Sunstone Metals Ltd · ASX:STM

Sunstone Metals — Avalon Minerals — Investor Presentation (September 2014)

32 slides from Sunstone Metals's investor presentation, Sep 3, 2014

  1. Slide 1: Avalon Minerals Limited Corporate Presentation

    3 SEPTEMBER 2014 AVALON MINERALS LIMITED CORPORATE PRESENTATION Attached is a Corporate Presentation, September 2014 for Avalon Minerals Limited (ASX:AVI). The presentation is available on the Company’s website: www.avalonminerals.com.au The Scoping Study, as announced to the ASX on 28 August 2014,

  2. Slide 2: Avalon Minerals Ltd – Corporate Presentation September 2014

    AVALON MINERALS LTD A pre-production copper–magnetite opportunity with growth upside Corporate Presentation September 2014

  3. Slide 3: Disclaimer

    Avalon Minerals – Disclaimer Forward-looking Statements This Presentation includes certain statements that may be deemed “forward-looking statements”. All statements in this Presentation, other than statements of historical facts, that address future activities and events or developments that Avalon

  4. Slide 4: At a Glance

    Avalon Minerals – At a Glance • ASX quoted resource company with a focus on the Ticker ASX:AVI 100% owned Viscaria copper-magnetite project in Sweden Share Price $0.009 • Viscaria has a completed Scoping Study, underpinned Shares on Issue 1,437,354,886 by a robust resource estimate Market Cap $12,93

  5. Slide 5: Shareholder Support

    Avalon Minerals – Shareholder Support • Strong shareholder support • Top 5 shareholders hold 50% of shares on issue • Top 3 shareholders have taken strategic stakes of >8% • Introduction of new shareholders with the recent placement to raise A$1.95 million NAME HOLDING % Tan Sri Abu Sahid Bin Mohame

  6. Slide 6: Corporate Re-positioning

    Avalon Minerals – Corporate Re-positioning  New Board and management Chairman Appointed November 2013. Mr. Ascough is a senior resources executive with more than 23 years of industry experience evaluating mineral Graham Ascough projects and resources in Australia and overseas. He is currently non-e

  7. Slide 7: Viscaria Project – At a Glance

    Viscaria Project – At a Glance  Is ROBUST:  Viscaria copper-magnetite project is a robust development scenario based on a 2014 updated Scoping Study  PFS activities have commenced and the PFS is due for completion in Q3, 2015  Metallurgy delivers premium quality products of Cu con (~26%) and Fe

  8. Slide 8: Viscaria Project Location

    Viscaria Project – Location Viscaria Cu-Fe Project Fe Mine and processing Cu Smelter Cu Refinery Cu Mine 7

  9. Slide 9: Infrastructure

    Avalon Minerals – Infrastructure  Town (Kiruna, pop. 20,000; skilled workforce)  Road Access  Rail (Public Access)  Power (Low Cost; ~8c/kWh)  Contractors  >100 year mining heritage 8

  10. Slide 10: Resource Summary

    Viscaria Project – Resource Summary OVERALL RESOURCE Cu Fe Copper Resource Iron Resource 4 Deposits 37% Measured 6% Measured 63.86Mt @ 35.3Mt @ 23% Indicated 39% Indicated Cu + Fe (magnetite) 1.05% 29.8% 40% Inferred 58% Inferred 680,000 t, or 1.5 Billion lbs Copper 9.1 Million t Recoverable iron SC

  11. Slide 11: Scoping Study Cautionary Statement

    Viscaria Project – Scoping Study Cautionary Statement The Scoping Study referred to in this presentation is based on lower-level technical and economic assessments and is insufficient to support estimation of Ore Reserves, or to provide assurance of an economic development case at this stage, or to

  12. Slide 12: August 2014 Scoping Study

    Viscaria Project – August 2014 Scoping Study US$199 M 3.5Mtpa CAPEX plant (start up) >10 year 69% Fe mine life magnetite con Open pit only 1Mtpa PRODUCTION TARGET Infrastructure magnetite con 33.6Mt @ 0.63% Cu, in place 22% Fe Underground ~25% Cu con upside 18,000tpa Cu Belt scale in con exploration

  13. Slide 13: August 2014 Scoping Study

    Viscaria Project – August 2014 Scoping Study US$248 mill US$0.44 – US$1.36 Potential pre-tax NPV at US$3.00/lb Cu and Forecast C1 cash cost net of magnetite credits for US$100/t 69% Fe magnetite concentrate price open pit mining scenario; assumes $120 - $80/t magnetite concentrate price US$199 mill

  14. Slide 14: Scoping Study Sensitivity

    Viscaria Project – August 2014 Scoping Study - Sensitivity NPV Sensitivity to assumed Magnetite Price (US $/t concentrate) commodity prices Cu Price (US $/lb) 80 100 120 (NPV10%REAL, Pre Tax) 2.75 $98 $200 $301 3 $147 $248 $349 3.25 $195 $297 $398 3.5 $244 $345 $447 Capex Disount Rate Fe Recovery %

  15. Slide 15: D Zone long section

    Viscaria Project – D Zone long section 14

  16. Slide 16: A Zone long section

    Viscaria Project – A Zone long section Previously mined by Outokumpu – 15 years of production to 1997 – 12.5Mt of 2.3% Cu at 850,000tpa, producing a concentrate of 26% Cu, 2% Zn & 0.5g/t Au (43Mlb (19.5k t) pa Cu metal in concentrate) Pre-mined endowment of A Zone only is estimated to have been ~40-

  17. Slide 17: Metallurgy

    Viscaria Project – Metallurgy • High quality products • Independent review completed • D Zone copper sulphide mineralisation produces a concentrate with 26% copper and 94% copper recovery; • High quality, magnetite concentrate with 70% Iron produced with low impurity levels from D Zone; • A Zone and

  18. Slide 18: Metallurgy

    Viscaria Project – Metallurgy 17

  19. Slide 19: Growth Options

    Viscaria Project – Growth Options  Assessment of value of gold content at Discovery Zone – 55,000 ounces in mineral resource*  Oxide copper potential – initial metallurgical testing indicates the oxide material is amenable to acid leaching, further testing planned, oxide resource at D Zone is open

  20. Slide 20: Down plunge potential

    Viscaria Project – Down plunge potential No drilling exists below these intercepts – No drilling exists below these intercepts – clear potential for resource growth clear potential for resource growth No drilling exists below these Underground Potential intercepts – clear potential for  Contemplate

  21. Slide 21: Belt Scale Exploration Upside

    Viscaria Project – Belt Scale Exploration Upside Kurravaara Kurravaara  Historic workings exploited vein/disseminated copper-gold mineralization concentrated in a regional scale fold hinge  Rock chips from this area contained up to 1g/t Au and 0.9% Cu West Nukutus  Excellent magnetic anomaly of s

  22. Slide 22: Peer Group Comparison

    Viscaria Project – Peer Group Comparison  LOW Capital Intensity, forecast at 9,000 $/t Viscaria  LOW Cost/lb copper production, <$1.36/lb, low forecast net of magnetite credits × LOW Valuation - EV/Resource lb of Copper, very low at <1c/lb Share Price EV/lb Cu in Capital Company Code (A$) shares o

  23. Slide 23: Stakeholder Management

    Viscaria Project – Stakeholder Management • Proposed development areas are in windows surrounded by multiple land use areas • The key issues are (1) a strong mining heritage, (2) reindeer herding, (3) Natura 2000, and (4) recreation 22

  24. Slide 24: Planning to Deliver

    Avalon Minerals – Planning to Deliver 2014 2015 2016 2017 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Stakeholder Engagement Stakeholder plans, forums, reviews Studies & Exploration Drilling; PFS and Exploration Studies; Engineering, Environmental, Logistics Pre-Feasibility Study PFS Feasibility St

  25. Slide 25: Value Growth Drivers

    Avalon Minerals – Value Growth Drivers CURRENT NEAR TERM (within 12 months) LONGER TERM (>12 months) Improve capital structure and funding De-risk project through PFS implementation Secure EA and mining permit position approval Advance selected PFS studies (logistics, Complete PFS drilling program S

  26. Slide 26: Resource Estimate Summary – Copper

    Avalon Minerals – Resource Estimate Summary Currently Defined Mineral Resource for Copper reported on the Viscaria Project above a 0.4% Cu cut-off. Resource Name Classification Tonnes (t) Cu Grade (%) Cu Metal (t) Measured 14,439,000 1.7 240,000 Indicated 4,690,000 1.2 57,200 A Zone Inferred 2,480,0

  27. Slide 27: Resource Estimate Summary – Iron

    Avalon Minerals – Resource Estimate Summary Currently Defined Mineral Resource for Iron reported on the Viscaria Project above a 15% Mass Recovery cut-off Resource Name Classification Tonnes (Million Fe Grade (%) Mass Recovery Estimated recoverable Tonnes) (%) iron (Million Tonnes) Measured 2.0 28.7

  28. Slide 28: Resource Estimate Summary - Notes

    Avalon Minerals – Resource Estimate Summary - Notes • The A, B D and Discovery Zone Mineral Resources were prepared and first disclosed under the JORC Code 2004. They have been updated since to comply with the JORC Code (2012). • All Copper Mineral Resource estimates are reported above a block cut-o

  29. Slide 29: Competent Persons Statement

    Competent Persons Statement Competent Persons Statement The information in this report that relates to mining project evaluations is based upon information compiled by, or under the supervision of Manish Garg B.Eng. (Hons.), Master of Applied Finance, MAusIMM, MAICD; Tim Horsley B.Sc. (Hons) (Mining

  30. Slide 30: Relevant ASX Announcements

    Avalon Minerals – Relevant ASX Announcements Date ASX announcement 26th June 2013 D Zone Drill Program Doubles Mineral Resource to 30Mt 9th July 2013 Project NPV now US$373M 9th April 2014 Significant Upgrade to Discovery Zone Mineral Resource 22nd May 2014 Confidence Upgrade to D Zone Mineral Resou

  31. Slide 31: 3D Representation of the A, B, D and Discovery Zones

    Avalon Minerals – 3D Representation of the A Zone, B Old plant Old tailings Zone, D Zone and Discovery Zone site facility Optimised Pit Shell 30

  32. Slide 32: Avalon Minerals –

    Avalon Minerals — AVALON 31

Avalon Minerals — Investor Presentation (September 2014) on 6ix