  1. Slide 1: YTC Resources: Fully Funded High-Grade Development and Exploration Upside

    YTC RESOURCES LTD ASX: YTC FULLY FUNDED HIGH-GRADE DEVELOPMENT 1 AND EXPLORATION UPSIDE

  2. Slide 2: Disclaimer

    DISCLAIMER • This presentation has been prepared by YTC Resources Limited (“YTC” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No

  3. Slide 3: Hera and Nymagee Projects

    HERA AND NYMAGEE PROJECTS FULLY FUNDED HIGH-GRADE Au-Pb-Zn-Ag-Cu DEVELOPMENT WITH MAJOR EXPLORATION UPSIDE STAGE 1: HERA DEPOSIT (YTC-100%) – DEVELOPMENT UNDERWAY • Near-term, high-grade gold-lead-zinc-silver development • Average annual production exceeds 50kozpa Au Eq. over initial mine life of 7.

  4. Slide 4: Project Location

    PROJECT LOCATION COBAR BASIN: LONG LIFE, HIGH-GRADE MINES Endeavour Zn-Pb-Ag (Toho) CSA Copper Mine (Glencore) +1.5Mt Cu endowment NYNGAN COBAR Australia Peak Mine (NewGold) +7Moz Au Eq endowment NSW COBAR BASIN Nymagee Copper Deposit YTC Wonawinta (CCU) 52Moz Ag Hera Au-Pb-Zn-Ag Deposit YTC Mallee

  5. Slide 5: Cobar Basin Deposits

    COBAR BASIN DEPOSITS LONG LIFE, INCREASING SCALE AND GRADE WITH DEPTH COBAR DISTRICT – LONG SECTION Long Section: Cobar Gold Field +7Moz Au Eq production CSA +1.5Mt Cu Chesney Eastern Western Perseverance The Peak New Occidental New Cobar Great Cobar System System 500m 10km 1000m 1500m QTS QTS South

  6. Slide 6: Corporate Snapshot

    CORPORATE SNAPSHOT CORPORATE SUMMARY – GLENCORE PROJECT FINANCING 6

  7. Slide 7: Hera Development Underway

    HERA DEVELOPMENT UNDERWAY Hera construction remains on budget on a total project basis. Heavy Vehicle Access Road Construction Concrete Batch Plant 7 Hera Underground Hera Underground

  8. Slide 8: Hera Gold-Lead-Zinc Deposit

    HERA GOLD-LEAD-ZINC DEPOSIT DEVELOPMENT AND DEPOSIT EXTENSIONS DECLINE POSITION 31 JULY 1ST VENT DEVELOPMENT COMPLETE 200m ASL Selected Drill Holes outside the Hera HRD042W1 Resource North 11m @ 107g/t Ag, 20% Pb+Zn No Significant Results Strong Mineralisation 100m >40m% Pb+Zn HRD042W2 Selected Dril

  9. Slide 9: Hera Development Key Metrics

    HERA DEVELOPMENT KEY METRICS – STAGE 1 HERA DEVELOPMENT Resource 677,200 ounces Au Eq. at 8.6 g/t Au Eq.* Reserve 423,471 ounces Au Eq. at 7.0 g/t Au Eq.* Initial Mine Life 7.3 years Project Revenue (Stage 1 Only) >$510 million Average Annual Production >50,000oz Au Eq. Operating Costs (for 30,000oz

  10. Slide 10: Hera Development: Modular Process Facility

    HERA DEVELOPMENT MODULAR PROCESS FACILITY • All long lead time orders placed • Mill Construction commencing Q2 2013 FLOTATION CIRCUIT 56% LEAD + ZINC BULK CONCENTRATE GRINDING AND GRAVITY MODULE 91% LEAD RECOVERY 60% GRAVITY GOLD RECOVERY 90% ZINC RECOVERY PRIMARY AND SECONDARY TERTIARY CRUSHING CRU

  11. Slide 11: Hera Development Underway

    HERA DEVELOPMENT DEVELOPMENT UNDERWAY • Decline commenced January 2013 – Underground advance to ~1125m (at 31st July) • First Production Q3 2014 Quarter Mar-13 Jun-13 Sep-13 Dec-13 Mar-14 Jun-14 Sep-14 Dec-14 Mine Mine: Ore to the ROM Full Scale Ore Production Mill Mill Construction Mill Practical C

  12. Slide 12: Prospectivity

    PROSPECTIVITY HERA-NYMAGEE CORRIDOR Nymagee North Target (strongest gravity • Hera-Nymagee corridor remains highly prospective response in region) • The Hera & Nymagee deposits are both marked by Nymagee Copper prominent gravity highs Deposit • Numerous gravity targets defined by detailed ground Gra

  13. Slide 13: Nymagee Copper Deposit vs CSA

    NYMAGEE COPPER DEPOSIT vs CSA SCHEMATIC CROSS SECTION COMPARISON - LOOKING NORTH SHALLOW MAIN SHAFT COPPER ZONE • Nymagee evolving as Pb-Zn-Ag Lens (off section) the upper part of a -200m -200m MAIN LENS MAIN LENS MASSIVE SULPHIDE ‘CSA’ style Cobar >2.5% Cu Low-Grade Cu Mineralisation deposit High-G

  14. Slide 14: Nymagee Copper Deposit

    NYMAGEE COPPER DEPOSIT OPEN TO NORTH AND AT DEPTH NYMAGEE NYMAGEE NORTH GRAVITY HIGH GRAVITY HIGH NMRC090: 3m @ 2.75% Cu and 50g/t Ag NMD068: 14m @ 63g/t Ag, 2.7% Pb and 5.2% 200m ASL NYMAGEE RESOURCE: 8.1Mt @ 1.2% Cu, 0.3% Pb, 0.7% Zn and 9g/t Ag NMD078 (Northernmost hole) NMD060W1:12m @ 1.3% Cu an

  15. Slide 15: Hera-Nymagee Summary

    HERA-NYMAGEE SUMMARY FULLY FUNDED HIGH-GRADE Au-Pb-Zn-Ag-Cu DEVELOPMENT WITH EXPLORATION UPSIDE • Full scale Hera Project development imminent and set to deliver: • >$510 million in revenue in Stage 1 (Hera) • Operating Costs of ~A$400/ounce Au* after Pb-Zn credits • Initial Mine Life of 7.3 years •

  16. Slide 16: Building a Mid-Tier Mining Company

    GROWTH YTC Resources Limited ASX:YTC 2 Corporation Place HERA AND NYMAGEE ORANGE NSW 2800 FULLY FUNDED TO PRODUCTION T: +61 2 6361 4700 E: office@ytcresources.com www.ytcresources.com 16 BUILDING A MID-TIER MINING COMPANY

  17. Slide 17: Appendix 1: Resources and Reserves

    APPENDIX 1: RESOURCES AND RESERVES MINERAL RESOURCE ESTIMATE- HERA DEPOSIT - JUNE 2011 NSR Cu Pb Zn Au Eq Contained Au Category Tonnes (A$) Au g/t Ag g/t % % % (g/t) Ozs Eq Indicated 2,113,000 243 4.2 17.0 0.2 2.8 3.9 9.2 Inferred 330,000 207 3.5 14 0.1 2.3 3.3 7.5 Total 2,444,000 238 4.1 16.7 0.2 2

  18. Slide 18: Appendix 2: Other Projects - Kadungle Copper-Gold

    APPENDIX 2: OTHER PROJECTS KADUNGLE COPPER-GOLD 560,200 mE 560,400 mE 560,600 mE PDH8 100m @ 0.2g/t Au & 0.11% Cu PL3: 34m @ 0.98g/t Au & 0.14% Cu Large scale, porphyry copper-gold target. Highlight 6,378,800 mN 6,378,800 mN intersections over +2km strike: KDD002 KDD013 12m @ 7.73g/t Au & 0.1% Cu KD

  19. Slide 19: Appendix 2: Other Projects - Doradilla

    APPENDIX 2: OTHER PROJECTS DORADILLA: TIN-COPPER-SILVER-LEAD-ZINC 16km skarn zone hosting large scale tin mineralisation with associated copper, silver, lead, zinc and indium. Recent Drill results: • DRAC004: 7m @ 0.93% Sn from 10m • DRAC006: 6m @ 0.61% Sn from 44m • DRAC009: 10m @ 1.09% Sn from 80m

  20. Slide 20: Appendix 2: Other Projects - Tallebung Tin

    APPENDIX 2: OTHER PROJECTS TALLEBUNG: TIN Very large scale ‘porphyry’ tin target Outcropping Tin Lodes remains untested. Negotiations with Native Title DDH11: 30.2m @ 0.12% Sn claimants continues. YTC hoping to finalise agreements in May 2013. DDH16: DDH11: 12.8m @ 0.27% Sn 250m 30.2m @ 0.12% Sn Tar

  21. Slide 21: Appendix 3: Gold Equivalent Calculations - Hera DFS

    APPENDIX 3 GOLD EQUIVALENT CALCULATIONS – HERA DFS & HERA RESERVE This presentation makes references to the Hera Ore Reserve, DFS outputs and metal equivalents. It is the Company's opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be recovered

  22. Slide 22: Appendix 3: Gold Equivalent Calculations - Hera Resource

    APPENDIX 3 GOLD EQUIVALENT CALCULATIONS – HERA RESOURCE This presentation makes a number of references to metal equivalents. These metal equivalent values refer to those included with Hera Resource Estimate released to the ASX on 2nd June 2011 It is the company's opinion that all the elements includ

  23. Slide 23: Appendix 4: Board of Directors

    APPENDIX 4 BOARD OF DIRECTORS Partner of PricewaterhouseCoopers Australia (Coopers & Lybrand) for 19 years specialising in the Anthony Wehby provision of corporate finance advice. Anthony is based in Sydney and maintains a consulting practice Non-Executive Chairman providing advice on mergers and ac

  24. Slide 24: Appendix 5: Hera Development DFS

    APPENDIX 5: HERA DEVELOPMENT DFS – SEPTEMBER 2011 HERA DFS 3D view of Hera Mine Design showing mine capital development, final Diluted Reserve (tonnes) 1,875,918 stope design and CRF fill. Diluted Reserve Grade  g/t Au (on gold equivalent basis) 7g/t Au Eq.  Net Smelter Return (NSR) $218 / tonne M

  25. Slide 25: Appendix 6: YTC Senior Management

    APPENDIX 6: YTC SENIOR MANAGEMENT BUILDING AN EXPERIENCED OPERATIONS TEAM Dean Fredericksen –Chief Operations Officer (COO) Dean has been closely involved on the assessment and Feasibility of the Hera and Nymagee Projects since 2009 and joined YTC as COO in March 2011. Dean brings over 20 years mine

  26. Slide 26: Appendix 7: Funding Structure

    APPENDIX 7: FUNDING STRUCTURE Placement Shares: 9,390,000 Amount A$2,946,582.00 Issue Price: $0.3138 per share (being a 25% premium to YTC’s 30 day VWAP) Glencore Position: The placement will increase Glencore’s total shareholding in YTC to 9.9% (undiluted) Facility A Limit: A$20 million Converting

  27. Slide 27: Competent Persons Statements

    COMPETENT PERSONS STATEMENTS Competent Persons Statement – Exploration Results The information in this presentation that relates to Exploration Results is based on information compiled by Rimas Kairaitis, who is a Member of the Australasian Institute of Mining and Metallurgy. Rimas Kairaitis has suf