Slide 1: Advancing Brownfield Critical Metals Projects in the USA and Norway into Production
TSXV: MOON | OTCQX: BMOOF Advancing Brownfield Critical Metals Projects in the USA and Norway into Production April 2025 1
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation (together with any accompanying oral or written communications, this Forward-looking information is provided herein for the purpose of giving information about the Transactions "Presentation") prepared by Blue Moon is confidential and is being provided to
Slide 3: A New Base Metals Miner Builder and Operator
A New Base Metals Miner Builder and Operator Nussir SHCD – Construction Stage -PERMITTED- Tier 1 Jurisdictions – Norway and the USA are ‘doubling down’ on critical metals mining Permits in Hand – All 3 projects have permits for underground development, with Nussir fully permitted Blue Moon VMS –
Slide 4: Management and Board
Management and Board CHRISTIAN KARGL-SIMARD, P. ENG. SKOTT MEALER FRANCES KWONG, CPA THEODORE VELIGRAKIS President, CEO & Director President and COO CFO & Corporate Secretary VP EXPLORATION Founder and CEO of Adventus Mining which was +20 years of experience in project development Former VP Finance,
Slide 5: Pro Forma Capital Structure & Shareholders
Pro Forma Capital Structure & Shareholders WG - Norway Institutional PRO-FORMA CAP STRUCTURE LNS 8% 2% Insiders ~51.1M S/O 11% (US$M) 5% MARKET CAPITALIZATION (AS AT APRIL 21, 2025; C$4.10/SH) $153 Monial 15% CURRENT CASH $15 EQUITIES $1 Retail 34% DEBT 0 Baker Steel 11% ENTERPRISE VALUE $138 Hartre
Slide 6: Nussir Overview
Nussir Overview Nussir consists of 100%- Description of Nussir owned Nussir and Ulveryggen deposits with Ownership • 93.55% Nussir ASA processing at the brownfield Property • Located in Hammerfest municipality, Norway Øyen industrial site and all Hammerfest key infrastructure in place Mining • Under
Slide 7: Nussir District Potential
Nussir District Potential Nussir New Mine 10 km long sediment hosted Cu-Ag-Au deposit ‘Western Zone’ Copper oxide showings, but untested Ulveryggen Old Pits 4x shear hosted open pits Source: See note 1 page 2. TSXV: MOON | OTCQX: BMOOF 7
Slide 8: Nussir Orebody Potential To Be Expanded Significantly
Nussir Orebody Potential To Be Expanded Significantly 10 km along strike Proposed Decline NUS-DD-14-004 NUS-DD-14-003C 9.9 m – 0.5%, 1.2/0.2, 0.6% NUS-DD-14-005 3.4 m – 3.1%, 0.5/0.1, 3.2% NUS-DD-14-002 9.6 m – 0.9%, 6/0.2, 1.12% 3.8 m – 0.85%, 4.4/0.1, 1.0% NUS-DD-14-001 9.7 m – 0.93%, 11.5/2.2, 1.
Slide 9: Underground Drilling is Expected To Better Define High Grade Zones
Underground Drilling is Expected To Better Define High Grade Zones • Goal is to tighten drill spacing in higher grade zones through drilling from underground, which will build a more robust mine plan DH Length Cu (%) Ag PGE CuEq (left to right) (m) (gpt) (gpt) (%) 15-028 6.3 1.16 26.7 0.39 1.65 96-0
Slide 10: Nussir Parallel Zone
Nussir Parallel Zone Zones of secondary mineralization have been identified Faults may explain the doubling of orebody Secondary ore zone seen in 25% of the strike length, but no dedicated drill program has been completed to test the theory over the full 10 km strike or to develop a resource S
Slide 11: Nussir Shear Hosted Open Pits – Open at Depth
Nussir Shear Hosted Open Pits – Open at Depth 1972-1979 3.1 Mt of Cu ore produced at 0.66% Cu + Mill and port credits in 4 small area pits Historical pits 2.5 km tunnel from port to underneath 4 open pits accessible for mining and drilling Source: See note 1 page 2. 11
Slide 12: 12-18 Month Objectives for Nussir with Equity Proceeds
12-18 Month Objectives for Nussir with Equity Proceeds De-risk operations – Ultimate Plan to Double Production Drive decline into heart of the orebody (potential to reduce ultimate time to production by ~1 year) Optimize mining to determine final mining method, dilution and costs Confirm if op
Slide 13: Blue Moon Overview
Blue Moon Overview Description of Blue Moon Ownership • 100% Blue Moon • Located in Mariposa County, California Property • Republican county • Only a US$500k capped third party royalty • Underground; long hole stoping Mining • Paste backfill and dry stack tailings • Designed as a zero discharge faci
Slide 14: Blue Moon Preliminary Economic Assessment
Blue Moon Preliminary Economic Assessment March 2025 Maiden NI 43-101 PEA and Updated Resource Estimate on the Blue Moon Project (By Micon International Ltd. and Resource Development Associates) PEA Base Case -10% +10% Long-term Consensus Spot Prices Pricing Pricing Price Forecast(3) (Feb. 2025 avg.
Slide 15: NSG Overview
NSG Overview Description of NSG Ownership • 100% ownership of all the prospective exploration licenses in the historic mining district • Located in Northern Norway on border with Sweden • Mine shutdown in 1991 after producing since 1887 and being one of Norway’s most important copper mines. HISTORIC
Slide 16: NSG – High Grade Potential
NSG – High Grade Potential NI 43-101 Inferred Resource Grade –Tonnage Curve Grades to start with in major sprawling VMS complex (3 orebodies) – not including sulfur, gold and silver credits (as unassayed). Intercepts are not true widths RD Zone SM Zone • Hole 1 – 3 m – 4.42% Cu & 0.25% Zn • Hole 36
Slide 17: Next Steps
Next Steps Prepare for Advancing a New Company into Construction • Build strong shareholder base backing new base metals company focused on critical metals in overlooked Tier 1 jurisdictions • Build exploration and development teams led by a core team. 10,000 m of drilling expected on each of the 3
Slide 18: Company Contact
Company Contact Christian Kargl-Simard President, CEO & Director Phone | +1 (416)-230-3440 christian@bluemoonmetals.com TSXV: MOON | OTCQX: BMOOF