Akenerji Elektrik Uretim A.s. · BIST:AKENR
Akenerji Elektrik Uretim A.s — ESG Presentation
13 slides from Akenerji Elektrik Uretim A.s's sustainability presentation
Slide 1: Carbon Market Mechanism & Sustainable Development
Carbon Market Mechanism & Sustainable Development
Slide 2: Agenda
AGENDA 1- Introduction to Carbon Markets 2- Company Profile 3- Carbon Reduction Projects of Akenerji 2
Slide 3: Kyoto Protocol vs. Paris Agreement
The Great Environmental Awakening Kyoto Protocol vs. Paris Agreement In December 2015, 196 parties to the UNFCCC adopted the Paris Agreement for an internationally coordinated Kyoto Protocol Paris Agreement effort to tackle climate change. The 1997 2005 goal is to keep global warming ‘well below’ 2°
Slide 4: Paris Climate Agreement: Turkey's INDC
Paris Climate Agreement Turkey’s INDC (Intended Nationally Determined Contribution) A landmark moment in the global effort to address the drivers of climate change. Turkey’s plans and policies to be implemented according to its INDC: • Increasing capacity of production from solar & wind power until
Slide 5: Carbon Offset Program: The Offset Cycle
Carbon Offset Program The Offset Cycle • Carbon offsets are measurable, quantifiable and trackable units of greenhouse gas (GHG) emissions reductions. • Carbon offset projects reduce or avoid emissions by carrying out certain activities, from installing Project Developer Project Idea Note End Buyer
Slide 6: Carbon Projects and Voluntary Carbon Standards
Carbon Projects Voluntary Carbon Standards • Carbon Offsets can be created by a broad array of project types: A standard is a set of project design, monitoring and reporting criteria against which carbon offsetting activities and/or projects’ environmental and social co-benefits can be certified or
Slide 7: Akenerji - Company Profile
Akenerji - Company Profile Akenerji - Company Profile 2011 Energy import and export activities 2011 started 2011 2018 AYYILDIZ WPP 28 1989 Turkey’s first Won Energy Oscar Presence in First in the Category We generate 3% of Turkey’s BULAM HEPP 7 EFET Borsa Istanbul autoproducer of ‘Best Leading in Tu
Slide 8: Ayyıldız Wind and Bulam Hydroelectric Power Plants
Ayyıldız Wind Power Plant Bulam Hydroelectric Power Plant Location Balıkesir, Turkey Location Adıyaman, Turkey Installed Capacity 28 MW Installed Capacity 7 MW Standard Type Gold Standard Standard Type Gold Standard Emission Reductions per year ~60.000 tCO2e/year Emission Reductions per year ~ 20.00
Slide 9: Uluabat and Feke II Hydroelectric Power Plants
Uluabat Hydroelectric Power Plant Feke II Hydroelectric Power Plant Location Bursa, Turkey Location Adana, Turkey Installed Capacity 100 MW Installed Capacity 70 MW Standard Type VCS Standard Type VCS Emission Reductions per year ~ 200.000 tCO2e/year Emission Reductions per year ~ 120.000 tCO2e/year
Slide 10: Feke I and Burç Hydroelectric Power Plants
Feke I Hydroelectric Power Plant Burç Hydroelectric Power Plant Location Adana, Turkey Location Adıyaman, Turkey Installed Capacity 30 MW Installed Capacity 28 MW Standard Type VCS Standard Type VCS Emission Reductions per year ~ 64,000 tCO2e/year Emission Reductions per year ~ 68.000 tCO2e/year Num
Slide 11: Gökkaya and Himmetli Hydroelectric Power Plants
Gökkaya Hydroelectric Power Plant Himmetli Hydroelectric Power Plant Location Adana, Turkey Location Adana, Turkey Installed Capacity 30 MW Installed Capacity 27 MW Standard Type VCS + (Social Carbon) Standard Type VCS + (Social Carbon) Emission Reductions per year ~ 50.000 tCO2e/year Emission Reduc
Slide 12: Offset Carbons, Preserve Nature, Protect Our Planet!
OFFSET CARBONS, PRESERVE NATURE, PROTECT OUR PLANET!
Slide 13: Akenerji Elektrik Üretim A.Ş.