Ferro-Alloy Resources Ltd. · LSE:FAR
Ferro-Alloy Resources — Investor Presentation (March 2021)
30 slides from Ferro-Alloy Resources's investor presentation, Mar 28, 2021
Slide 1: Corporate Presentation Q1 2021
CORPORATE PRESENTATION Q1 2021
Slide 2: Overview
Overview Vanadium producer in Kazakhstan with the world’s most prospective deposit Legend Capital Major towns Kyzylorda FAR Project Corporate Aktobe • Listed on London Stock Exchange and Karaganda Astana International Exchange • Operations: Kazakhstan Astana Activities Almaty • Existing production –
Slide 3: Strategic Investment
Strategic Investment Vision Blue Resources has made a long-term strategic investment Led by Sir Mick Davis, former Xstrata CEO, Vision Blue has made a multi-stage strategic investment into FAR: $3.1m initial investment, $1.5m in equity & Construction Funding Rights: To invest $1.6m in convertible lo
Slide 4: The Vanadium Market
The Vanadium Market Corporate Presentation | Q1 2021 4
Slide 5: Vanadium
Vanadium Used in established industries and emerging green technology Uses: 3.5% 1.2% 4.3% Steel Alloy Titanium Alloy 90% consumed by global Vanadium Flow Vanadium steel industry Batteries end-use Chemical catalyst Other 91.0% Titanium alloys - e.g. Ceramics and jet engine and aircraft chemicals ind
Slide 6: Vanadium is a battery metal
Vanadium is a battery metal An entirely new major market for vanadium Projected annual demand in 2050 for Energy Technologies as a percentage of 2018 Production Levels under 2DS Cobalt Source: presentation to Vanitec 2020 Corporate Presentation | Q1 2021 6
Slide 7: Vanadium Price History
Vanadium Price History Metal Bulletin V2O5 Monthly Midpoint Average Real Price Jan. 2004 - Dec. 2020 Inflated to Nov. 2020 US$ $40.00 May ‘05: $37.10 $35.00 $30.00 US$/Pound V2O5 Nov ’18: $28.42 Mean $9.03 Median $7.24 $25.00 Current $7.63 (4 March 2021) US$/Pound V2O5 $20.00 Jun ’08: $17.53 $15.00
Slide 8: The vanadium price is volatile
The vanadium price is volatile The average price is much higher than the usual price – impacted by periodic spikes to very high levels Source: Metal Bulletin, TTP Squared, Inc. Corporate Presentation | Q1 2021 8
Slide 9: World Market for Vanadium is growing strong
World Market for Vanadium is growing strong Deficit forecast for 2021 V Consumption 2019 2020e 2021e Ex China Steel Production (million MT) 848,075 757,354 815,000 KgV/MT Steel 0.0554 0.0572 0.0590 Total Vanadium (MTV) 47,000 43,363 48,085 China Steel Production 994,166 1,060,981 1,077,886 KgV/MT St
Slide 10: Two operations
Two operations A: Existing processing operation B: Balasausqandiq project Corporate Presentation | Q1 2021 10
Slide 11: Two Operations
Two Operations Two Projects operating on the same site: A. EXISTING OPERATION B. BALASAUSQANDIQ PROJECT • Treating purchased secondary material • A huge deposit with economic potential to recover vanadium pentoxide in a class of its own • Existing capacity around 700 tonnes per • Upgrade of existing
Slide 12: Existing operation
Existing operation Corporate Presentation | Q1 2021 12
Slide 13: Existing Process Plant - Today
Existing Process Plant - Today • Recovers vanadium and molybdenum from recycled raw-materials • Good road access to site • Motorway and rail in Shieli, 70 km from site • Already grid connected, and connecting onto adjacent high voltage power-line in Q2 Corporate Presentation | Q1 2021 13
Slide 14: Existing Production
Existing Production The existing process plant production of V2O5: • Treating secondary materials to extract V2O5 in the form of AMV and molybdenum as molybdenum calcite • Capacity now around 60 tonnes per month V2O5 and growing • Planned to increase capacity in 2021 to 125 tonnes per month with the
Slide 15: Existing process plant
Existing process plant Roasting Ovens Corporate Presentation | Q1 2021 15
Slide 16: Laboratory
Laboratory Ferro - Alloy has a well-equipped laboratory with highly qualified technical staff Technical director Mr A A Fofanov – one of the world’s foremost vanadium specialists Corporate Presentation | Q1 2021 16
Slide 17: Balasausqandiq deposit
Balasausqandiq deposit Corporate Presentation | Q1 2021 17
Slide 18: Balasausqandiq deposit: a unique type of ore
Balasausqandiq deposit: a unique type of ore • The ore at Balasausqandiq is a sedimentary deposit, with high grade of vanadium and negligible iron – a significant advantage • It is not the usual vanadiferous titano-magnetite type of deposit of which there are many but which are high cost to develop
Slide 19: Balasausqandiq – why a huge cost advantage over other producers
Balasausqandiq – why a huge cost advantage over other producers and projects? Crucially not a titano-vanadiferous magnetite deposit WHY THIS MATTERS: • No need for high temperature roasting • Reduces capital and operating costs by around 60% • No need to pre-concentrate ore • Reduces operating costs
Slide 20: Balasausqandiq – Other advantages
Balasausqandiq – Other advantages FAVOURABLE GEOLOGY • Outcrops at surface, open pit, • Very large deposit • Total resource plus exploration potential 126m tonnes (middle of estimated range) • Visible geological cut-off, low stripping ratio EXISTING INFRASTRUCTURE AND TRANSPORT LINKS • Surfaced road
Slide 21: Balasausqandiq – Economics
Balasausqandiq – Economics These cost advantages translate into what is destined to become the world’s lowest cost and most profitable vanadium producer WORLD’S LOWEST COST PRODUCER Balasausqandiq forecast cash cost of production: • $1.54/lb expected (costs apportioned between products) • $(1.20) (n
Slide 22: Development plan
Development plan Corporate Presentation | Q1 2021 22
Slide 23: Development plan
Development plan Expansion of existing operation to Now 1,500 tpa and feasibility study for Ongoing Balasausqandiq Mining and processing 1 Mtpa of ore Phase 1 Production 5,600 tpa Capex (to be funded from existing operations, debt, and $100m strategic partner) Expansion to 4 Mtpa of ore Phase 2 Cape
Slide 24: Appendix
Appendix Corporate Presentation | Q1 2021 24
Slide 25: Kazakhstan
Kazakhstan An attractive operating environment • An upper-middle income country (World Bank) • Smooth transition to a new President in 2019 (World Bank) • 25th (of 191) in ease of doing business (World Bank 2020) • 10% income tax, 20% profits tax • No requirement for government free-carry or local o
Slide 26: Appendix: Valuable by-products
Appendix: Valuable by-products Valuable by-products produced as part of the single processing route Carbon-silica flux Concentrated to make carbon black, used in the manufacture of rubber – a Projected revenue Product per tonne of ore ($/t) $12bn global market, Carbon-silica mix can be briquetted to
Slide 27: Appendix: Board & Management
Appendix: Board & Management Experienced team with proven capability BOARD MANAGEMENT Sir Mick Davis Chairman (designate, to be appointed after the Initial Investment is completed) Alexandar Fofanov Technical Director A highly successful mining executive accredited with building Xstrata plc into Che
Slide 28: Appendix: Straightforward process
Appendix: Straightforward process Process flowsheet tested in 15,000 tpa pilot plant Thickening Autoclave Crushing & De-Carbonisation and Filtration Leaching Absorption Desorption Grinding Circuit Ammonia Precipitation, Ferro Vanadium Metavanadate Crystallisation Dissociation Vanadium Pentoxide (75-
Slide 29: Appendix: Balasausqandiq
Appendix: Balasausqandiq Resources and potential JORC resource based on only one orebody Category Tonnes V2O5 V2O5 Orebody (JORC 2012) (Mt) (%) (tonnes) OB1 Indicated Primary1 21.4 0.67 143,380 OB1 Inferred Oxide2 1.3 0.89 11,570 OB1 Inferred Primary1 1.6 0.67 10,720 Total 24.3 0.68 165,670 OB2-OB5