Slide 2: Company Objectives
Catalyst Metals Ltd For personal use only Company Objectives To create shareholder value by pursuing advanced gold and metals projects Goal is to generate cashflows from operations within 2 years Flagship Four Eagles Gold Project in Victoria provides potential for early exploration success
Slide 3: Current Projects
Current Projects For personal use only Four Eagles Gold Project (Victoria) Joint venture exploration for a potential new Bendigo‐style goldfield below shallow cover Minnie Springs Project (Western Australia) Molybdenum and Tungsten mineralisation in the Gascoyne Mineral Field Everton Project (Vi
Slide 4: Four Eagles Gold Project
Four Eagles Gold Project For personal use only NSW Located along major fault 230,000mE 250,000mE 270,000mE EL5295 V I C T O R I A extension from Bendigo Four Eagles 6,000,000mN goldfield Mitiamo Prospective Target EL4525 Prospective rocks concealed Tandarr Whitel 5,980,000mN by shallow cover Gol
Slide 5: Bendigo: a world-class gold target
Bendigo: a world-class gold target For personal use only New Chum Line Bendigo Goldfield 7.3mt @14.5g/t Au Nell (3,390,000oz) Gwynne Line Lines Garden Gully Line 4.6mt @14.1g/t Au of Lode e (2,080,000oz) ction Zon BENDIGO Hustlers Line 1.6mt @17.6g/t Au o du (918,000oz) Historical Pr URBAN Total Pro
Slide 6: Quartz Reef Structural Schematic
Quartz Reef Structural Schematic For personal use only Associated with anticlinal axis Importance of slate beds Difficult drilling targets
Slide 7: Bendigo Target Size - Sheepshead Anticline
Bendigo Target Size For personal use only Sheepshead Anticline (South) Line of Lode Bendigo SOUTH NORTH -500RL -1000RL PRODUCTION Approx. 1.4 million tonnes LEGEND @ 12 g/t Au (550,000 ozs) -1500RL Mineralised ribbon Historic Stoping 0 1000 Metres 123500mN 124500mN 125500mN 126500mN
Slide 8: Bendigo Target Size - Deborah Anticline
Bendigo Target Size For personal use only Deborah Anticline Line of Lode Bendigo SOUTH NORTH North Central Monument Deborah Deborah Deborah Central Hill Reef N o. 1 Deborah Fault Reef No Reef . 5 No. 6 Kingsley No. Lode No. 87 LEGEND PRODUCTION 460,000tonnes @ 14.7g/t Au “New Formation” Pitch of ree
Slide 9: Bendigo Target Size - New Chum Line
Bendigo Target Size For personal use only New Chum Line of Reef Bendigo SOUTH 0mRL PRODUCTION -500mRL 7.3 million tonnes @ 14.5 g/t Au (3.4 million ozs) -1000mRL NORTH 0mRL -500mRL LEGEND 0 500 Historic Stoping Shaft Metres -1000mRL
Slide 10: Four Eagles Drillhole Intersections
Four Eagles Gold Project For personal use only 240,000mE 250,000mE Drillhole Intersections 1. FE380 6m @ 9.71g/t Au from 120m EL5295 NORTH 14 2. FE379 3m @ 0.21g/t Au from 120m 0 4 3. FE331 6m @ 0.59g/t Au from 126m 4. FE297 6m @ 0.4g/t Au from 78m kilometres 5. FE328 6m @ 82.7g/t Au from 123m 5,995
Slide 11: Four Eagles Gold Project
Four Eagles Gold Project For personal use only No outcrop of prospective rocks No diamond drilling undertaken, only aircore drilling
Slide 12: Four Eagles Drill Cross Section
Four Eagles Drill Cross Section For personal use only Four Eagles Cross Section 5988925mN FE300 FE299 FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE294 0m 3m @ 1.0g/t Au 3m @ 0.51g/t Au, from 78m from 126m 3m @ 0.29g/t Au from 81m 3m @ 0.59g/t Au from 123m 6m @ 82.7g/t Au, from 123m 6m @ 1.9g/t
Slide 13: Drillhole FE328, 123m to 129m
Four Eagles Gold Project For personal use only Drillhole FE328, 123m to 129m depth 5mm
Slide 14: Proposed Program 2011
Four Eagles Gold Project For personal use only Proposed Program 2011 Minimum expenditure $450,000 Further aircore drilling over entire strike length Phase 1: March to April 2011 ‐ 5,000m Phase 2: September to October 2011 – 4,000m Angled diamond drilling of gold zones and structure February
Slide 15: Gold Project
Four Eagles Gold Project For personal use only
Slide 16: Gold Project
Four Eagles Gold Project For personal use only
Slide 17: Heads of Agreement
Four Eagles Gold Project For personal use only Heads of Agreement Stage 1 $450,000 exploration spend over 12 months $150,000 cash 750,000 CYL shares Stage 2 $2,100,000 exploration spend (inclusive of Phase 1 exploration) over 3 years to earn 50% interest in project $100,000 cash 750,000 CYL sh
Slide 18: Minnie Springs Project, W.A.
Minnie Springs Project, W.A. For personal use only 380,000mE 400,000mE 420,000mE Catalyst Metals Tungsten in Rock (%W) Gascoyne Mo-W >0.5% 0.05 - 0.5% Project 7,336,200mE <0.05% 0 200 7,340,000mN Metres 7,335,800mE E0901776 E0901174 389,400mE 389,800mE Nina Tungsten Project 7,320,000mN 4 23m @ 0.16%
Slide 19: Everton Project, Victoria
Everton Project, Victoria For personal use only 0 mN 9,570,00 462,100 462,200 462,300 Visible Molybdenum mE mE mE Rock sample points Beechworth 5,000 to 18,400 Wangaratta 1,000 to 5,000 qua 500 to 1,000 rry lim it 0 to 500 EL4866 Mine adit Historic workings Everton Felsic Intrusive Sediments Canberr
Slide 20: Catalyst Capital Structure
Catalyst Capital Structure For personal use only Capital Structure (ASX:CYL) 35,838,226 fully paid ordinary shares – 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015 Top 40 control approximately 81% of issued capital Cash in hand A
Slide 21: Corporate Structure - Directors
Corporate Structure - Directors For personal use only Stephen Boston – Non‐executive Chairman The principal of a Perth‐based Private Investment Bank specialising in the Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998 in Perth and Sydney. Bruce Kay – Non‐executive Di
Slide 22: Corporate Structure - Advisors
Corporate Structure For personal use only Advisors John Arbuckle – Corporate Advisor John is an accountant with extensive experience in the resources industry in Australia and overseas. Currently he operates a corporate advisory business that provides corporate and capital financing advice to resour
Slide 23: Disclaimer and Forward Looking Statements
Disclaimer and Forward Looking Statements For personal use only This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purpo