 1,379 5.7 2.7 11 Open Pit Total 2,064 5.5 2.6 10 (Zones 1,2,3, & BHZ) Transition 1,035 5.3 2.6 8 Inferred Sulphide 5,276 5.5 2.4 9 Total 6,311 5.4 2.4 9 Underg

  12. Slide 12: Geology

    Slide 12: Geology

    GEOLOGY • Broken Hill Type deposit : Mid Proterozoic stratiform, hosted in banded iron formation and garnet rich quartzite • Galena and Sphalerite mineralisation, banded semi massive to massive • Country rock is a high grade metamorphic quartzite grading out to gneisses (meta-sediments) • Tight isoc

  13. Slide 13: 2017 Drilling Highlights

    Slide 13: 2017 Drilling Highlights

    2017 DRILLING HIGHLIGHTS NOT INCLUDED IN JUNE 2017 MINERAL RESOURCE Zone 2 PVRD067 8.4 m @ 11.30% Pb+Zn (8.05% Pb, 3.24% Zn) PVRD074 6.2 m @ 14.64% Pb+Zn (11.43% Pb, 3.21% Zn) PVRD079 9.1 m @ 11.06% Pb+Zn (7.45% Pb, 3.61% Zn) Zone 3 PVRD059 6.6 m @ 10.14% Pb+Zn (6.71% Pb, 3.42% Zn) PVRD060 7.0 m @ 1

  14. Slide 14: Zones 1, 2 & 3 - Shallow High Grade

    Slide 14: Zones 1, 2 & 3 - Shallow High Grade

    ZONES 1, 2 & 3 - SHALLOW HIGH GRADE • Located on mining lease ML2621 • Oxide mineralisation excluded from project planning • Zones 1 and 2 Open Pit Target - Transition and Sulphide mineralisation, 20 to ~190 m below surface • Zones 3 Underground Target [potential Room & Pillar] - Sulphide mineralisa

  15. Slide 15: Burke Hinge Zone (BHZ) – Open Pit Target

    Slide 15: Burke Hinge Zone (BHZ) – Open Pit Target

    BURKE HINGE ZONE (BHZ) – OPEN PIT TARGET • Located on mining lease ML2621 • Located 300 m to the NE of Zone 2 mineralisation • Shallowest known sulphide mineralisation at Pegmont (commencing approx. 24 m below surface) with Transition (70-80% sulphide) outcropping at surface • 250 m Strike length, d

  16. Slide 16: Exploration Success - Bridge Zone

    Slide 16: Exploration Success - Bridge Zone

    EXPLORATION SUCCESS - BRIDGE ZONE • Located on mining lease ML2621 • Successfully drill tested conceptual target: the connection of the moderate dipping BHZ & the flat dipping Zone 2 • Syncline Targets 1 & 2 remain to be tested • Drilling continuing with a goal to outline an Inferred Resource for th

  17. Slide 17: Zone 5 – Increasing Zinc Grades

    Slide 17: Zone 5 – Increasing Zinc Grades

    ZONE 5 – INCREASING ZINC GRADES • Located on EPM 26210 • Known strike length 500 m • Zinc grades continue to improve towards SW and Zinc to Lead ratios approaching or exceeding 1:1 • Open down dip and down plunge to NE and SW • Open Cycle Metallurgical test work completed, see Page 18 • Maiden under

  18. Slide 18: Metallurgy

    Slide 18: Metallurgy

    METALLURGY • Open Cycle Flotation Test Work performed on diluted composites of sulphide from BHZ and Zone 5 Lenses B and C, plus BHZ transition. • Separate, marketable lead and zinc concentrates produced in call cases. • Bond Ball Work Index: BHZ Sulphide 16.6 kWh/t and Zone 5 Lens B 19.4 kWh/t, pla

  19. Slide 19: Exploration Upside

    Slide 19: Exploration Upside

    EXPLORATION UPSIDE • New Copper-Gold Target • PVR040 : 3 m of 3.21% Cu, 0.57 g/t Au • High grade centred on 10 m wide alteration halo • Co-incident >800 m long EM conductor • Intersection is co-incident with modelled top of the EM conduction, 100 m below surface. • Similar geological model as at Kul

  20. Slide 20: Exploration Upside Continued

    Slide 20: Exploration Upside Continued

    EXPLORATION UPSIDE CONTINUED • BONANZA • BHZ “look-a-like”, two moderately dipping lenses • Same structural position as BHZ • Limited exploration drilling: • PMRD037 5.0 m @ 3.06% Pb, 3.69% Zn • PMRD038 3.4 m @ 2.27% Pb, 3.42% Zn • Encouraging Pb:Zn ratios, potential to develop a shallow open pit ta

  21. Slide 21: Comparisons: Selected TSX Projects

    Slide 21: Comparisons: Selected TSX Projects

    COMPARISONSSelected TSX Projects – Resource Tonnes & Lead / Zinc Grade Comparison 50 25% 40 20% LEAD + ZINC % TONNES (Mt) 30 15% 20 10% 10 5% 0 0% Measured Indicated Inferred Pb+Zn % Note : tonnes represents companies project equity, based on the most recently available public disclosure documents a

  22. Slide 22: The Next 100 Days

    Slide 22: The Next 100 Days

    THE NEXT 100 DAYS Drilling Continues into December Resource extensions on Open Pit targets Zones 1, 2 and 3 Copper-Gold Exploration Target – following up PVR040 and +800 m ground EM Anomaly Additional Drilling in Bridge Zone discovery Open Pit Wall Geotechnical Drilling Program Metallurgical Samplin

  23. Slide 23: VTT Share Price

    Slide 23: VTT Share Price

    VTT SHARE PRICE 4,000,000 $0.40 Zone 5 & BHZ Met 43-101 Resource Zone 3 Bridge Zone Average Volume: Results Update Results Discovery 3,500,000 • Last 12 Months: 308,214 Zone 5 & Z Fold Zone 2 &3 $0.35 Results Results • Last 6 Months 269,542 EM Survey Cu 3,000,000 Copper-Gold Target $0.30 $4.2M Finan

  24. Slide 24: Appendices

    Slide 24: Appendices

    APPENDICES • Geological Model : Broken Hill Type Model • Ground Conditions • Zinc : Upward Price Pressure www.vendettaminingcorp.com | TSXv : VTT 24

  25. Slide 25: Geological Model: Broken Hill Type Model

    Slide 25: Geological Model: Broken Hill Type Model

    GEOLOGICAL MODEL : BROKEN HILL TYPE MODEL What is a Broken Hill Type Deposit • Not as common as VMS but with similarities. • Sedimentary basins overprinted by high-grade metamorphism (amphibolite or granulite) • Stacked lenses with low aspect ratio (longer & wider compared to thickness) • Mineralisa

  26. Slide 26: Ground Conditions

    Slide 26: Ground Conditions

    GROUND CONDITIONS Ground Conditions at Pegmont would be classified as “very good” on Barton’s Q system. The deposit is hosted in a quartzite, characterised by very low joint counts, 100% RQD and high intact rock strength (UCS ~100 to 150MPa estimated). There is also a distinct lack of faulting, geol

  27. Slide 27: Zinc: Upward Price Pressure

    Slide 27: Zinc: Upward Price Pressure

    ZINC : UPWARD PRICE PRESSURE Mine closures/reductions since 2013 have removed about 15% of the global supply outpacing Mine closures to alter foreseeable new mine development. supply / demand balance • Brunswick Mine – Xstrata (250 ktpa) – CLOSED 2013 Delays in new mine • Perseverance Mine – Glencor

  28. Slide 28: For more information please contact

    Slide 28: For more information please contact

    For more information please contact: Matthew Sroka Corporate Development Tel: 604 484 7855 Cel: 604 219 2140 Email: ms@vendettaminingcorp.com Suite 1500 - 409 Granville Street Vancouver, BC V6C 1T2

Source: Internet Archive copy of vendettaminingcorp.com