Saracen Mineral Holdings Limited

Saracen Mineral — Diggers & Dealers Mining Forum 2016

24 slides from Saracen Mineral's conference presentation, August 2016

  1. Slide 1: A growing mid-tier gold miner

    A growing mid-tier gold miner RALEIGH FINLAYSON MANAGING DIRECTOR Diggers & Dealers Mining Forum August 2016

  2. Slide 2: Qualification

    Qualification This presentation has been prepared by Saracen Mineral Holdings Limited (Saracen or the Company) based on information from its own and third party sources and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, despat

  3. Slide 3: Corporate overview

    Corporate overview Corporate structure (ASX:SAR) Board Shares 800.8m Non-Executive Chairman Geoff Clifford Share price A$1.76 Managing Director Raleigh Finlayson Market cap A$1.4b (US$1.05b) At 2 August Non-Executive Director Mark Connelly 2016 Liquidity 30-day ADV 11.2m shares Non-Executive Directo

  4. Slide 4: Australia's newest mid-tier gold miner

    Australia’s newest mid-tier gold miner • Production to hit ~300kozpa by the June Q 2017, AISC declining to A$950/oz in FY20, driving substantial increases in cash-flow • Two operational centres in Western Australia:  Carosue Dam (NE of Kalgoorlie) – Outstanding operational track record, multiple hi

  5. Slide 5: Plan the mine, mine the plan

    Plan the mine, mine the plan Five-year production outlook (83% classified as Reserves) 300 $1,500 $1,250 $1,150 $1,095 $1,050 $950 200 $1,000 Production (koz) 130 130 AISC (A$/oz) 31 125 140 100 $500 157 155 170 170 160 0 $0 FY16 (A) FY17 (F) FY18 (F) FY19 (F) FY20 (F) CDO (koz) TBO (koz) Group AISC

  6. Slide 6: More than meets the eye…

    More than meets the eye… Five-year outlook Deposits discovered within last 30 years (v ~100 years Goldfields) Karari Growth King of the Hills Average depth of SAR underground mines ~350m (v peers ~680m) FY17 exploration budget A$42m (v A$25m over the past 2 years) Deep South Red October All depo

  7. Slide 7: Judicious allocation of capital

    Tripling of exploration budget Judicious allocation of capital Project Sep-16 Qtr Dec-16 Qtr Mar-17 Qtr Jun-17 Qtr TOTAL $m Thunderbox Thunderbox Zone A UG 9.3 $9.3 King of the Hills 3.3 $3.3 Carosue Dam Red October 2.5 $2.5 Deep South 6.8 $6.8 Karari 9.1 $9.1 Whirling Dervish 8.2 $8.2 Greenfields R

  8. Slide 8: Carosue Dam - Overview

    Carosue Dam - Overview • 2.4Mtpa CIL plant, operated since 2010 • FY17 outlook 155koz • Ore sources include: • Karari – Shallow, multiple lodes, growing discovery next to the plant, open in all directions • Deep South – Shallow, stoping underway, open in all directions • Red October – Small volume /

  9. Slide 9: Carosue Dam – We have baseload!

    Carosue Dam – We have baseload! Underwritten by growth deposits: • Highly productive Karari UG mine ~500m from the mill • Whirling Dervish UG option (technically advanced, permitted) <1km from the mill • Plus 32koz stockpile At the mill • Augmented by higher grade Deep South ~80km from the mill 9

  10. Slide 10: Carosue Dam – Drill momentum

    Carosue Dam – Drill momentum Karari Deep South Aggressive drilling Aggressive drilling Dedicated drill Dedicated drill platforms installed platforms planned with “shelf life” with “shelf life” Recent drill results Deepest hole i.e. include: 18m @ 7.4g/t (outside the Reserve) 16.6m @ 8.2g/t commands

  11. Slide 11: Thunderbox – We've only just begun

    Thunderbox – We’ve only just begun • Developed ahead of schedule and under budget • 2.5Mtpa CIL plant, A$63m pre-production capex invested • Stage 1 open pit – 596koz contained, ~A$1000/oz AISC (US$750/oz), 4-5 year mine life • Fixed price contracts cover ~50% diesel usage over next two years (A$0.6

  12. Slide 12: Thunderbox – Gets better every day

    Thunderbox – Gets better every day Simple, robust open pit: • A Zone • High productivity, low cost • Top down method (no pit staging) • As the mine progresses: Strip ratio falls (waste:ore) Grade rises AISC falls Cash flow increases dramatically 12

  13. Slide 13: Thunderbox – Gets better every day

    Thunderbox – Gets better every day Gets better with depth: • Ditto C Zone i.e. AISC falls and cash flow increases dramatically as the mine progresses 13

  14. Slide 14: Thunderbox – Drilling the next chapter

    Thunderbox – Drilling the next chapter Potential >10 year mine life: • +30,000m drilling to commence Sep Q 2016 • Targeting down-plunge A Zone • Follow-up rich hole 55m @ 3.0g/t (TBDR019) • Drilling will aim to define a multi-year bulk underground mine 14

  15. Slide 15: Thunderbox growth – King of the Hills

    Thunderbox growth – King of the Hills Sleeping giant... awakens: • Mining and drilling underway • Very large mineralised system • Plethora of early high grade drill results (estimated true width in brackets): • 14.8m @ 29.1g/t (10.2m) • 12.7m @ 11.6g/t (2.5m) • 6.4m @ 21.9g/t (1.5m) • 1.4m @ 30.1g/t

  16. Slide 16: Carosue Dam - Exploration upside

    Carosue Dam - Exploration upside Land of opportunity: • Two high quality structural zones • Limited exploration budget in recent years due to focus on Thunderbox development… • …enabled the technical knowledge to prepare and de-risk an aggressive campaign • Multiple high quality targets systematical

  17. Slide 17: Carosue Dam – Exploration upside

    Carosue Dam – Exploration upside North Lake Carey… in the purple circle: • Neighbours (AngloGold, Goldfields, Dacian) are extremely active • With good reason! Wallaby +8Moz Sunrise Dam +10Moz Granny Smith +2Moz Mt Morgans +3Moz, growing • Looking for the next big one • SAR drilling in June half FY17

  18. Slide 18: Relative value

    Relative value Annual production (koz) EV / production (A$/oz) 800 7,000 700 6,000 600 5,000 500 4,000 400 3,000 300 2,000 200 100 1,000 0 0 Regis (RRL) Evolution (EVN) Northern Star (NST) St Barbara (SBM) Saracen (SAR) Evolution (EVN) Northern Star (NST) St Barbara (SBM) Regis (RRL) Saracen (SAR) A

  19. Slide 19: Saracen is a progressive business

    Saracen is a progressive business From… …to… Delivery Met or exceeded guidance 4 years straight Meeting or exceeding guidance Operating cash flow FY16A A$110m (unaudited) Consensus FY17F A$180m* Production ~150koz pa from 1 operation >300koz pa from 2 operations Balance sheet Retired debt, internall

  20. Slide 20: APPENDIX A – Ore Reserves – June 2015

    APPENDIX A – Ore Reserves – June 2015 Mine Proved Reserves Probable Reserves Total Ore Reserves Location District Deposit Type tonnes g/t oz tonnes g/t oz tonnes g/t oz Karari 1 UG 2,213,000 3.0 212,000 2,213,000 3.0 212,000 Carosue Dam Whirling Dervish UG 950,000 3.0 90,000 950,000 3.0 90,000 Caros

  21. Slide 21: APPENDIX A – Mineral Resources – June 2015

    APPENDIX A – Mineral Resources – June 2015 Measured Indicated Inferred Total Location District Deposit tonnes g/t oz tonnes g/t oz tonnes g/t oz tonnes g/t oz Whirling Dervish O/P 5,619,000 1.5 277,000 305,000 1.1 11,000 5,924,000 1.5 288,000 Whirling Dervish U/G 4,400,000 2.4 355,000 1,624,000 2.7

  22. Slide 22: APPENDIX A – Mineral Resources – June 2015

    APPENDIX A – Mineral Resources – June 2015 Thunderbox 27,278,000 1.7 1,516,000 9,940,000 1.6 505,000 37,218,000 1.7 2,021,000 Mangilla 726,000 2.1 48,000 278,000 2.1 19,000 1,004,000 2.1 67,000 Thunderbox Rainbow 226,000 1.5 11,000 588,000 1.2 23,000 909,000 1.0 30,000 1,723,000 1.2 64,000 Thunderbo

  23. Slide 23: APPENDIX A – Competent persons

    APPENDIX A – Competent persons Competent Persons Statements The information on Mineral Resources and Ore Reserves has been extracted from the ASX announcements titled “2015 Mineral Resources and Ore Reserves” dated 15 October 2015, and “Resource and Reserve upgrade, Carosue Dam set for long life” da

  24. Slide 24: Contact Details

    Contact Details Troy Irvin Corporate Development Officer Phone: +61 8 6229 9100 Email: info@saracen.com.au Website: www.saracen.com.au

Saracen Mineral Holdings — Diggers & Dealers Mining Forum 2016 on 6ix