  1. Slide 1: Kibali continues to unlock value as we grow our future together

    Operated by Kibali continues to unlock value as we grow our future together…. Kinshasa, October 2022

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    Cautionary Statement on Forward- Looking Information Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements,

  3. Slide 3: Partnering with our host countries

    Barrick Partnering with our host countries purpose is foundational Loulo-Gounkoto 1 (80%) to our business operates on 4 Tongon (89.7%) continents in 18 countries Partnering with Reko Diq2 our host (24.5%) countries is foundational to our business purpose In April 2020, Porgera was placed on care and

  4. Slide 4: Kibali investment in the DRC exceeds $4.2 billion

    Kibali investment in the DRC exceeds $4.2 billion… OPENED UP ECONOMY IN NE DRC CREATING SUSTAINABLE BUSINESSES – EDUCATION AND SKILLS TRAINING 2009 2010 2010 2011 2012 2012 2013 2013 Randgold and SOKIMO offered to Kibali doubles Construction Social upliftment - Portion of permit Resettled 4,200 Pour

  5. Slide 5: Q3 update

    Q3 update… Delivering on the 2022 business plan Arthur Kabila appointed as first Congolese general manager at Kibali Continued progress on reserve replacement beyond depletion to maintain a +10yr life of mine as a Tier One operation Lode 11’000 continues to deliver promising results and shows potent

  6. Slide 6: Health and safety

    Health and safety… Safety LTIFR4 2 lost time injuries (LTI) recorded for the quarter 7 Investigations conducted and preventive measures put in place 6 Kibali had a significant reduction in its Total Recordable Incident Frequency Rate 5 (TRIFR4) of 1.13 compared to 1.88 for the same period in 2021 4

  7. Slide 7: Kibali a Tier One operation

    Kibali…a Tier One operation Performance (100% Basis) Underground Ounce Performance Improved delivery for third consecutive quarter from underground (100% Basis) operations, with ~155 koz mined 160,000 Plant throughput improved by 15% from Q1 2022 to Q3 2022 at 150,000 140,000 1,996kt processed in Q3

  8. Slide 8: Expanding the exploration pipeline

    Expanding the exploration pipeline…  Ongoing drilling at Mengu Hill down plunge for UG opportunity is intersecting lithology and mineralized system as projected 2021 Resource Pit 2021 Reserves Pit  Drilling to test high-grade mineralization down plunge at Agbarabo and Rhino has commenced for UG op

  9. Slide 9: Kibali 11 000 Lode continues to provide growth

    Kibali…11 000 Lode continues to provide growth SW NE Underground operations extended by two additional years with Lode 11 000 Sessenge KCD Pit that continues to deliver promising Pit results Lodes 3000, 5000 and 11 000 still remain open down plunge with a continued focus on drilling programmes to un

  10. Slide 10: Kibali upcoming rock winder mechanical upgrade

    Kibali…upcoming rock winder mechanical upgrade Scheduled the rock winder upgrades during Q4 2022 with operational readiness in 21 days starting from October 13, 2022 on track Upgrades secure consistent ore delivery as we continue to grow our underground operations Transition of shrinkage cracks Pini

  11. Slide 11: Cost efficient operations with world class hydroelectric stations

    Cost efficient operations with world class hydroelectric stations… Total Power Generation MW 40 0.30 35 0.25 30 0.20 25 20 0.15 15 0.10 Q3 hydroelectric power blend 10 averaging at 87%, reducing the 0.05 impact of higher diesel prices 5 including a reduction in Kibali’s 0 - carbon footprint Sep-18 S

  12. Slide 12: Environmentally focused

    Environmentally focused… Regular in-house aquatic monitoring within all the surface water Fresh water abstracted per tonne of 1.2 ponds at the mine – especially where operations effluent is revealing ore treated 1.0 a high fish population 0.8 ISO 14001 certification maintained – internal audit was c

  13. Slide 13: Investing in the future of Africa's biodiversity

    Investing in the future of Africa’s biodiversity… Revised and final outline plan released for the reintroduction of white rhino into the Garamba National Park The plan envisages the relocation of 76 white rhinos to Garamba - critical in the long-term plan to protect this endangered species This proc

  14. Slide 14: Community development

    Community development… Stakeholder Engagement Kokiza Catholic Church (2,500 seats) handover and commitment to assist with future church maintenance Ongoing engagement with different stakeholders Education/Capacity building/Garamba alliance Partnerships for biodiversity conservation ongoing Two moder

  15. Slide 15: Some of our achievements

    Some of our achievements… Investing in the youth (Bursary program) Official launch of the steering committee for the Soccer tournament and our workforce community development fund by the Minister of Mines

  16. Slide 16: Growing our future through investing in education

    Growing our future through investing in education… Continued investment in training and upskilling of young talent in and around our local community Focused on multi-skilling our workforce across different disciplines such as Mining, Geology, Chemistry and Metallurgy In 2022, Kibali offered a total

  17. Slide 17: Endnotes

    Endnotes 1. A Tier One Gold Asset is an asset with a reserve potential to deliver a minimum 10-year life, annual production of at least 500,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve. 2. On March 20, 2022, Barrick and th