Klondex Mines Ltd.

Klondex Mines — Corporate Update (September 2015)

26 slides from Klondex Mines's corporate update, September 2015

  1. Slide 1: Fire Creek Site Visit

    THE UNDERGROUND GOLD COMPANY FIRE CREEK SITE VISIT SEPTEMBER 2015 TSX:KDX TSX: KDX OTCQX: KLNDF WWW.KLONDEXMINES.COM

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Qualified Person Brian Morris, Vice President Exploration of Klondex Mines Ltd. (the "Company" or "Klondex") is the qualified person for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") who has reviewed and is responsible fo

  3. Slide 3: Fire Creek Project

    FIRE CREEK PROJECT THE UNDERGROUND GOLD COMPANY TSX: KDX OTCQX: KLNDF 3 WWW.KLONDEXMINES.COM

  4. Slide 4: People: Experienced

    PEOPLE EXPERIENCED FIRE CREEK MANAGEMENT NEVADA MANAGEMENT Mike Isaak Fire Creek Mine Manager Lee Morrison Safety Manager 40 years multi-national 40 yrs in mining with 35 yrs in underground mining Safety, Security and HR experience Management John Marma Chief Geologist Anthony Bottrill Reserves Mana

  5. Slide 5: No Lost Time Accidents at Fire Creek

    PEOPLE EXPERIENCED Bill NO LOST TIME ACCIDENTS ATWatters FIRE CREEK: 1062 DAYS AS OF SEPTEMBER 11, 2015 TSX: KDX OTCQX: KLNDF 5 WWW.KLONDEXMINES.COM

  6. Slide 6: People: On Track to Achieve Our Targets

    PEOPLE ON TRACK TO ACHIEVE OUR TARGETS FIRE CREEK MINE 1H 2014 : 1H FY 2014 1H 2014 1H 2015 2015 Variance Unit (%) People People 52 49 57 +16% Waste Development Feet 3,279 1,409 3,278 +133% Ore Mined Tons 62,910 25,221 36,772 +46% Grade Mined opt AuEq 1.162 1.020 1.031 +1% Ounces Mined GEO’s (1) 73,

  7. Slide 7: People Continue to Increase the Resource Base

    PEOPLE CONTINUE TO INCREASE THE RESOURCE BASE Mineral Resource (3) Increase M&I Mineral Resources from (in 000’s GEO’s) 2014 to 2015 450 (in 000’s GEO’s) 450 400 428 400 420 420 350 350 363 46% 300 300 250 287 250 287 200 200 150 150 100 100 50 50 0 0 FC 2014 FC 2015 2014 2015 Inferred M&I Mineral A

  8. Slide 8: Fire Creek Project

    FIRE CREEK PROJECT THE UNDERGROUND GOLD COMPANY TSX: KDX OTCQX: KLNDF 8 WWW.KLONDEXMINES.COM

  9. Slide 9: Properties – An Emerging Bonanza Vein District

    FIRE CREEK PROPERTIES – AN EMERGING BONANZA VEIN DISTRICT First Au production First high- Klondex Acquires (test heap grade vein Apr 2011 Property leach) intercept Fire Creek bulk Sept Sept March 1933 1975 1981 1996 1999 2004 mining initiated 2012 2013 2014 > 100,000 FT. OF DRILLING > 360,000 FT. OF

  10. Slide 10: Highest Grade Gold Mine in the World

    PROPERTIES HIGHEST GRADE GOLD MINE IN THE WORLD Au Grade, g/t Fire Creek 2015 Mineral Resources (4) (GEOs in 000’s) 50 1.11 opt 1.34 opt AuEq 45 AuEq 0.43 opt 40 420 AuEq 35 399 0.54 opt 30 AuEq 363 25 20 297 15 10 5 0 $800/oz Au $1200/oz Au M&I Inferred Top 10 highest grade underground gold mines L

  11. Slide 11: Powerful Upside Potential: ~93% of Land Package Untested

    PROPERTIES POWERFUL UPSIDE POTENTIAL ~93% OF LAND PACKAGE REMAINS UNTESTED Current Resource LAND TYPE ACRES Public Mining Claims 15,420 Owned Fee Land 1,114 Leased Fee Land 229 Total Land 16,763 TSX: KDX OTCQX: KLNDF 10 11 WWW.KLONDEXMINES.COM

  12. Slide 12: High Grade - Bonanza Veins

    PROPERTIES HIGH GRADE - BONANZA VEINS 32 BONANZA VEINS IDENTIFIED TO-DATE Joyce Vein Vonnie Vein Karen Vein TSX: KDX OTCQX: KLNDF 12 WWW.KLONDEXMINES.COM

  13. Slide 13: Powerful Upside Potential – Emerging District

    PROPERTIES POWERFUL UPSIDE POTENTIAL – EMERGING DISTRICT TSX: KDX OTCQX: KLNDF 13 WWW.KLONDEXMINES.COM

  14. Slide 14: Powerful Upside Potential – Target Rich

    PROPERTIES POWERFUL UPSIDE POTENTIAL – TARGET RICH Numerous Undeveloped High Grade Veins Open in All Directions See End Notes 5 and 6 TSX: KDX OTCQX: KLNDF 14 WWW.KLONDEXMINES.COM

  15. Slide 15: Joyce Vein – Open in All Directions

    PROPERTIES POWERFUL UPSIDE POTENTIAL – TARGET RICH JOYCE VEIN – 129,000 GEO M&I, 28,000 GEO INFERRED, OPEN IN ALL DIRECTIONS OPEN TSX: KDX OTCQX: KLNDF See End Notes 5 and 6 15 WWW.KLONDEXMINES.COM

  16. Slide 16: Vonnie Vein – Open in All Directions

    PROPERTIES POWERFUL UPSIDE POTENTIAL – TARGET RICH VONNIE VEIN –110,000 GEO M&I, 19,000 GEO INFERRED, OPEN IN ALL DIRECTIONS See End Notes 5 and 6 TSX: KDX OTCQX: KLNDF 16 WWW.KLONDEXMINES.COM

  17. Slide 17: Karen Vein – Open in All Directions

    PROPERTIES POWERFUL UPSIDE POTENTIAL – TARGET RICH KAREN VEIN – 116,000 GEO M&I, 10,000 GEO INFERRED, OPEN IN ALL DIRECTIONS See End Notes 5 and 6 TSX: KDX OTCQX: KLNDF 17 WWW.KLONDEXMINES.COM

  18. Slide 18: 2015 Expansion Targets

    PROPERTIES 2015 EXPANSION TARGETS TSX: KDX OTCQX: KLNDF 18 WWW.KLONDEXMINES.COM

  19. Slide 19: Early 2015 Results – West Expansion

    PROPERTIES EARLY 2015 RESULTS – WEST EXPANSION Press release dated, August 4, 2015 TSX: KDX OTCQX: KLNDF 19 WWW.KLONDEXMINES.COM

  20. Slide 20: Early 2015 Results – South Expansion

    PROPERTIES EARLY 2015 RESULTS – SOUTH EXPANSION Vein 6 Grade Thickness Section Press release dated, August 4, 2015 TSX: KDX OTCQX: KLNDF 20 WWW.KLONDEXMINES.COM

  21. Slide 21: Additional Surface Targets

    PROPERTIES ADDITIONAL SURFACE TARGETS 2015 Fire Creek Surface Drilling: • 17, 230 feet • $1.4 million Target Rich: • Up Dip Vein Extensions • Down Dip Vein Extensions • Targets on Existing Trends • New Potential Trends TSX: KDX OTCQX: KLNDF 21 WWW.KLONDEXMINES.COM

  22. Slide 22: Long Hole Open Stope Potential

    PROPERTIES LONG HOLE OPEN STOPE POTENTIAL LONG HOLE OPEN STOPE MINING IN PROGRESS – KAREN VEIN Long Hole Advantages: • Lower Mining Cost • Lower Cutoff Grade • Higher production TSX: KDX OTCQX: KLNDF 22 WWW.KLONDEXMINES.COM

  23. Slide 23: Low Permitting Risk

    PROPERTIES LOW PERMITTING RISK • State Water Pollution Control Permit – Received August 2015 • Federal Environmental Assessment (EA) Permit – Expected by end of 2015 EA will Allow Further Expansion: • Waste Rock Facility • Treated Water Pond • Surface Facility Layout • Additional ventilation raises

  24. Slide 24: 2015 Mine Plan – Disciplined, Low Risk Development

    PROPERTIES 2015 MINE PLAN – DISCIPLINED, LOW RISK DEVELOPMENT TSX: KDX OTCQX: KLNDF 24 WWW.KLONDEXMINES.COM

  25. Slide 25: Thank You! Questions?

    DISCUSSION QUESTIONS ? THANK YOU! TSX: KDX OTCQX: KLNDF 25 WWW.KLONDEXMINES.COM

  26. Slide 26: End Notes

    END NOTES 1. See “Non-IFRS Performance Measures” in Klondex’s Management Discussion and Analysis dated August 10, 2015. GEO’s calculated using actual realized metals prices: FY 2014 68.84:1, H1 2014 61.78:1, H1 2015 71.52:1. 2. 2015 figures are inclusive of mineral reserves. 3. Please see the techni