American Lithium Corp. · TSXV:LI

American Lithium — Investor Presentation (June 2025)

22 slides from American Lithium's investor presentation, June 2025

  1. Slide 1: One of the Largest Lithium Developers in the Americas

    One of the Largest Lithium Developers in the Americas Corporate Presentation | June 2025 TSX.V: LI OTCQX: AMLIF Frankfurt: 5la1

  2. Slide 2: Disclaimer

    DISCLAIMER THIS MANAGEMENT PRESENTATION (THE "PRESENTATION") WAS PREPARED AS A SUMMARY OVERVIEW ONLY OF THE CURRENT AFFAIRS OF AMERICAN LITHIUM CORP. (“AL” OR “AMERICAN LITHIUM”) AND ITS SUBSIDIARIES, INCLUDING WITHOUT LIMITATION, PLATEAU ENERGY METALS INC. (“PLU”, WITH AL, PLU AND THE OTHER SUBSIDI

  3. Slide 3: Investment Thesis

    INVESTMENT THESIS 1 2 Two of the Largest Largest Undeveloped Lithium Projects in Uranium District in (3) the Americas Latin America Development Stage Projects Value Creation Opportunity Being Advanced & De-Risked to Benefit Shareholders 3 4 Skilled and Well-Established Accomplished Team Community Su

  4. Slide 4: TLC Lithium Project ("TLC")

    TLC LITHIUM PROJECT (“TLC”) Key Dynamics ▪ One of the Largest Lithium Deposits in the US ▪ Large Near-Surface Deposit Sits Above Water Table ▪ 8.56 Mt LCE M&I Resources + 1.44 Mt LCE Inferred ▪ Higher-Grade, Near Surface Results Drive Resource Growth ▪ Located in the Heart of Nevada’s Premier Lithiu

  5. Slide 5: TLC Project Economics

    TLC PROJECT ECONOMICS US$3.26 Billion 27.5% 3.8 Years US$14,617M LOM US$396M Avg Annual LOM NPV(8%)1 IRR, After-Tax1 Payback1 Cash Flow1 After Tax US$7,443 Per US$819M 40 Years Production ~38,000 tpa avg LOM~ Tonne OPEX2 Initial CAPEX3 Mine Life LCE4 1. After-tax, average annual at steady state thro

  6. Slide 6: Nevada Is the Heart of Future US Lithium Production

    NEVADA LITHIUM OUTLOOK NEVADA IS THE HEART OF FUTURE US LITHIUM PRODUCTION #1 ranked mining jurisdiction in the world (1) US Inflation Reduction Act is a game- changer ▪ US government funding and loans to build out the US lithium industry ▪ Tax credits for EV purchases using US sourced lithium Suppo

  7. Slide 7: Falchani Lithium Project

    FALCHANI LITHIUM PROJECT Key Dynamics ▪ One of the Largest Hard-Rock Lithium Deposits Globally ▪ High-Purity, Scalable, Near-Surface Deposit ▪ Advanced Development Stage Project ▪ 5.53 Mt LCE M&I Resources + 3.99 Mt LCE Inferred ▪ Low-Cost and Sustainable Production Profile ▪ Long Mine Life with Str

  8. Slide 8: Falchani Project Economics

    FALCHANI PROJECT ECONOMICS US$5.11 Billion 32.0% 3.0 Years US$644M Avg Annual LOM NPV(8%)1 IRR, After-Tax1 Payback1 Cash Flow1 After Tax US$5,092 Per US$681M 43 Years Production Tonne 23,145 tpa Y1-5 45,084 tpa Y6-10 72,624 tpa Y11-32 OPEX2 Initial CAPEX3 Mine Life LCE4 1. After-tax, average annual

  9. Slide 9: One of the Top 5 Strongest Economies in South America

    PERU MINING OUTLOOK ONE OF THE TOP 5 STRONGEST ECONOMIES IN SOUTH AMERICA (1) Renewed Government Focus on Economic Growth Strong Mining Culture with a Deep-Rooted History ▪ Numerous initiatives supported by Government Expedited Permitting Process for Non-Metals ▪ Plans to expedite mine permitting fo

  10. Slide 10: Quelcaya Discovery: A New Lithium District Emerges

    QUELCAYA DISCOVERY: A NEW LITHIUM DISTRICT EMERGES Project Features ▪ Potential for new lithium district ▪ Located 5 km west of Falchani ▪ Maiden drill program in 2023 intersected thick mineralized zones of lithium, grading as high as 2,668 ppm Li ▪ Highlights for discovery hole mineral thicknesses

  11. Slide 11: Macusani Uranium Project

    MACUSANI URANIUM PROJECT Project Features ▪ Largest Uranium deposit in South America and one of the largest undeveloped globally ▪ NPV of $603 M with 51.9 Mlbs of U3O8 Indicated & 72.1 Mlbs Inferred(1) ▪ Near surface deposit, low strip, rapid leach ▪ Ability to increase the head-grade via pre-concen

  12. Slide 12: Macusani Economics

    MACUSANI ECONOMICS Location and Mineral Resource Project Outlook Strong Project Economics1, 2 ▪ NPV8: US$603M, IRR 40.6% and 1.8 years payback at US$50/lb U₃O₈ ▪ Large Scale: Avg. production ~6Mlbs U₃O₈ / yr over a 10-year mine life ▪ PEA Mine Plan Resource: ~68.8Mlbs U₃O₈ at 289ppm (55% of existing

  13. Slide 13: Board & Management

    BOARD & MANAGEMENT Board of Directors Andrew Bowering GA Ben Binninger Alex Tsakumis Dr. Laurence Stefan Claudia Tornquist Rona Sellers Chairman & Director Lead Independent Interim CEO & Director COO & Director Independent Director Independent Director Director, MBA & B. Eng MBA & M. Eng Management

  14. Slide 14: Market Capitalization

    MARKET CAPITALIZATION Share Structure(4) Notable Shareholders Analyst Coverage TSXV: LI Stock Exchange / Symbol OTCQX: AMLIF BMO Asset Management Share Price C$0.35 Commodity Capital Basic Shares Outstanding ~220.4 M Funds Avenue S.A Options Outstanding(5) 9.9 M Globe X Management Oliver O’Donnell R

  15. Slide 15: Environmental, Social, Governance (ESG)

    ENVIRONMENTAL, SOCIAL, GOVERNANCE (ESG) Environment Initiatives Include: ▪ Sustainable business models ▪ Projects involve minimal long-term land disturbance ▪ No endangered animals and plants on our lands, studies show ▪ All our projects are above the water table ▪ Private water rights secured Socia

  16. Slide 16: Project Development Path

    PROJECT DEVELOPMENT PATH High-grade, near-surface Provides update on the Updated Mineral results expand mineralization Highest grades of optimization of the Resource Peruvian Superior at TLC, Nevada Falchani processing Lithium and Cesium Estimate (“MRE”) Court unanimously December 8th, 2023 flow-she

  17. Slide 17: Strong Fundamentals Going Forward

    STRONG FUNDAMENTALS GOING FORWARD World-Class Lithium Assets Two of the Largest Development Stage Lithium Projects Strategically Located Tier 1 Mining Jurisdictions With Infrastructure and Strong Community Support Proven Management Team Advancing Projects Lithium Poised For Price Recovery Government

  18. Slide 18: Appendix

    APPENDIX

  19. Slide 19: Project Resources

    PROJECT RESOURCES TLC Lithium Project(1) 500ppm Cut-Off1 Tonnes Grade Contained (Mt) (ppm Li) (Li MT) (Li2CO3 MT) Measured1 1,365 849 1.16 6.17 Indicated1 553 808 0.45 2.39 M&I1 1,918 839 1.61 8.56 Inferred1 345 780 0.27 1.44 Falchani Lithium Project(2) 600ppm Cut-Off2 Tonnes Grade Contained (Mt) (p

  20. Slide 20: TLC Flow Sheet to Yield High Purity Lithium Carbonate

    TLC FLOW SHEET TO YIELD HIGH PURITY LITHIUM CARBONATE Processing Highlights Step 2 Step 4 Ore Preparation Impurity Removal Through ▪ Lithium carbonate can be - Crushing & Milling Neutralization, Evaporation & economically upgraded to battery- - Gravity Separation/Upgrading Softening grade carbonate

  21. Slide 21: Conventional Mining Flowsheet Yields High Purity Lithium Carbonate

    CONVENTIONAL MINING FLOWSHEET YIELDS HIGH PURITY LITHIUM CARBONATE Processing Highlights Step 4 ▪ Conventional sulfuric acid tank leaching Impurity Removal Through Neutralization, and Softening - Waste: Iron, Aluminium, Magnesium, Calcium Salts ▪ Battery grade LCE produced, no additional refining/up

  22. Slide 22: Ensuring a Sustainable America

    ENSURING A SUSTAINABLE AMERICA TSX.V: LI | OTCQX: AMLIF | Frankfurt: 5LA1 710-1030 W Georgia St, Vancouver, BC 604-428-6128 info@americanlithiumcorp.com Follow Us On www.americanlithiumcorp.com

American Lithium — Investor Presentation (June 2025) on 6ix