Boral Ltd.

Boral — Corporate Update (December 2019)

28 slides from Boral's corporate update, December 2019

  1. Slide 1: Peppertree Quarry Community Consultative Committee December 2019

    PEPPERTREE QUARRY COMMUNITY CONSULTATIVE COMMITTEE December 2019

  2. Slide 2: Agenda item 4 – Correspondence

    Agenda item 4 – Correspondence (Sept, Oct, Nov 2019) - Department of Planning and Environment - Waste management plan issued to the department and revised based on departments comments - Request for extension for submission of management plans due on the 1 st January 2020 - Rehabilitation Bond - Mod

  3. Slide 3: Agenda item 5 – Operations

    Agenda item 5 – Operations past 3 months ▪ Safety & Environment - Zero LTI’s since the last meeting - Significant works on dust mitigation measures - Further personal dust monitoring conducted - Additional traffic and pedestrian management works - Water resources are becoming a major concern ▪ Peopl

  4. Slide 4: Agenda item 5 – Operations: Dust Catcher installation and operation

    Agenda item 5 – Operations ▪ Modification 6 – Dust Catcher installation and operation ▪ Modification 6 for the replacement of our existing air filtration systems with two 'baghouse' filters and associated ducting. ▪ The proposed baghouse will be located within the existing processing area and will n

  5. Slide 5: Agenda Item 6 - Environmental Performance Incidents

    Agenda Item 6 - Environmental Performance Incidents Sept 2019 (3 leaks, 1 sediment) Oct 2019 ( 1 weed mgt, 2 leaks, 1 bags of rubbish) Nov 2019 (3 leaks) 5

  6. Slide 6: Agenda item 6 – Environmental Performance Complaints

    Agenda item 6 – Environmental Performance Complaints Sept 2019 (1 - dust from train ) Oct 2019 (nil) Nov 2019 (nil) 6

  7. Slide 7: Agenda item 6 – Environmental Performance Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month In compliance Annual average below goal at the boundary 7

  8. Slide 8: Agenda item 6 – Environmental Performance Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month In compliance 8

  9. Slide 9: Agenda item 6 – Environmental Performance Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month . In compliance 9

  10. Slide 10: Agenda item 6 – Environmental Performance Air

    Agenda item 6 – Environmental Performance Air . 10

  11. Slide 11: Air – Particulate Matter <10 microns – annual average

    Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – annual average In compliance with the annual average goal 11

  12. Slide 12: Air – Particulate Matter <10 microns – 24 hour criteria

    Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – 24 hour criteria All in compliance since last meeting (September 2019) Note criteria is at the nearest residence and not the HVAS. 12

  13. Slide 13: Air - Total Suspended Particulates

    Agenda item 6 – Environmental Performance Air - Total Suspended Particulates TSP below Annual average goal 13

  14. Slide 14: Noise - quarterly noise monitoring

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring November 2019 Last monitoring was conducted in November 2019. Results yet to be received however advice is that all is in compliance All in compliance 14

  15. Slide 15: Blast monitoring

    Agenda item 6 – Environmental Performance Blast monitoring All in compliance 15

  16. Slide 16: Blast monitoring

    Agenda item 6 – Environmental Performance Blast monitoring All in compliance 16

  17. Slide 17: Surface water

    Agenda item 6 – Environmental Performance Surface water Quarterly monitoring round undertaken in September and December 2019. December results are still pending. Next sample round March 2020 Total Nitrogen for T1 is below the trigger. Levels in the dam and Marulan south creek rising due to lack of f

  18. Slide 18: Surface water

    Agenda item 6 – Environmental Performance Surface water Total dissolved solids trending up due to lack of rain Turbidity below trigger 18

  19. Slide 19: Surface water

    Agenda item 6 – Environmental Performance Surface water pH within trigger levels with the exception of the main dam. Likely to be due to decreased water availability Total phosphorus - T1 and the Dam are below the trigger level. 19

  20. Slide 20: Ground water

    Agenda item 6 – Environmental Performance Ground water ▪ Monitoring conducted in November 2019 ▪ Report is pending 20

  21. Slide 21: Environmental flow

    Agenda item 6 – Environmental Performance Environmental flow 21

  22. Slide 22: Heritage

    Agenda item 6 – Environmental Performance Heritage ▪ Regular AHMC meeting established - Pending works - SWOE salvage - Topsoil salvage - Scar tree fencing - Meridian park cultural heritage - Collation of artifacts and return to country - Participation in NAIDOC week in Goulburn 22

  23. Slide 23: Ecology

    Agenda item 6 – Environmental Performance Ecology ▪ No new hydro mulching or planting works undertaken and on hold till rain ▪ Limited maintenance still being carried out ▪ Annual Rapid Visual assessment undertaken in November 2019. - Undertaken by Independent consultant who reviews site each year a

  24. Slide 24: Stakeholder Engagement

    Agenda item 6 – Stakeholder Engagement ▪ Kite festival September 2019 ▪ CVA program associated with Koala survey in Bungonia national park not undertaken due to unavailability of staff. Program being reviewed for early 2020 ▪ Sponsor of Goulburn Mulwaree Charity Golf day ▪ Sponsor of Goulburn Mulwar

  25. Slide 25: Agenda item 7 – Plans for the next three months

    Agenda item 7 – Plans for the next three months ▪ Safety & Environment - Review of dust monitoring data with additional control measures - Sourcing of additional water - Completion of traffic and pedestrian management works ▪ People - New quarry manager ▪ Overburden - Preparation of management plans

  26. Slide 26: Agenda item 8 – General Business

    Agenda item 8 – General Business ▪ Marulan South Limestone update ▪ IPC Hearing to be arranged assume first quarter of 2020 ▪ Peppertree Quarry Modification 5 - Conditions of Consent received October 2019 26

  27. Slide 27: Agenda item 8 – General Business: next meeting dates

    Agenda item 8 – General Business ▪ Next meeting dates – - March 2020 27

  28. Slide 28: Slide 28