Sylvania Platinum Ltd. · LSE:SLP

Sylvania Platinum — Corporate Update (April 2011)

31 slides from Sylvania Platinum's corporate update, Apr 4, 2011

  1. Slide 1: Operational Update

    For immediate release 4 April 2011 SYLVANIA PLATINUM LIMITED ARBN 147 331 726 (ASX: SLP; AIM: SLP) OPERATIONAL UPDATE The Sylvania Platinum Board today announces the following operational update on its PGM production projects, tailings retreatment operations and near surface exploration projects. Hi

  2. Slide 2: Lannex Plant Production Ramp Up and Mooinooi Expansion

    Upside potential from Magnetite Iron ore identified on Northern limb exploration permit. Terry McConnachie the Sylvania CEO commented: “A new chapter in the Sylvania evolution has just started. We now have our Dump operations ramping up as planned where we expect to see 40,000 ounces produced for th

  3. Slide 3: Mooinooi Construction Progress and Northern Limb Resource

    The Sylvania construction progress (status 1 April 2011) is at 80% whilst the host mine construction progress (status 1 April 2011) is currently on 67% with completion expected by June 2011. Project Fundamentals: 1. The MG2 seam will now be mined thus giving a valuable source of chrome and PGMs as w

  4. Slide 4: MSA Inferred Resource Estimates

    Within MSA’s report of 30th March 2011, Inferred Resources are estimated at various cut off grades, a 15% discount for geological disturbances and an open pit depth limitation of 100m. A summary of the results at 1 g/t cut-off indicates a resource of 4.99 million PGM ounces (2E), 137 million pounds

  5. Slide 5: Smelter Feasibility Review and Volspruit Mine

    From the encouraging results achieved during these trials the decision was taken to appoint consultants to the project to compile a technological and economic feasibility review. This is expected to be concluded in June 2011. The above arrangements are not expected to alter the timeline for the smel

  6. Slide 6: Contacts in United Kingdom

    In United Kingdom Anthony Rowland/ Ben Wright Ambrian Partners Limited +44 (0) 20 7634 4700 Laurence Read/Beth Harris Threadneedle Communications +44 (0) 20 7653 9855

  7. Slide 7: Introducing Sylvania Platinum

    Introducing Sylvania Platinum Terry McConnachie CEO Nigel Trevarthen Deputy CEO Louis Carroll CFO www.sylvaniaplatinum.com

  8. Slide 8: Disclaimer

    Disclaimer Certain forward-looking statements may be contained in this presentation which include, without limitation, expectations regarding platinum prices, estimates of production, operating expenditure, capital expenditure and projections regarding the completion of capital projects as well as t

  9. Slide 9: Investment Summary

    Investment Summary “Low Cost, Low Risk, High Margin” • Experienced management team • Scheme of Arrangement completed March 2011 • Track record of design and construction – 5 chrome tailings processing plants fully operational – 6 by 2012 • Established producer – Owner – Operator since 2007 – FY 2010

  10. Slide 10: Financial Performance

    Financial Performance 6 months to Dec 2009 6 months to Jun 2010 6 months to Dec 2010 H1 FY10 H2 FY10 H1 FY11 Total 3E and Au Oz 11,408 14,588 18,530 Gross Basket Price US$/oz 1,273 1,406 1,558 Revenue R’000 77,889 120,705 139,090 Gross Cash Margin % 41% 44% 45% Operating Profit R’000 34.3 52.2 48.2

  11. Slide 11: Sylvania in brief

    Sylvania in brief • Significant Resources – Dump Material , Current Arisings & Run of Mine – Volspruit Mine (Northern and Southern Ore Bodies) Measured Indicated / Inferred PGM 1.15 Million oz 2.44 Million oz Nickel 87.8 Million lbs 174.8 Million lbs Copper 25.5 Million lbs 51.5 Million lbs  Source

  12. Slide 12: Sylvania in brief

    © Sylvania in brief S¥YLVANIA PLATINUM LimiTtEeD LOCALITY WITHIN SOUTH AFRICA LEGEND: INFRASTRUCTURE GEOLOGY | iz ~~. Roads Younger Cover Rocks: N ~~, Main Ri Ye cai itrusion: Cracouw (SLV) 5 eenprenao eta Carre | ole A R Mineral Projects Granites and allied rocks ~ | se Hae Se ceun! | a 4 Cperatng

  13. Slide 13: Sylvania Dump Operations (SDO)

    Sylvania Dump Operations (SDO) • Plants designed and built by Sylvania – Based on the pioneering CTRP (SLP 25%) – Sylvania Metals’ SDO now 100% owned by Sylvania Platinum • PGM recovery from Chrome Ore & Tailings now proven – Plants process tailings directly from Samancor plants o Most Samancor mine

  14. Slide 14: Sylvania Dump Operations

    Sylvania Dump Operations Chrome tailings dump & current arisings Chrome Chrome product recovery plant PGM flotation plant Ball mill Thickener PGM concentrate 8

  15. Slide 15: Sylvania Dump Operations (including CTRP)

    Sylvania Dump Operations (including CTRP) • Encouraging Results – H1 FY2010 (6 mnths to 31 Dec) – Half year production of 18,530 oz (+62% y-o-y) o Market guidance of 18,000 oz – Revenue ZAR139m (+ 79% y-o-y) – 45% gross cash margin – Operating profit of A$7.2 million – Unit cash costs at R4,191 / oz

  16. Slide 16: Sylvania Dump Operations Previous market guidance

    Sylvania Dump Operations • Record ounces produced each quarter, continuous growth targets being met – Operations well underway to exceed 40,000 annual oz by June 2011 Market Commitment o Q1: 8,500 Q2: 9,500 Q3: 10,500 Q4: 11,500 2011: 40,000 Q1,2 Act & Forecast o Q1: 8,758 Q2: 9,772 Q3: 10,741 Q4: 1

  17. Slide 17: Volspruit & Northern Limb Project Development Strategy

    Volspruit & Northern Limb Project Development Strategy • Operating Strategy Mine – The Volspuit project becomes the model for future mines • Operations Overview – Open pit mine o Conventional drill and blast o Ore transported to concentrator plant Pelletizer Crushing and Milling – Processing plant F

  18. Slide 18: Company Growth: Volspruit mine, smelter & refinery project

    Company Growth:- Volspruit; mine, smelter & refinery project • Overview – Volspruit mine developed and owned by SLP (74% after BEE) – Volspruit Smelter & Refinery planned to be owned by JV with Sylvania & Jubilee (50:50) • Bulk sample tested through a pilot plant at Mintek – Management is confident

  19. Slide 19: Volspruit Near surface ore body

    Company Growth:- Volspruit; mine, smelter & refinery project Volspruit Near surface ore body 13

  20. Slide 20: Volspruit Project Schedule Milestone Summary

    Volspruit Project Schedule Milestone Summary • Project remains on track for October 2013 • Detailed project schedules in place – High confidence of project delivery 14

  21. Slide 21: Company Growth: Northern Limb Projects

    Company Growth:- Northern Limb Projects • Four geological targets or “Hot Spots” identified – Each hot spot could potentially lead to a new mine • New mines will roll out as per the Volspruit model – Mining and processing methods will be “ Cut and paste” from Volspruit – Processing plants identical

  22. Slide 22: Sylvania Platinum Production Targets

    Sylvania Platinum Production Targets • Long term production expected to achieve & maintain 225 000 oz per year 16

  23. Slide 23: Company Growth: Northern Limb Iron Ore

    Company Growth:- Northern Limb Iron Ore • Review of data acquired with Pan Palladium Cracouw • Magnetite Iron ore discovered on prospecting licenses Harriets TN Wish – Deposit runs parallel to the PGM deposit Main Magnetite Layer • Encouraging grades Aurora – Surface Grab Samples o Fe2O3 ranged from

  24. Slide 24: Sylvania in brief

    Sylvania in brief • Listings – Australian Stock Exchange (ASX:SLP) – London’s AIM market (AIM:SLP) – Shares in issue: 301,961,805 – Sylvania Platinum now successfully domiciled in Bermuda • Market Capitalisation: GBP 144.9 million * • Quality Shareholders o Audley; M&G Investment Management; Odey As

  25. Slide 25: Contacts

    Contacts +44 777 533 7175 Terry McConnachie terry@sylvania.co.za UK and South Africa +44 796 917 0622 Louis Carroll louis@sylvania.co.za +27 11 673 1171 South Africa Nigel Trevarthen +27 82 574 2251 nigel@sylvania.co.za Website: Sylvaniaplatinum.com 19

  26. Slide 26: Appendices

    Appendices ‘S) S¥UVANIA ATINRU@M LIBRITaEE

  27. Slide 27: SDO including CTRP Results

    SDO including CTRP Results 21

  28. Slide 28: Company Growth: Northern Limb Hot Spots

    Company Growth:- Northern Limb Hot Spots SYLVANIA RESOURCES -12000 E -11000 E -10000 E -9000 E -8000 E -7000 E -6000 E Hotspots at Aurora-Hacra -2598000 N The MSA Group Date: 29 March 2011N -2598000 0 250 500 750 1000 1250 1500 Metres -2599000 N -2599000 N Kransplaats 422LR Aurora 397LR HOTSPOT 1 Ri

  29. Slide 29: Nth Limb Prospecting Rights

    *Intends to lodge either new Prospecting Right Application for Fe, V, HM, Co, Py, Ag, S – in name of a new company or amend existing Prospecting Rights in terms of Section 102 to include the above minerals Nth Limb Prospecting Rights LP792PR ifo Sika‐Bopha – to be transferred LP679PR ifo RPM – to be

  30. Slide 30: Hotspot Resource Tables by Cut Off

    Area Cut Off Tonnes Density 2PGE+Au Cu Ni Hotspot 1 oxide 2PGE+Au g/t ('000) g/t ppm ppm 1 1.0 13 2.61 1.03 661 509 Area Cut Off Tonnes Density 2PGE+Au Cu Ni Hotspot 1 fresh 2PGE+Au g/t ('000) g/t ppm ppm 1 1.0 76,584 2.71 1.25 414 329 2 1.2 36,750 2.71 1.42 426 326 3 1.4 24,249 2.71 1.48 386 302 4

  31. Slide 31: Northern Limb Inferred Resource Summary

    Northern Limb Inferred Resource Summary To 100m depth Oxide 1 g/t cut off tonnes grade 2E Cu ppm Ni ppm 2E ounces lbs Cu lbs Ni Hot Spot 1 13,000 1.03 661 509 430 18944 14588 Hot Spot 2 113,000 1.09 381 511 3960 94915 127300 Hot Spot 3 - 0 0 0 0 0 0 Hot Spot 4 1,911,000 1.24 434 390 76186 1828438 16

Sylvania Platinum — Corporate Update (April 2011) on 6ix