Slide 1: Emergence of a new world-class copper and gold producer
Emergence of a new world-class copper and gold producer Chris Bateman Chief Financial Officer December 11-12, 2012 New York
Slide 2: Forward-looking statements
Forward-looking statements This presentation includes certain “forward-looking statements.” All statements, other than statements of historical fact, are forward-looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate and a
Slide 3: China continues to drive global demand
China continues to drive global demand Global copper demand is being driven by Supply continues to underperform China against expectations… 2009 2010 2011 YTD 2012 Global refined copper consumption1 kt Cu 30000 China Rest of World 25000 -5% -6% -6% -5% 836kt 20000 961kt 1,006kt 955kt ...as disruptio
Slide 4: Oyu Tolgoi well placed to meet Chinese metals requirements
Oyu Tolgoi well placed to meet Chinese metals requirements 4
Slide 5: World-class asset, experienced operator
World-class asset, experienced operator Near-term and Experienced and High grade and low cost large scale innovative operator • Commercial production in H1 2013 • Ranks in top five copper projects • Track record of developing and by grade operating world-class assets • Multi decade mine life • Expec
Slide 6: Unique pure copper/gold exposure
Unique pure copper/gold exposure Top 15 producing copper mines (2020)(1) $3.00 $2.50 $2.00 2020E C1 Cash Cost ($/lb) $1.50 $1.00 Turquoise Hill Resources/ Oyu Tolgoi(2) $0.50 Bubble size reflects contained copper resources (kt) Independent copper producer and publicly traded Owned by diversified min
Slide 7: Commissioning underway
Commissioning underway Binding power purchase agreement with the Inner Mongolia Power Corporation signed in early November All lines energised and commissioning commenced week of November 12th On track for the start of commercial production in first half of 2013: January 2013: first ore thro
Slide 8: Staged development with attractive growth profile
Staged development with attractive growth profile IDOP production profile 800 1.5 1.2 600 Gold Production (mm oz) Copper Production (kt) 0.9 400 0.6 200 0.3 0 0.0 2013 2014 2015 2016 2017 2018 2019 2020 Copper Production (kt) Gold Production (mm oz) 2013 copper and gold production plan in process,
Slide 9: Well capitalized to fund development
Well capitalized to fund development Equity Successfully completed US$1.8 billion rights offering Financing 99.2% of shares taken up in initial subscription, balance (US$1.8 Bn) taken up in secondary Bridge The bridge facility remains undrawn Loan (US$1.5 Bn) Ensures project development rema
Slide 10: Significant expansion potential and execution flexibility
Significant expansion potential and execution flexibility Potential expansion options 10
Slide 11: Latest sentiment on Investment Agreement
Latest sentiment on Investment Agreement Prime Minister N. Altanhuyag answers questions from ambassadors Prime Minister N.Altanhuyag invited representatives of foreign diplomatic missions in Mongolia. Asked if the new As at the date of this Information Memorandum, the Cabinet is working towards modi
Slide 12: Other assets update
Other assets update SouthGobi Resources (57.6% owned) • Board and management changes completed in Q3 2012 • Exploration and mining licenses in good standing • Improving sustainable cost position Ivanhoe Australia (58.9%(1) owned) • On target to increase ore tonnage to 1.4-1.6 MT in 2013 • Rights off
Slide 13: Conclusion
Conclusion Long-term copper outlook remains positive Commissioning underway, phase one construction nearly completed: on schedule and on budget Commissioning completion in fourth quarter of 2012 with commercial production to commence in first half of 2013 Funding plan progressing well with s
Slide 14: Appendix
Appendix 14
Slide 15: Southern Oyu open-pit mine
Southern Oyu open-pit mine 15
Slide 16: Southern Oyu open-pit mine
Southern Oyu open-pit mine 16
Slide 17: Primary crusher for open-pit ore
Primary crusher for open-pit ore 17
Slide 18: Ore delivered to the coarse-ore storage
Ore delivered to the coarse-ore storage, shafts #1 and #2 in background 18
Slide 19: Stockpiling open-pit ore in the coarse-ore storage building
Stockpiling open-pit ore in the coarse-ore storage building 19
Slide 20: First test run of SAG mill #1
First test run of SAG mill #1 20