Tellurian Inc

Tellurian — Investor Presentation (September 2017)

45 slides from Tellurian's investor presentation, Sep 6, 2017

  1. Slide 1: Corporate presentation September 2017

    Corporate presentation September 2017 Exhibit 99.1

  2. Slide 2: Cautionary statement

    Cautionary statement Forward looking statements Non-GAAP financial measures Telurian, EBITDA within the Imaning of Sesion 274 te Secu At 21099, a8 amended, an Secon 216 of tho Secures Exchange Act of 18%, as amended a statements other than Statements of historca ooking a mac 88 a ce and er Togulory

  3. Slide 3: Tellurian introduction

    Feb 2016:Charif Souki and Martin Houston established Tellurian as a private company Aug 2016:Meg Gentle joined to lead the company as President & CEO Dec 2016:GE invested $25 MM in Tellurian equity Jan 2017:Total invested $207 MM in Tellurian equity Feb 2017:Merged with Magellan Petroleum to gain ac

  4. Slide 4: Pursuing accretive business along value chain

    Pursuing accretive business along value chain Strategy Purchase low-cost gas at liquidity points, in field or as reserves Maximize margins & optionality Diversify gas supply Develop pipeline solutions for LNG plants in Louisiana Develop low-cost liquefaction Deliver LNG to end use markets worldwide

  5. Slide 5: LNG oversupply is over – price signals work

    LNG oversupply is over – price signals work Low prices have stimulated LNG demand growth . . . but effective capacity utilization is over 98% . . . 2018 expected to be very tight . . . and price surges expected to signal the call for additional supply. CME expected to launch futures trading for Gulf

  6. Slide 6: Cornerstone project: Driftwood asset

    Cornerstone project: Driftwood asset Driftwood terminal Land ~1,000 acres near Lake Charles, LA Nameplate = ~26 mtpa(’) capacity Trains = Up to 20 trains of 1.3 mtpa each © Le cnaies i = Chart heat exchangers eee pr Ms "New Orleans, Lousiana @ = GE LM6000-PF+ compressors Storage = 3 storage tanks =

  7. Slide 7: Driftwood LNG cost competitive

    Driftwood LNG cost competitive Source:Wood Mackenzie (Q4 2016), Tellurian estimates Note:(1) Includes owners’ costs and contingencies and excludes financing and pipeline related costs (2) Excludes development costs related to berths and storage tanks (3) Increase in costs tied to EPC as per 2Q17 CBI

  8. Slide 8: History of moving quickly through regulatory process

    History of moving quickly through regulatory process We employ many of the same members that executed Sabine Pass Source: FERC regulatory filings Note:(1) Duration of FERC review for Driftwood Project filing based on Tellurian estimates

  9. Slide 9: Tellurian underpinned by simple capital structure

    Tellurian underpinned by simple capital structure Ownership structure Financing assumptions Construction & pipeline capex 20 Trains: ~$13 - 16 Bn(5) 96-mile pipeline: ~ $1.6 - 2.0 Bn(6) Capital structure Debt-to-total capital Liquefaction plant: ~70% Pipeline: ~80% Plan to raise capital at OpCo leve

  10. Slide 10: Tellurian competitive advantages

    Tellurian competitive advantages Unmatched experience, proven results Total headcount of ~100 professionals with decades of industry experience at Cheniere, BG Group and others Collectively, our team has constructed ~55 mtpa (20%) of liquefaction capacity worldwide, all delivered on schedule Founder

  11. Slide 11: Tellurian Timeline

    Tellurian Timeline Significant value creation expected in the next 12 months Note:(1) LSTK represents lump sum turnkey Engineering Bechtel engaged to complete robust FEED Feb/16 LSTK(1) EPC contract expected mid-2017 Notice to Proceed with construction expected mid-2018 Driftwood LNG first LNG cargo

  12. Slide 12: Conclusions

    Conclusions Global market needs environmentally beneficial and reliable natural gas U.S. is best positioned to meet supply needs with abundant low-cost gas, and the resources to build low-cost liquefaction LNG prices > $5.50 per MMBtu at the Gulf Coast Marker give the signal that additional liquefac

  13. Slide 13: Expected to produce first LNG in 2022

    Expected to produce first LNG in 2022 Driftwood LNG Artist Rendition

  14. Slide 14: Contact us

    Contact us = Amit Marwaha = Joi Lecznar Director, Investor Relations & Finance SVP, Public Affairs & Communication +1 832 485 2004 +1 832 962 4044 amit.marwat ianinc.com joi.lecznar@tellurianinc.com W @TellurianLNG

  15. Slide 15: Appendix: Leadership team, partners and capital structure

    Appendix Leadership team, partners and capital structure

  16. Slide 16: Board of Directors

    Board of Directors Dillon J. Ferguson, Director, Chairman of Governance Committee Dillon J. Ferguson is a partner at Pillsbury Winthrop Shaw Pittman LLP in its energy and litigation practices, focusing his practice on oil and gas law, with an emphasis on both transaction and litigation matters. His

  17. Slide 17: Leadership team

    Leadership team ‘Meg Gentle, CEO and President mer England Keith Teague, Chief Operating Officer + Former EVP, Texas Daniel Belhumeur, General Counsel = Former VP, Tax and General Tax Counsel of Cheniere Energy Antoine Lafargue, Chief Financial Officer . 9 = Prior roles in M&d Tarek Souki, SVP LNG M

  18. Slide 18: Leadership team

    Leadership team Howard Candelet, SVP Projects Joined Telluri Mark Evans, SVP Gas Supply = Spent gy i tit 10 year Margie Harris, SVP Chief Human Resources Officer John Howie, President Tellurian Production Company 7 it it it , deploying . founder of Sachs E&P Capital Joi Lecznar, SVP Public Affairs a

  19. Slide 19: Leadership team

    Leadership team Joey Mahmoud, President ood Pipeline LLC + Over NG, fractionation Graham McArthur, Treasurer /enture Global LNG, Inc. r . Kurth LLP, Fil general corporate and securities matters é i Pat Outtrim, SVP Government and Regulatory Affairs . permitting, = Assisted it TUS LI . rd Khaled Shar

  20. Slide 20: Key project partners

    Key project partners Liquefaction technology World-class cold box manufacturer for all technologies – supplied more than 10,000 brazed aluminum heat exchanger (BAHX) cores – more than 500 for LNG service Driftwood LNG to use the Integrated Pre-cooled Single Mixed Refrigerant (IPSMR®) liquefaction pr

  21. Slide 21: Potential Future Funding Sources

    Potential Future Funding Sources Tellurian Inc. (NASDAQ:TELL) Public equity issuance Driftwood Pipeline Project finance debt Project equity Project finance debt Driftwood LNG Tellurian Production Company RBL facility Bonds Equity partners Equity partners Private equity partners Corporate bonds

  22. Slide 22: Appendix: LNG market

    Ss Appendix LNG market TELLURIAN

  23. Slide 23: U.S. remains the most flexible and competitive LNG supply solution

    U.S. remains the most flexible and competitive LNG supply solution U.S. advantaged as a global energy center Continued expansion of integrated infrastructure defines the most flexible and cost effective energy system in the world Can react quickly to market changes regardless of price direction Cont

  24. Slide 24: LNG market: from surplus to shortfall

    LNG market: from surplus to shortfall Source:Wood Mackenzie (Q3 2016) Note:(1) Assumes liquefaction capacity utilization rate of 95%, 90% and 85% in 2021, 2022 and 2023, respectively, and 85% thereafter (2) Driftwood LNG assumed to have liquefaction capacity of ~26 mtpa (3) FID shortfall grossed up

  25. Slide 25: ~100 mtpa of additional liquefaction needed by 2025

    ~100 mtpa of additional liquefaction needed to meet LNG demand by 2025 Source:Wood Mackenzie (Q1 2017) Note:(1) Actual LNG consumption in 2016 (2) Actual LNG global liquefaction capacity in 2016 (3) Estimate of liquefaction capacity of projects under construction (4) Estimated reduction of liquefact

  26. Slide 26: 12% Growth in Asia / Middle East LNG demand in 2016

    12% Growth in Asia / Middle East LNG demand in 2016(1) Source:IHS Markit Waterborne Note:(1) 2016 year-on-year change (2) AME represents Asia and Middle East (2) (2)

  27. Slide 27: Low prices incentivize faster demand growth

    Low prices incentivize faster demand growth Asian LNG demand grew significantly over the same period in 2016; lower LNG prices are stimulating demand in Asia YoY demand is up ~12%. If current level of growth continues, markets will be short capacity by 2020, resulting in call on new capacity and hig

  28. Slide 28: The U.S. offers the right product to customers

    The U.S. offers the right product to customers Source: IHS Energy. Note: (1) Break-even price estimated based on FOB costs at $50/Bbl.

  29. Slide 29: Fast-growing FSRU market

    Fast-growing FSRU market Source: Wood Mackenzie April/2017 Floating Storage Regasification Unit capacity increasing

  30. Slide 30: Spot market under development

    Spot market under development Source: GIIGNL 2017 publication, Wood Mackenzie Q1 2017 . Note: (1) Assuming 3 Bcf per cargo and 51 Bcf of gas per mtpa of LNG.

  31. Slide 31: Expiration of existing contracts

    Expiration of existing contracts Source: IHS Energy. Note: Based on executed Sale and Purchase Agreements and Liquefaction Tolling Agreements.

  32. Slide 32: Contracts signed in 2016

    Contracts signed in 2016 Contracts by duration Contracts by type of supplier Source: GIIGNL (2017). Note: (1) Short term: 4-years or less. (2) Medium term: between 5 and 10 years. (3) Long term: longer than 10 years. (4) Represents sales from portfolio players. (5) Consists of projects that are subj

  33. Slide 33: Points of transition in the LNG market

    Three large supply centers Steady non-traditional demand growth Barriers to entry reduced Flexible contracting structures Revocation of destination restrictions Geographic fragmentation LNG index pricing Supply competition Points of transition in the LNG market

  34. Slide 34: Appendix: Terminal

    Ss Appendix Terminal TELLURIAN

  35. Slide 35: Driftwood 1,000 acre site unique in Louisiana

    Driftwood 1,000 acre site unique in Louisiana Ample construction and laydown space, distinguishes project from others in U.S. Gulf Coast Artist Rendition

  36. Slide 36: Driftwood terminal vs. traditional LNG plant – design

    Driftwood terminal vs. traditional LNG plant – design DWLNG layout: 5.2 mtpa Traditional layout: 4.5 mtpa GE LM6000 PF+ (x4): cheapest dollar per installed horsepower = more LNG production per acre Gas pre-treatment facility Chart cold boxes (x4): IPSMR technology uses single mixed refrigerant; desi

  37. Slide 37: Driftwood Project cost competitive

    Driftwood Project cost competitive Source: IHS Energy Jan/2017

  38. Slide 38: FERC approval process

    Authorization under Section 3 (terminal) and Section 7 (pipeline) of the Natural Gas Act FERC designated as lead agency Oversee siting, construction and operation of LNG facilities by Energy Policy Act 2005 Provide National Environmental Policy Act (NEPA) analysis and develop Environmental Impact St

  39. Slide 39: Appendix: Pipeline

    Ss Appendix Pipeline TELLURIAN

  40. Slide 40: Driftwood pipeline

    Driftwood pipeline Key facts Length 96 miles Size 48” – 74 miles 42” – 11 miles 36” – 11 miles Capacity(1) ~4.0 Bcf/d Access ~32 Bcf/d flowing gas Capex. ~$1.6 – $2.0 Bn(2) Regulatory FERC Timing Construction planned to begin in 2019 Location Evangeline, LA to Calcasieu, LA Pipeline map Note:Note: A

  41. Slide 41: Driftwood LNG access to prolific resource base

    Driftwood LNG access to prolific resource base Source: Platts, EIA (DPR July 2017). Note: Technical recoverable resources per EIA report, April 2015. Major basins provide liquidity, minimize price risk Permian Basin Barnett Basin Haynesville Basin Fayetteville Basin Marcellus Basin Utica Basin Eagle

  42. Slide 42: Driftwood pipeline gas access minimizes risk

    Driftwood pipeline gas access minimizes risk Source: EIA, Tellurian. Note: Data refers to resource within operating footprint of Driftwood pipeline (DWPL) &Driftwood LNG (DWLNG) Pipeline capacity refers to combined capacity of pipelines connecting to directly to DWPL Meter stations refers to maximum

  43. Slide 43: Driftwood LNG gas access

    Driftwood LNG gas access Optimal mix and resource availability and accessibility 588.3 Tcf of resources 41.3 Bcf/d of daily production 31.8 Bcf/d of pipeline capacity 12.5 Bcf/d of pipeline connections Source: EIA, Tellurian. Note: (1) EIA; Reserves = technical recoverable resources, 2015. (2) EIA D

  44. Slide 44: Southwest Louisiana: core of U.S. exports

    Southwest Louisiana: core of U.S. exports Core of U.S. natural gas exports Louisiana Texas Gulf of Mexico Inbound from Perryville 2024 4.8 Bcf/d Inbound from East 2024 3.2 Bcf/d Inbound from Perryville 2024 1.7 Bcf/d Inbound from West 2024 2.0 Bcf/d Inbound to Gillis 2024 4.0 Bcf/d Southwest Louisia

  45. Slide 45: Southwest Louisiana: core of U.S. nat. gas exports

    Southwest Louisiana: core of U.S. nat. gas exports Gas production from the Permian expected to increase to ~13 Bcf/d by 2025 with limited export capacity Source: Goldman Sachs. Note: (1) Forecast based on WTI price of $52/Bbl oil, $3.00/mmBtu natural gas; production split of 57% oil, 23% NGLs and 20

Tellurian — Investor Presentation (September 2017) on 6ix