  1. Slide 1: Adani Electricity Mumbai Limited Operational Excellence Showcase

    Adani Electricity Mumbai Limited Operational Excellence Showcase March 2021

  2. Slide 2: Contents

    Contents 01 Adani Group Overview 4-7 02 AEML – Integrated Utility 9-11 03 AEML’s Operating Philosophy 13-30 04 Conclusion 32

  3. Slide 3: 01. Adani Group Overview

    adani 01. Adani Group Overview

  4. Slide 4: Adani Group: A world class infrastructure & utility portfolio

    Adani Group: A world class infrastructure & utility portfolio Energy & Utility Adani Transport & Logistics Portfolio Portfolio • Marked shift from B2B to B2C businesses– 63.5% 100% 75% 55% • ATGL – Gas distribution network to serve key APSEZ SRCPL ATL AGEL geographies across India Port & Logistics R

  5. Slide 5: Adani Group: Decades long track record of industry best growth rates across sectors

    Adani Group: Decades long track record of industry best growth rates across sectors Port Cargo Throughput (MT) Renewable Capacity (GW) Transmission Network (ckm) CGD7 (GAs8 covered) 161% 45% 12% 21% 2.5x 1.5x 6x 3x 30% 5% 7% 25% Industry Adani APSEZ Industry AGELAdani Industry ATL Industry AGL 2014

  6. Slide 6: Adani Group: Repeatable, robust & proven transformative model of investment

    Adani Group: Repeatable, robust & proven transformative model of investment Phase Development Operations Post Operations Origination Site Development Construction Operation Capital Mgmt Activity • Engineering & design • Life cycle O&M planning • Redesigning the • Analysis & market • Site acquisition

  7. Slide 7: AEML: Implementing Groups transformative simple, repeatable business model

    AEML: Implementing Groups transformative simple, repeatable business model Phase Development Operations Post Operations Construction Reliability Operation Consumer Capital Mgmt • Preferred Supplier for • Self help kiosk • Redesigned Capital structure • Commissioned Versova • Islanding scheme consume

  8. Slide 8: 02. AEML – Integrated Utility

    02. AEML – Integrated Utility

  9. Slide 9: Adani Transmission: India's leading Transmission & Distribution portfolio

    Adani Transmission: India's leading Transmission & Distribution portfolio Contracted Assets ROA Assets 74.9% 25.1% 100%1 100% 100% Transmission HVDC AEML TBCB(2) Assets Transmission Assets line AEML catering to Partnered with 13 Operating HVDC Line in 12 mn+ Consumers marquee investor QIA 4 Operatin

  10. Slide 10: AEML: Stable and evolved regulatory framework offers predictable & robust returns

    AEML: Stable and evolved regulatory framework offers predictable & robust returns Tariff is based on rate of return approach on regulated asset base, pass-through of other costs and efficiency linked incentives MERC - Regulator of State of Maharashtra Assured return on regulated asset base Costs Pow

  11. Slide 11: AEML: Century old utility serving the Gateway city of India, faces unique challenges

    AEML: Century old utility serving the “Gateway” city of India, faces unique challenges BHAYANDER CREEK Key Statistics of Mumbai Key Challenges of Mumbai THANE MIRA BHAYANDER Area Population  Houses the worlds largest slum BORIVALI 603 SqKm 25 Million  Highest population density MALAD Population De

  12. Slide 12: 03. AEML Operating Philosophy – Reliability, Responsiveness and Sustainability

    03. AEML Operating Philosophy – Reliability, Responsiveness and Sustainability

  13. Slide 13: AEML responds to these Challenges with an O&M philosophy: Reliability, Responsiveness & Sustainability

    AEML responds to these Challenges with an O&M philosophy structured around the triad of Reliability, Responsiveness & Sustainability Reliability Responsiveness – Pioneered adoption of advanced – Consumer-centric service delivery technologies & state of the art model with wide spectrum of integrated

  14. Slide 14: AEML's Robust and Reliable Infrastructure integrated through the Digital twin

    AEML’s Robust and Reliable Infrastructure Reliability Responsiveness Sustainability integrated through the “Digital twin“ 1 Transmission Distribution Retail Network Design (33/11 kV) Smart Meter (220/33 kV) (11/0.4 kV) 2 Digital Enabler SCADA DMS AMI 3 Integrators G I S W M S O M S C R M SAP Feature

  15. Slide 15: AEML: Redundancy in Network design ensure minimal downtime

    AEML: Redundancy in Network design ensure Reliability Responsiveness Sustainability minimal downtime 1 Network Design Auto-restoration of 33 kV feeders - First in India Redundancy at source level  Grid Islanding Mechanism  Redundancy at all Voltage Level–Ring Network  33kV feeder from two EHV sub

  16. Slide 16: AEML: Orbital Shift - Solution for Distribution Loss reduction

    AEML: Orbital Shift - Solution for Distribution Reliability Responsiveness Sustainability Loss reduction 1 Network Design Existing Network Configuration Distribution Loss 9.53% 9.24% 8.83% 440 V LT Board Load 8.12% 440 V 440 V 7.80% 220 Service wiring wires 11 KV/33 KV / KV 400& 33VKV/11KV LT U/G LT

  17. Slide 17: AEML: Smart Metering Ecosystem

    Reliability Responsiveness Sustainability AEML: Smart Metering Ecosystem 1 Network Design Intelligence • Consumer Portal Software Analysis Business • Streetlight Portal Data • Business process support • Data analytics • Business Dashboard Connectivity • Head End System Mgmt • Meter Data management D

  18. Slide 18: AEML: Smart Meter benefits

    Reliability Responsiveness Sustainability AEML: Smart Meter benefits 1 Network Design Consumers Network Business Real Time information 1 Demand response 1 Ease of Operation 1 & Online Services techniques 2 Dynamic Pricing 2 Optimization of Reduction in Perceptive 2 Losses Complaints 3 Delivery of en

  19. Slide 19: AEML: Digital Enablers - SCADA, DMS, AMI

    Reliability Responsiveness Sustainability AEML: Digital Enablers - SCADA, DMS, AMI 2 Digital Enabler Integrated SCADA & DMS system for Transmission & Distribution – Quick isolation & Power Restoration India’s 1st SCADA system certified under ISO 27001 – Cyber Security Real-time events & alarms, load

  20. Slide 20: AEML: OMS Integration

    Reliability Responsiveness Sustainability AEML: OMS Integration 3 Integrators Integrated system facilitates fossil fuel conservation SCADA / DMS OMS • Identification of asset and reduces carbon footprint under breakdown through GIS • Outage intelligence • Work assignment to field crew, job creation

  21. Slide 21: AEML: Improvement in response time

    Reliability Responsiveness Sustainability Pre-OMS AEML: Improvement in response time 3 Integrators “No supply” complaint 1 No Electricity 2 Minutes 1 4% complaint 2 Assign the complaint 5 Minutes to field crew 8% Complaint registration Customer Call Centre Field crew reaches 16 Minutes 3 at complain

  22. Slide 22: AEML: Operates at Industry standards beating reliability metrics

    AEML: Operates at Industry standards beating Reliability Responsiveness Sustainability reliability metrics Reliability Indices Achievements Challenges SAIFI SAIDI CAIDI 70.00 • Unplanned Outages • Highest supply availability among peers and high 56.10 reliability scores 50.13 39.15 • Grid Disruption

  23. Slide 23: AEML: Case Studies – Reliability Demonstrated

    Reliability Responsiveness Sustainability AEML: Case Studies – Reliability Demonstrated COVID Solidarity Event - 9 pm 9 minutes Grid Disturbance - 12 Oct’20 Grid Failure & 1 2 on 5th April 2020 successful Islanding Challenges Sequence of Events - Maintaining grid’s stability within frequency - Trigg

  24. Slide 24: AEML: Case Studies – Reliability Demonstrated Demand Side Management

    Reliability Responsiveness Sustainability AEML: Case Studies – Reliability Demonstrated 3 Demand Side Management MUMBAI MAHARASHTRA • Peak – Off Peak Ratio ~ 3.5:1 • Lower demand on Sundays & Holidays • Peak – Off Peak Ratio ~ 2:1 • Predictable demand pattern Challenges Mitigation • Demand varies ba

  25. Slide 25: AEML: Responsiveness aided by Technology - Transformation to Virtual Enterprise

    AEML: Responsiveness aided by Technology- Reliability Responsiveness Sustainability Transformation to Virtual Enterprise 100% adoption of mobile app for Meter Reading, INC & Recovery Mobile App • Improved productivity and manual error reduction Mobile • Real time update and tracking/monitoring App A

  26. Slide 26: AEML: Quality manpower for high reliability and responsiveness

    AEML: Quality manpower for high reliability and Reliability Responsiveness Sustainability responsiveness Knowledge Enhancement Enhance Digital Skills for Future ready Organization • 60 Customized webinars in collaboration with 41 • WEBEX Course on Digital Transformation Reputed Vendors • E-Learning

  27. Slide 27: AEML: Case Studies - Responsiveness to consumer in extreme events

    AEML: Case Studies - Responsiveness to consumer Reliability Responsiveness Sustainability in extreme events 1 COVID-19 4 2 Mumbai Monsoon To maintain quality of supply Safety of Mumbai consumer • 24x7 • Zero fatality • Uninterrupted • Supply to critical establishments Challenges • No power outage •

  28. Slide 28: AEML: Strong ESG Focus

    Reliability Responsiveness Sustainability AEML: Strong ESG Focus Environmental E  The commitment to raise the share of renewable power procurement from the current  Use of environment friendly dry and ester oil transformers  Replaced oil type switch gears with dry type maintenance free switch gea

  29. Slide 29: AEML: Employees have proven capabilities for execution

    Reliability Responsiveness Sustainability AEML: Employees have proven capabilities for execution Well trained manpower with extensive experience in different aspects of execution ~ 5,000 Trained Manpower ~ 100,000 Total Man years of experience Excellent track-record of having implemented various sch

  30. Slide 30: AEML: ISO Journey - Continued Improvement

    Reliability Responsiveness Sustainability AEML: ISO Journey - Contined Improvement Information and Quality Environment Occupation Health & Safety communication technology Social Mgmt. System Mgmt. System Mgmt. System (ICT) readiness for business Accountability (1998) (2014) (2018) continuity (2021)

  31. Slide 31: 4. Conclusion

    4. Conclusion

  32. Slide 32: AEML: Value accreditation to ATL and pathway towards future growth in distribution sector

    AEML: Value accreditation to ATL and pathway towards future growth in distribution sector Pre-acquisition of AEML Post-acquisition of AEML - Cashflow profile of ATL (In Rs. Crs) 4,519 has changed dramatically post acquisition of AEML 2,937 3,113 2,770 1,997 2,005 - Self-funded growth 944 994 396 547

  33. Slide 33: Thank you

    adani Eietriy Thank you

  34. Slide 34: Legal Disclaimer

    Legal Disclaimer The information contained in this presentation is provided by Adani Transmission Limited (together with its subsidiaries, the “Company” or “ATL”) to you solely for your reference and for information purposes only. This presentation is highly confidential and is being given solely fo

Adani Energy Solutions — Investor Presentation (March 2021) on 6ix