    Catalyst Metals Ltd For personal use only Company Objectives  To create shareholder value by pursuing advanced gold and metals projects  Goal is to generate cashflows from operations within 2 years  Flagship Four Eagles Gold Project in Victoria provides potential for early exploration success

  3. Slide 3: Current Projects

    Current Projects For personal use only Four Eagles Gold Project (Victoria)  Joint venture exploration for a potential new Bendigo‐style goldfield below shallow cover Minnie Springs Project (Western Australia)  Molybdenum and Tungsten mineralisation in the Gascoyne Mineral Field Everton Project (Vi

  4. Slide 4: Four Eagles Gold Project

    Four Eagles Gold Project For personal use only NSW  Located along major fault 230,000mE 250,000mE 270,000mE EL5295 V I C T O R I A extension from Bendigo Four Eagles 6,000,000mN goldfield Mitiamo Prospective Target EL4525  Prospective rocks concealed Tandarr Whitel 5,980,000mN by shallow cover Gol

  5. Slide 5: Bendigo: a world-class gold target

    Bendigo: a world-class gold target For personal use only New Chum Line Bendigo Goldfield 7.3mt @14.5g/t Au Nell (3,390,000oz) Gwynne Line Lines Garden Gully Line 4.6mt @14.1g/t Au of Lode e (2,080,000oz) ction Zon BENDIGO Hustlers Line 1.6mt @17.6g/t Au o du (918,000oz) Historical Pr URBAN Total Pro

  6. Slide 6: Quartz Reef Structural Schematic

    Quartz Reef Structural Schematic For personal use only  Associated with anticlinal axis  Importance of slate beds  Difficult drilling targets

  7. Slide 7: Bendigo Target Size - Sheepshead Anticline

    Bendigo Target Size For personal use only Sheepshead Anticline (South) Line of Lode Bendigo SOUTH NORTH -500RL -1000RL PRODUCTION Approx. 1.4 million tonnes LEGEND @ 12 g/t Au (550,000 ozs) -1500RL Mineralised ribbon Historic Stoping 0 1000 Metres 123500mN 124500mN 125500mN 126500mN

  8. Slide 8: Bendigo Target Size - Deborah Anticline

    Bendigo Target Size For personal use only Deborah Anticline Line of Lode Bendigo SOUTH NORTH North Central Monument Deborah Deborah Deborah Central Hill Reef N o. 1 Deborah Fault Reef No Reef . 5 No. 6 Kingsley No. Lode No. 87 LEGEND PRODUCTION 460,000tonnes @ 14.7g/t Au “New Formation” Pitch of ree

  9. Slide 9: Bendigo Target Size - New Chum Line

    Bendigo Target Size For personal use only New Chum Line of Reef Bendigo SOUTH 0mRL PRODUCTION -500mRL 7.3 million tonnes @ 14.5 g/t Au (3.4 million ozs) -1000mRL NORTH 0mRL -500mRL LEGEND 0 500 Historic Stoping Shaft Metres -1000mRL

  10. Slide 10: Four Eagles Drillhole Intersections

    Four Eagles Gold Project For personal use only 240,000mE 250,000mE Drillhole Intersections 1. FE380 6m @ 9.71g/t Au from 120m EL5295 NORTH 14 2. FE379 3m @ 0.21g/t Au from 120m 0 4 3. FE331 6m @ 0.59g/t Au from 126m 4. FE297 6m @ 0.4g/t Au from 78m kilometres 5. FE328 6m @ 82.7g/t Au from 123m 5,995

  11. Slide 11: Four Eagles Gold Project

    Four Eagles Gold Project For personal use only  No outcrop of prospective rocks  No diamond drilling undertaken, only aircore drilling

  12. Slide 12: Four Eagles Drill Cross Section

    Four Eagles Drill Cross Section For personal use only Four Eagles Cross Section 5988925mN FE300 FE299 FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE294 0m 3m @ 1.0g/t Au 3m @ 0.51g/t Au, from 78m from 126m 3m @ 0.29g/t Au from 81m 3m @ 0.59g/t Au from 123m 6m @ 82.7g/t Au, from 123m 6m @ 1.9g/t

  13. Slide 13: Drillhole FE328, 123m to 129m

    Four Eagles Gold Project For personal use only Drillhole FE328, 123m to 129m depth 5mm

  14. Slide 14: Proposed Program 2011

    Four Eagles Gold Project For personal use only Proposed Program 2011 Minimum expenditure $450,000 Further aircore drilling over entire strike length  Phase 1: March to April 2011 ‐ 5,000m  Phase 2: September to October 2011 – 4,000m Angled diamond drilling of gold zones and structure  February

  15. Slide 15: Gold Project

    Four Eagles Gold Project For personal use only

  16. Slide 16: Gold Project

    Four Eagles Gold Project For personal use only

  17. Slide 17: Heads of Agreement

    Four Eagles Gold Project For personal use only Heads of Agreement Stage 1 $450,000 exploration spend over 12 months $150,000 cash 750,000 CYL shares Stage 2 $2,100,000 exploration spend (inclusive of Phase 1 exploration) over 3 years to earn 50% interest in project $100,000 cash 750,000 CYL sh

  18. Slide 18: Minnie Springs Project, W.A.

    Minnie Springs Project, W.A. For personal use only 380,000mE 400,000mE 420,000mE Catalyst Metals Tungsten in Rock (%W) Gascoyne Mo-W >0.5% 0.05 - 0.5% Project 7,336,200mE <0.05% 0 200 7,340,000mN Metres 7,335,800mE E0901776 E0901174 389,400mE 389,800mE Nina Tungsten Project 7,320,000mN 4 23m @ 0.16%

  19. Slide 19: Everton Project, Victoria

    Everton Project, Victoria For personal use only 0 mN 9,570,00 462,100 462,200 462,300 Visible Molybdenum mE mE mE Rock sample points Beechworth 5,000 to 18,400 Wangaratta 1,000 to 5,000 qua 500 to 1,000 rry lim it 0 to 500 EL4866 Mine adit Historic workings Everton Felsic Intrusive Sediments Canberr

  20. Slide 20: Catalyst Capital Structure

    Catalyst Capital Structure For personal use only Capital Structure (ASX:CYL)  35,838,226 fully paid ordinary shares – 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015  Top 40 control approximately 81% of issued capital Cash in hand  A

  21. Slide 21: Corporate Structure - Directors

    Corporate Structure - Directors For personal use only Stephen Boston – Non‐executive Chairman The principal of a Perth‐based Private Investment Bank specialising in the Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998 in Perth and Sydney. Bruce Kay – Non‐executive Di

  22. Slide 22: Corporate Structure - Advisors

    Corporate Structure For personal use only Advisors John Arbuckle – Corporate Advisor John is an accountant with extensive experience in the resources industry in Australia and overseas. Currently he operates a corporate advisory business that provides corporate and capital financing advice to resour

  23. Slide 23: Disclaimer and Forward Looking Statements

    Disclaimer and Forward Looking Statements For personal use only  This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purpo

Catalyst Metals — Investor Presentation (February 2011) on 6ix