Nagambie Resources Limited · ASX:NAG

Nagambie Resources — Shareholder Meeting (November 2017)

26 slides from Nagambie Resources's shareholder meeting presentation, Nov 24, 2017

  1. Slide 1: Annual General Meeting CEO Presentation

    Annual General Meeting CEO Presentation 24 November 2017

  2. Slide 2: Disclaimer & Competent Person’s Statement

    Disclaimer & Competent Person’s Statement FORWARD-LOOKING STATEMENTS This presentation contains “forward-looking statements” within the meaning of securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward-looking words such as “may”, “w

  3. Slide 3: Strategy overview

    Strategy overview Shareholder Value Non – Gold Assets Develop and realise value Gold tenements Grow and maximise value through cost effective exploration and development Produce Nagambie Mine site Gold Develop as a regional centre for gold production 2017 Annual General Meeting - CEO presentation 2

  4. Slide 4: Gold exploration and development; PASS Project; Quarrying

    Gold exploration and development PASS Project Quarrying Reprocessing tailings for gold General operations 2017 Annual General Meeting - CEO presentation 3

  5. Slide 5: Gold exploration and development

    Gold exploration and development 2016/17 • Conducted aeromagnetic surveys over selected tenements • Refined Nagambie Region Gold Model • Picked up new tenements based on the model 2017 Annual General Meeting ‐ CEO presentation 4

  6. Slide 6: Gold exploration and development

    Gold exploration and development Nagambie Resources now has:  100% control of all the silicified sandstone/siltstone outcropping and near-outcropping ground in the Waranga Domain of the Melbourne Zone, which is highly prospective for gold-in-sediments deposits  Access to Geoff Turner and his enhan

  7. Slide 7: Gold exploration and development

    Gold exploration and development 2017 Annual General Meeting - CEO presentation 6

  8. Slide 8: Gold exploration and development

    Gold exploration and development In comparison to the Fosterville Gold Mine sulphide-gold orebodies, Nagambie region sulphide-gold orebodies:  Are in the same host rocks (silicified sandstone and siltstone sediments)  Have the same mineralisation style at surface (antimony-arsenic- associated, fin

  9. Slide 9: Gold exploration and development

    Gold exploration and development 2018 1. Commence IP surveys at: • Nagambie Mine – next week • Racecourse – Dec 17 / Jan 18 Results in Jan / Feb 18 2. IP survey of Wandean after IP surveys of Mine and Racecourse Prospect 3. Aeromagnetic survey of Miepoll area 4. Diamond drilling of best IP sulphide‐

  10. Slide 10: PASS Project

    PASS Project • A rehabilitation project Potential Acid Sulfate Soil and Rock (PASS) 2017 Annual General Meeting ‐ CEO presentation 9

  11. Slide 11: PASS Project

    PASS Project Quantity of PASS that could be generated from major projects 1,200,000 tonnes Nagambie Resources’ Pits: ≈3.4 Million 2.5M tonnes of tonnes of developed storage 200,000 tonnes PASS capacity (West Pit) 3.5M tonnes of potential storage ≈2,000,000 tonnes capacity (East Pit) 2017 Annual Gene

  12. Slide 12: PASS Project

    PASS Project The recent The Australia Institute Report (The Dark Side of the Boom) states: • Could be 19,000 abandoned mining related sites in Vic • Bonds held by Vic Govt = $160M • Estimate of total rehabilitation liabilities = >$938M • Government is starting to focus on rehabilitation 2017 Annual

  13. Slide 13: PASS Project

    PASS Project • Melbourne landfill space is rapidly diminishing • Waste management planning assumes maximum expansion of 5 existing landfills in outer Melbourne (including Ravenhall) • Looming legal challenge over the expansion of Ravenhall The Age, 5 Aug 2017 "If this site (Ravenhall) does not recei

  14. Slide 14: PASS Project

    PASS Project 2016/17 • Installed groundwater monitoring bores • Commenced hydrogeological assessment • Finalised all permitting applications 2017 Annual General Meeting - CEO presentation 13

  15. Slide 15: Quarrying

    Quarrying EY May 2016 p.4 Demand for extractive resources by LGA to 2050 2017 Annual General Meeting - CEO presentation 14

  16. Slide 16: Quarrying

    Quarrying “Road base Class 1 and 2, concrete and concrete sand have been identified throughout the analysis as potential areas of concern due to their minimal substitutability” (p5) 2017 Annual General Meeting - CEO presentation 15

  17. Slide 17: Quarrying

    Quarrying • Production of concrete aggregates from mine tailings 2017 Annual General Meeting - CEO presentation 16

  18. Slide 18: Quarrying: Concrete aggregates

    Quarrying CONCRETE AGGREGATES Competitive advantages: • 3,000,000 tonnes of material available • Rock is already crushed • Aggregates are suitably angular (less cement is needed) • Aggregates are a recycled product 2017 Annual General Meeting - CEO presentation 17

  19. Slide 19: Quarrying: Sand

    Quarrying SAND 2016/17 • Prepared first preliminary pit design • Circa 400,000 tonnes of sand • Commenced preparation of internal roads and sand stockpiling area • Commenced approvals process • Planning permit • Work Plan 2017 Annual General Meeting - CEO presentation 18

  20. Slide 20: Quarrying: Sand 2018

    Quarrying SAND In 2018 1. Continue the approvals process • Ecological studies • Hydrogeological modelling • Establish vegetation offsets • Community consultations 2. Finalise construction of internal roads and sand stockpiling area 3. Trial sand screening with MFS 2017 Annual General Meeting - CEO p

  21. Slide 21: Quarrying: Clay

    Quarrying CLAY • Complete planning approval for new clay pit by end 2017 • Can be used in crushed rock products, or as capping material for landfills • Flexibility with onsite infrastructure 2017 Annual General Meeting - CEO presentation 20

  22. Slide 22: Quarrying: Crushed rock products

    Quarrying Crushed rock products MFS enables: • Production of Class 3 and 4 CR from overburden dumps • Re-process existing non-spec stockpiles into saleable products Revenues • Selected on Strathbogie Shire’s quarry products 3-year supply panel • UETF likely to commence construction in early 2018 • I

  23. Slide 23: Reprocessing ‘fines’ for gold

    Reprocessing ‘fines’ for gold Concrete aggregates ≈3,000,000 tonnes ‘Fines’ – Gold bearing ≈3,000,000 tonnes Heap leach material ≈6,000,000 tonnes 2017 Annual General Meeting - CEO presentation 22

  24. Slide 24: Reprocessing ‘fines’

    Reprocessing ‘fines’ • Based on historic data, heap leach material could average 0.2 g/t of gold* • Potentially 19,000+ ounces of gold in the ‘fines’ • Potential value of in-situ gold in fines ≈ $32m+ (at $1,700 / ounce) * 0.2 g/t of gold based on historically reported head grade of 1.0 g/t and repo

  25. Slide 25: General operations

    General operations • Weighbridge • IT/Comms cost reductions • VoIP • Reliable internet access • Remote data / information access • Office connection with weighbridge • Fire risk management 2017 Annual General Meeting - CEO presentation 24

  26. Slide 26: www.nagambieresources.com.au

    www.nagambieresources.com.au James Earle – Chief Executive Officer james@nagambieresources.com.au 0481 462 642 2017 Annual General Meeting - CEO presentation 25

Nagambie Resources — Shareholder Meeting (November 2017) on 6ix