Whitehaven Coal Limited · ASX:WHC

Whitehaven Coal — Morgan Stanley Conference 2009

25 slides from Whitehaven Coal's conference presentation, May 5, 2009

  1. Slide 1: Whitehaven Coal Limited: Delivering Growth

    Whitehaven Coal Limited Delivering Growth Presentation to Morgan Stanley Conference May 5, 2009

  2. Slide 2: Disclaimer

    Disclaimer Statements contained in this material, particularly those regarding the possible or assumed future performance, costs, dividends, returns, production levels or rates, prices, reserves, potential growth of Whitehaven Coal Limited, industry growth or other trend projections and any estimate

  3. Slide 3: Contents

    Contents • A snapshot • Status of growth plans • Outlook • The merger with Gloucester Coal Morgan Stanley Conference - May 5, 2009 2

  4. Slide 4: A snapshot

    A snapshot ASX listed company “WHC”; market capitalisation ~A$800 million Large coal resources in the Gunnedah Basin (refer ASX release 10th March 2009) Superior coal quality: PCI + low-ash, low-sulphur, high energy thermal coals First mover and major coal producer/developer in the Gunnedah Basin Sa

  5. Slide 5: Experienced managers/owners

    Experienced managers/owners Director/Title Experience John Conde AO +30 years commercial experience Non-Executive Chairman • Directors have extensive coal industry experience. Neil Chatfield +25 years in transport and resources Non-Executive Director industries • Directors are proven mine developers

  6. Slide 6: Strong financial position

    Strong financial position A$ millions 30 June 2008 31 December 2008 Cash 80.8 76.6 Current receivables 49.0 172.4 Other current assets 59.2 53.1 Non-current receivables 27.2 157.0 Other non-current assets 407.1 462.7 Total assets 623.3 921.8 Payables 37.9 40.2 Tax payable 10.1 85.9 Interest bearing

  7. Slide 7: Whitehaven is the leading coal producer and developer in the Gunnedah Basin

    Whitehaven is the leading coal producer and developer in the Gunnedah Basin Morgan Stanley Conference - May 5, 2009 6

  8. Slide 8: Gunnedah operations - Tarrawonga mine

    Gunnedah operations - Tarrawonga mine ► 1.5 Mtpa ROM capacity ► PCI & high quality thermal coals ► Saleable yield >90% ► ROM coal trucked to Gunnedah CHPP ► WHC owns 70% of JV Morgan Stanley Conference - May 5, 2009 7

  9. Slide 9: Gunnedah operations - Rocglen mine

    Gunnedah operations - Rocglen mine ► 1.5 Mtpa ROM capacity ► PCI and thermal coals ► Saleable yield ~85% ► ROM coal trucked to Gunnedah CHPP Morgan Stanley Conference - May 5, 2009 8

  10. Slide 10: Gunnedah operations - Sunnyside mine

    Gunnedah operations - Sunnyside mine ► Commenced December 2008 ► 1.0 Mtpa ROM capacity ► Thermal coals ► ROM coal trucked to Gunnedah CHPP Morgan Stanley Conference - May 5, 2009 9

  11. Slide 11: Gunnedah operations – CHPP and rail loader

    Gunnedah operations – CHPP and rail loader ► ~50% ROM coal washed ► Washed yield >80% ► Total yield >90% ► CPP upgrade to 3 Mtpa ► 24-7 rail loading to 4 Mtpa Morgan Stanley Conference - May 5, 2009 10

  12. Slide 12: Werris Creek mine

    Werris Creek mine ► 1.5 Mtpa capacity ► PCI and thermal coals ► Saleable yield 100% ► Own crushing and rail load-out Morgan Stanley Conference - May 5, 2009 11

  13. Slide 13: Contents

    Contents • A snapshot • Status of growth plans • Outlook • The merger with Gloucester Coal Morgan Stanley Conference - May 5, 2009 12

  14. Slide 14: Narrabri Stage 1 construction on track

    Narrabri Stage 1 construction on track Highway Upgrade Access Road Water Management Rail Loop 3.6 km Industrial Area Box Cut Morgan Stanley Conference - May 5, 2009 13

  15. Slide 15: Established production with high growth

    Established production with high growth ► Five OC mines now in production, Canyon to close in 2009 ► Saleable production capacity in 2009 ~ 5Mtpa ► Narrabri Stage 1 under construction, first coal in Q4 2009 ► WHC has invested in rail track capacity upgrades to support growth plans ► Port capacity is

  16. Slide 16: Projects are on track and being coordinated with infrastructure development

    Projects are on track and being coordinated with infrastructure development Morgan Stanley Conference - May 5, 2009 15

  17. Slide 17: Rail infrastructure to meet Whitehaven growth

    Rail infrastructure to meet Whitehaven growth Whitehaven (60%) and Idemitsu (40%) have sponsored ARTC investment to increase rail track capacity (Stages 1, 2 and 3) Current track capacity is 6-7 train paths per day to Gunnedah 5,400 tonne trains give capacity of 11-12 Mtpa between Whitehaven and Ide

  18. Slide 18: Port infrastructure to meet Whitehaven growth

    Port infrastructure to meet Whitehaven growth ► Existing PWCS Terminal ƒ Ongoing capacity constraints at PWCS ƒ PWCS has expansion plans to 145 Mtpa ► Newcastle Coal Infrastructure Group (“NCIG”) ƒ Whitehaven owns 11% of NCIG....Stage 1 due to be commissioned in Q1 2010 ƒ Stage 1 capacity of 30 Mtpa

  19. Slide 19: Port capacity may limit WHC growth rate

    Port capacity may limit WHC growth rate 1. These estimates relate to planned future events and expectations and as such involve known and unknown risks and uncertainties. Please refer to Disclaimer Morgan Stanley Conference - May 5, 2009 18

  20. Slide 20: Contents

    Contents • A snapshot • Status of growth plans • Outlook • The merger with Gloucester Coal Morgan Stanley Conference - May 5, 2009 19

  21. Slide 21: Coal market uncertainty

    Coal market uncertainty Demand – Cyclical slowdown, but structural uptrend • Global demand for export coking coal remains very weak. Thermal coal is better, but weaker than six months ago • China currently importing much larger tonnages of Australian thermal coal, India following Supply – Infrastruc

  22. Slide 22: Looking ahead: Whitehaven is well positioned

    Looking ahead ► Challenging business environment ► Weaker coal demand, lower US$ coal prices, but a weaker A$ ► Continued port and rail congestion ► Increased “take” by NSW Government from higher royalty rates (+20%) ► Whitehaven is well positioned ► Large reserves of high quality coal ► Efficient m

  23. Slide 23: Near and medium term objectives

    Near and medium term objectives ► Continue to manage our existing OC operations efficiently ► Deliver Narrabri Stage 1 on time and budget ► Complete rail upgrade to Narrabri ► See NCIG Stage 1 delivered on time ► Active exploration within Gunnedah lease/EL areas ► Increase coal reserves and extend l

  24. Slide 24: Merger with Gloucester Coal

    Merger with Gloucester Coal ► Creation of a major Australian coal company with increased scale and enhanced financial strength ► Increased scale : market capitalisation, production, embedded growth potential, resources and reserves ► Enhanced financial strength: strong financial platform from which

  25. Slide 25: Whitehaven Coal Limited: Delivering Growth

    Whitehaven Coal Limited Delivering Growth Presentation to Morgan Stanley Conference May 5, 2009