Synergy Green Industries Ltd. · NSE:SGIL

Synergy Green Industries — Q3 FY2025 Earnings Presentation

23 slides from Synergy Green Industries's earnings presentation, Feb 7, 2025

  1. Slide 1: Intimation of investor presentation and analyst conference call

    February 07, 2025 To, To, The BSE Limited, Corporate Communications, Corporate Relationship Department, National Stock Exchange of India Ltd., 1st Floor New Trading Building, Exchange Plaza, Plot No.C/1, G Block, Rotunda Building, Bandra-Kurla Complex, Bandra (E), P.J. Towers, Dalal Street, Mumbai –

  2. Slide 2: Cover letter continued: no UPSI to be shared

    No Unpublished Price Sensitive Information (UPSI) will be shared during the aforesaid conference. The schedule of the above Investors conference is subject to change which may happen due to exigencies on the part of Investor / Company. This is for your information and record. Thanking you, Yours fai

  3. Slide 3: Investor Presentation Q3 FY 2025

    Investor Presentation Q3 FY 2025 Copyright © 2024 Synergy Green Industries Ltd 2024 1

  4. Slide 4: Disclaimer

    Disclaimer This presentation has been prepared by Synergy Green Industries Ltd (SGIL) solely for informational purposes. The information contained herein does not constitute or form part of any offer or invitation to sell, or any solicitation of an offer to purchase or subscribe for, any securities

  5. Slide 5: Industry Overview, Company Profile, Business Performance

    01 Industry Overview 02 Company Profile 03 Business Performance Copyright © 2024 Synergy Green Industries Ltd 2024 3

  6. Slide 6: Climate Change is not the future but PRESENT

    Climate Change is not the future but PRESENT… FLOOD HEATWAVE CYCLONE DROUGHT …14.5 Millions deaths by 2050 (Equivalent to World War) Copyright © 2024 Synergy Green Industries Ltd 2024 4

  7. Slide 7: Energy transition to Renewables

    Energy transition to Renewables Global $112 Tn Energy Economy (by 2025) Share 7% Renewable Growth Drivers World Electricity Generation by Power Sources (1980-2050) 70 • Fights against climate Change 70% Units: PWh/yr 60 50 50% • Competitive Energy Cost over 40 25% Conventional fuels 16% 30 20 • Ener

  8. Slide 8: India Panchamrit at COP26: The World is betting on Renewables

    The World is betting on Renewables INDIA “PANCHAMRIT” at COP26 GLOBAL Net zero Paris Agreement India net zero Country-wise goals of Goal of keeping global Achieve net zero by reaching net zero emissions warming within 1.5°C 2070 Climate finance India renewables target Country emissions goal Goal of

  9. Slide 9: India and Global Wind Installations

    India and Global Wind Installations India Wind Installations Global Wind Installations Units: GW Units: GW Onshore Onshore India installations in 2024: Offshore 3.42 GW 182 171 India and Global wind installations 159 37 148 31 have grown over 50% during 2023 50% 131 29 24 116.6 18 71% 10.8 95.3 93.6

  10. Slide 10: We are diversified to cater to broader castings market

    We are diversified to cater to broader castings market Country wise Total Castings Demand Sector wise Major Consumers of Castings Others 48.79 Total demand: 110 Mn MT 10% Power Auto 5% Railways 32% 6% 27.86 Pipes & Fittings 8% 11.49 10.78 5.23 4.95 6% Industrial M/c 6% Agricultural Electrical Equip

  11. Slide 11: Company Profile

    01 Industry Overview 02 Company Profile 03 Business Performance Copyright © 2024 Synergy Green Industries Ltd 2024 9

  12. Slide 12: Brief overview

    Brief overview SGIL is one of India’s leading manufacturers of large-size critical castings for wind and general engineering products. Product Profile – • Weight Range: 3 MT to 30 MT • Materials: SG Iron, Cast Iron and Steel • Capacity: 30,000 TPA (45,000 TPA in Progress) Copyright © 2024 Synergy Gr

  13. Slide 13: We have state of the art facilities

    We have state of the art facilities FACILITIES SOFTWARE QUALITY All the Equipment from leading Best in Class IT NABL Certified Quality Quality Certifications Brands in the world Testing facilities ATAS Production Line Simulation ISO 9001 ISO 14001 ISO 18001 T PG C er ti fi c ati on ISO 27001 ISO 500

  14. Slide 14: Our Products

    Our Products Wind Castings Non-Wind Castings Wind Castings (70%) + Gear Box Castings (15%) Rotor Hub Main Frame Gear Box PLC Mining Plastic Injection Pumps Machines Copyright © 2024 Synergy Green Industries Ltd 2024 12

  15. Slide 15: Our Customers

    Our Customers 50% of Top 10 Global wind OEMs are our customers Leading Wind OEMs in 2023 Our Customers Goldwind 16.4 Envision 15.4 Vestas 13.4 Windey 10.4 Wind Mingyang 9 GE 8.1 Sany 7.9 Siemens Gamesa 7.7 Nordex 6.7 Onshore Dongfang 6.0 Offshore Clients Onboarding In Progress Clients Onboarded Non

  16. Slide 16: SWOT Analysis

    SWOT Analysis STRENGTH WEAKNESS • Ability to Produce large castings up to 30 MT • Limited Capacity compared to peers (scaling up • Established products with Top Global OEMs from 30,000 TPA to 45,000 TPA) • Efficient Foundry and achieved revenue • Currently 100% machining is outsourced S W growth in

  17. Slide 17: Business Performance

    01 Industry Overview 02 Company Profile 03 Business Performance Copyright © 2024 Synergy Green Industries Ltd 2024 15

  18. Slide 18: Summary of unaudited financial results 9M FY25

    Summary of unaudited financial results 9M FY25 All figures in Rs Crore Particulars Quarter Ended (3 Months) 9M Ended (9 Months) FY 2023-24 Period 31.12.24 30.09.24 31.12.23 31.12.24 30.12.23 (12 Months) 10.5% 8.6% Total Income 97.84 89.01 88.54 265.77 244.81 328.13 Profit before Depreciation, 45.4%

  19. Slide 19: Brief overview of financials

    Brief overview of financials Revenue streams (in Rs Cr) and Estimate PBDIT over the period (in Rs Cr) Executable Orderbook Projection 26% 41.1 450 38.39 370 15.66 328 30.47 10.5% 26.8 17.32 285 290 25.2 25.3 0.69 73 266 11.62 42 57 245 5.25 3.14 200 31 33 47 Are 42 26 50 14.08 13.35 34 39 15 29 33 1

  20. Slide 20: Cost structure and CAPEX plans

    Cost structure and CAPEX plans Capex and margin expansion plan ~Rs 197 Cr Area CAPEX Target Foundry Capacity expansion Rs. 60 Crore 30,000 to 45,000 MT Completion: Q1 FY 26 Captive renewable power Increase from 2 MW to 10 Rs. 30 Crore MW solar project Completion: Q4 FY 25 In-house machining* In-hous

  21. Slide 21: Initiatives to triple bottom line (Planet, People, Profit)

    Initiatives to triple bottom line (Planet, People, Profit) Carbon Footprint (Renewables) Technology Leadership Reduce carbon footprint through Process Automation renewables and achieve 50% green & Digitization production by 2030 Waste Management Energy Optimization • 14 MW Dedicated Express • Therma

  22. Slide 22: The Path Ahead

    The Path Ahead FY 2024-25 Performance Outlook Medium Term Capacities (MT/Annum) 100,000 ~13% projected revenue growth for the year, based on present order book status 75,000 45,000 Export revenue estimated to grow to 30,000 25% as against 11.5% in previous year 15,000 Presently Raw material prices a

  23. Slide 23: Copyright © 2024 Synergy Green Industries Ltd 2024

    Copyright © 2024 Synergy Green Industries Ltd 2024 21

Synergy Green Industries — Q3 FY2025 Earnings Presentation on 6ix