Centerra Gold Inc. · TSX:CG

Centerra Gold — Investor Presentation (May 2025)

61 slides from Centerra Gold's investor presentation, May 2025

  1. Slide 1: Building a Strong Platform for Future Growth

    TSX CG NYSE CGAU BUILDING A STRONG PLATFORM FOR FUTURE GROWTH Investor Presentation MAY 2025

  2. Slide 2: Cautionary Statement on Forward Looking Information

    Cautionary Statement on Forward Looking Information All statements, other than statements of historical fact contained or incorporated by reference in this document, which address events, results, outcomes or developments that the Company expects to occur are, or may be deemed to be, forward-looking

  3. Slide 3: Use of Non-GAAP and Other Specified Financial Measures

    Use of Non-GAAP and Other Specified Financial Measures This document contains “specified financial measures” within the meaning of NI 52-112, specifically the non-GAAP financial measures, non-GAAP ratios and supplementary financial measures described below. Management believes that the use of these

  4. Slide 4: Building a Strong Platform for Future Growth

    Building a Strong Platform for Future Growth CONSOLIDATED 2025 GUIDANCE KEMESS PROJECT | BC, CANADA MOUNT MILLIGAN MINE | BC, CANADA Production: 270 – 310Koz Au; 50 – 60Mlbs Cu 2025 Guidance Gold production costs: $1,100 – $1,200/oz 165 – 185Koz Au and 50 – 60Mlbs Cu AISC(1,2): $1,400 – $1,500/oz MO

  5. Slide 5: Compelling Value Proposition

    Compelling Value Proposition Robust balance sheet, attractive jurisdictions, polymetallic exposure, with a technical management team Competitive Cost Peer-Leading Favourable Polymetallic Technical Structure Balance Sheet Jurisdictions Exposure Management Team Q1 2025 AISC(1,2) of No debt, $608M of c

  6. Slide 6: Centerra’s Strategic Plan

    Centerra’s Strategic Plan Additional agreement with Royal Gold extends mine MOUNT life and establishes favourable parameters for MILLIGAN potential future mine life extensions MINE Prefeasibility Study expected in Q3 2025 Updated life of mine demonstrates steady gold production continuing throughout

  7. Slide 7: Successes: Executing on Centerra’s Strategic Plan

    Successes: Executing on Centerra’s Strategic Plan ÖKSÜT MINE MOUNT MILLIGAN US MOLYBDENUM OPERATIONS JUNE 2023 FEBRUARY 2024 SEPTEMBER 2024 Generated over $520 million of Additional agreement with Royal Gold Announced the restart of free cash flow(1) since restarting sets favorable terms for potenti

  8. Slide 8: Strong Balance Sheet

    Strong Balance Sheet Centerra has no debt, $608M of Centerra’s dividend yield is Centerra’s balance sheet strength cash, and $1.0B of total among the highest in the peer stands out among its peers liquidity(1) group NET CASH (US$B) NET DEBT / 2025E EBITDA DIVIDEND YIELD (%) DPM $0.6 Equinox 1.2x Cen

  9. Slide 9: Capital Allocation Strategy

    Capital Allocation Strategy Create shareholder value with a focus Shareholder Opportunities to on responsibly returns grow the business preserving and organically Dividends and deploying the share buybacks Pillars of the Invest in internal balance sheet projects and capital allocation exploration st

  10. Slide 10: Upcoming Value Drivers

    Upcoming Value Drivers Q3 2025: Prefeasibility Study MOUNT 2025: Site-wide optimization program focused on MILLIGAN OH&S, productivity and cost efficiency opportunities MINE Ongoing: Investment in exploration drilling program Ongoing: Consistent operating ÖKSÜT MINE performance as the mine remains a

  11. Slide 11: 2025 Exploration Strategy

    2025 Exploration Strategy Investing in exploration for future growth $25-30M $15-20M Brownfields Exploration Greenfield and Generative Exploration Programs Mount Milligan (British Columbia) Canada • Drilling to upgrade inferred resource between • British Columbia – JV project QCM Goldmark and North

  12. Slide 12: Exploration Equity Investments

    Exploration Equity Investments Build a portfolio of equity investments to complement our internal exploration programs THESIS GOLD INC. (TSX-V: TAU) KENORLAND MINERALS (TSX-V: KLD) Equity investment for 9.9% of the outstanding shares Exploration company focused in Quebec and Ontario Thesis is advanc

  13. Slide 13: Sustainability Highlights

    Sustainability Highlights Our Vision is to build a team-based culture of excellence that responsibly delivers sustainable value and growth. ENVIRONMENTAL SOCIAL GOVERNANCE The Mount Milligan Environment Team and The number of reportable incidents Remain in conformance of the World partners at Chu Ch

  14. Slide 14: Mount Milligan Mine | BC, Canada

    Mount Milligan Mine | BC, Canada ASSET DETAILS Central British Columbia, Canada 100% owned 2036 Conventional open pit copper and gold mine; 60ktpd copper flotation plant 35% gold stream, and MINE LIFE Commercial production achieved in February 2014 155km NW of Prince George (Reserves only) 18.75% co

  15. Slide 15: Mount Milligan Prefeasibility Study

    Mount Milligan Prefeasibility Study PFS to evaluate the substantial resource with a goal to unlock value beyond the current mine life PREFEASIBILITY STUDY (“PFS”) POTENTIAL FUTURE MINE LIFE EXTENSIONS The study is expected to evaluate: In February 2024, Centerra announced a mutually beneficial, addi

  16. Slide 16: Exploration Drilling at Mount Milligan

    Exploration Drilling at Mount Milligan Exploration drilling program aimed at potentially significantly expanding the mineral resource base MOUNT MILLIGAN EXPLORATION PROGRAM 2025 exploration spending guidance at Mount Milligan: $9 - $12 million. A total of 45 km of drilling is planned for 2025. Cont

  17. Slide 17: Mount Milligan Mineralization Cross Sections

    Mount Milligan Mineralization Cross Sections Actively studying 2025 Infill drilling the longer-term focused potential on red circled at Mount Milligan to unlock additional value beyond 2035 areas WEST – EAST A A' MINERALIZED CORRIDOR B B' SOUTHWEST – NORTHEAST MINERALIZED CORRIDOR 17

  18. Slide 18: Mount Milligan Site Optimization Program

    Mount Milligan Site Optimization Program Site-wide optimization program with a focus on enhanced safety performance and cash flow improvement COMPREHENSIVE SITE OPTIMIZATION PROGRAM Starting in Q4 2023, Centerra has focused on looking at all aspects of the operation to maximize the potential of the

  19. Slide 19: Mount Milligan Site Optimization: Notable Achievements

    Mount Milligan Site Optimization: Notable Achievements Continue to progress site-wide optimization program, implementing tangible improvements in key areas OCCUPATIONAL HEALTH & SAFETY MINE PLANT Improved safety performance Improved mine performance focused on Increased mill throughout per operating

  20. Slide 20: Highlights of Additional Royal Gold Agreement

    Highlights of Additional Royal Gold Agreement(1) Additional agreement with Royal Gold unlocks incremental mineral reserves & resources at Mount Milligan TRANSACTION HIGHLIGHTS Gold and Copper Payments Received from Royal Gold(3) Centerra will receive increased cash payments for Mount Gold Copper Mil

  21. Slide 21: Öksüt Mine | Türkiye

    Öksüt Mine | Türkiye DETAILS ON OPERATION Kayseri Province, 100% owned 2029 Open pit heap leach gold mine operation Türkiye Sliding scale NSR MINE LIFE Commercial production achieved in May 2020 295km SE of Ankara royalty to Turkish (Reserves only) Government 2024 OPERATIONAL PERFORMANCE Gold produc

  22. Slide 22: Molybdenum Business Unit

    Molybdenum Business Unit US Molybdenum Operations ENDAKO THOMPSON CREEK MINE MINE THOMPSON CREEK LANGELOTH Located in Idaho, among the largest open-pit primary moly mines in the world MINE METALLURGICAL FACILITY 75% Has an existing open pit, on-site mill, established site facilities and equipment fl

  23. Slide 23: US Molybdenum Operations Strategy

    US Molybdenum Operations Strategy Unlock significant value through the restart of Thompson Creek Mine and a progressive ramp-up of production at Langeloth. Combined value of $472M after-tax NPV8% and 22% IRR based on $20/lb Mo price ROBUST INTEGRATED ECONOMICS(2) THOMPSON CREEK FEASIBILITY STUDY(5)

  24. Slide 24: Thompson Creek: De-risked Capital Project

    Thompson Creek: De-risked Capital Project With infrastructure already in place, Thompson Creek initial capital investment is largely de-risked DE-RISKED CAPITAL PROJECT Capital investment is largely de-risked due to an existing pit, significantly advanced equipment rebuilds and equipment purchases a

  25. Slide 25: Thompson Creek Restart: Q1 2025 Highlights

    Thompson Creek Restart: Q1 2025 Highlights Thompson Creek restart activities continued to progress in Q1 2025 THOMPSON CREEK RESTART HIGHLIGHTS Capital Expenditures Q1 2025 Non-sustaining capital expenditures(1): $26 million Since the restart decision in September 2024, non- sustaining capital expen

  26. Slide 26: Metallurgical Facilities Market

    Metallurgical Facilities Market Langeloth is a strategic asset given its proximity to North American steel manufacturers LANGELOTH IS A UNIQUE AND STRATEGIC ASSET Given proximity to North American steel manufacturers, the business is important for the area Part of “made in America” story for re-onsh

  27. Slide 27: Langeloth Attractive Economics

    Langeloth Attractive Economics At full capacity, Langeloth is expected to generate approximately $50 million EBITDA(1) per year ROBUST INTEGRATED ECONOMICS Path to ~$50M EBITDA(1) per year ILLUSTRATIVE Strong economics due to synergies with the high-quality concentrate Historical blend that could be

  28. Slide 28: Langeloth Value Drivers: Capacity Utilization

    Langeloth Value Drivers: Capacity Utilization Actively studying Demonstrated the to ability longer-term potential increase Mo at capacity roasting Mount Milligan to unlock additional in a straightforward manner value beyond 2035 HISTORICAL PRODUCTION VOLUME PATH TO INCREASING CAPACITY AT LANGELOTH U

  29. Slide 29: Langeloth Value Drivers: Vertical Integration

    Langeloth Value Drivers: Vertical Integration Vertical integration allows Langeloth to increase capacity utilization and realize synergies VERTICALLY INTEGRATED US MOLY OPERATIONS LANGELOTH SYNERGIES WITH THOMPSON CREEK Thompson Creek – a primary molybdenum mine – produces high 1 Increased capacity

  30. Slide 30: Kemess Project | BC, Canada

    Kemess Project | BC, Canada ASSET DETAILS North Central British Columbia, 100% Acquired in Substantial gold and copper resources in the highly prospective Toodoggone Canada owned 2018 mining district in north-central British Columbia 430km NW of Prince George 100% silver royalty Significant existing

  31. Slide 31: Kemess Mineralization Cross Section

    Kemess Mineralization Cross Section Centerra has increased 2025 exploration guidance at Kemess to between $10 and $12 million, up from $4 to $6 million previously, with a total of 28,500 meters of drilling planned, encouraged by strong results 31

  32. Slide 32: Kemess Existing Infrastructure

    Kemess Existing Infrastructure Kemess has significant infrastructure already in place, which creates an opportunity for potentially lower execution risk for the project compared with a typical greenfield project of this scale Site Infrastructure Water Treatment Plant Processing Plant Kemess Camp 32

  33. Slide 33: Kemess Preliminary Economic Assessment

    Kemess Preliminary Economic Assessment Centerra is moving forward with a PEA on the Kemess project, using an open pit and underground operation with longhole open stoping, which is expected to be completed by end of 2025 KEMESS STUDY PLAN Preliminary Economic Assessment for Kemess is expected to be

  34. Slide 34: Goldfield Project | Nevada, USA

    Goldfield Project | Nevada, USA ACQUISITION Acquired in Esmeralda County, 100% Large land package located in a prolific mining district which has historically Nevada Owned(1) 2022 produced over 4 million ounces of gold 30km south of Tonopah PROJECT DETAILS Initial measured and indicated gold mineral

  35. Slide 35: Appendix

    APPENDIX

  36. Slide 36: Capital Markets Information

    Capital Markets Information SHARE PRICE PERFORMANCE 90% 80% 70% 60% Price Return (%) 50% 40% 30% 20% 10% 0% -10% -20% May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 Centerra Peer Average S&P/TSX Global Gold Source: S&P Capital IQ Capital Structure(1) Top Sharehol

  37. Slide 37: Leadership Team

    Leadership Team Paul Tomory David Hendriks Ryan Snyder President and Chief Executive Vice President Executive Vice President Executive Officer and Chief Operating Officer and Chief Financial Officer Joined Centerra in May 2023. Joined Centerra in April 2025. Joined Centerra in 2022 as Vice President

  38. Slide 38: Board of Directors

    Board of Directors Michael S. Parrett Karen David-Green Wendy Kei Nancy Lipson Chair and Director Director Director Director Has been a director of Centerra since May 2014. Has been a director since May 2025. Has been a director since May 2022. Has been a director since May 2025. Appointed Chair in

  39. Slide 39: Molybdenum: What Is It, How Is It Used?

    Molybdenum: What Is It, How Is It Used? Molybdenum (Mo) is mainly a by-product of copper mining, with primary molybdenum mines like Centerra’s Thompson Creek mine yielding high-grade concentrate Concentrates are blended to meet metallurgical or chemical grade specifications and roasted Can be furthe

  40. Slide 40: Molybdenum Demand: Steadily Growing

    Molybdenum Demand: Steadily Growing Forecasted steady demand growth of 2% per year on par with historical demand growth from 1995-2023(1) MINERALS WITH RELEVANT DEMAND FOR MOLYBDENUM LOW-CARBON TECHNOLOGIES(3) MOLYBDENUM IS A CRITICAL IN STEEL IS GROWING COMPONENT FOR GREEN ENERGY Energy Storage Car

  41. Slide 41: Molybdenum Supply: Potential Challenges Ahead

    Molybdenum Supply: Potential Challenges Ahead Thompson Creek is a unique opportunity for Centerra to have a captive source of high-quality feed, which is becoming increasingly scarce and competitive to source Molybdenum by-product production from existing copper mines, particularly in South Molybden

  42. Slide 42: Molybdenum Price: Strong Fundamentals

    Molybdenum Price: Strong Fundamentals Centerra’s molybdenum price forecast of $20/lb is supported by: (1) persistent forecasted supply deficit and (2) sustained robust commodity price performance MOLYBDENUM SUPPLY-DEMAND FORECAST(1) HISTORICAL MOLYBDENUM PRICE(2) Average Mo Prices ($/lb) 2025 YTD: 2

  43. Slide 43: Thompson Creek Mine Feasibility Study

    Thompson Creek Mine Feasibility Study A restart of Thompson Creek Mine is expected to result in a $185M after-tax NPV8% and 15% IRR based on $20/lb molybdenum price FEASIBILITY STUDY PRODUCTION PROFILE(1) CAPITAL EXPENDITURES Total Mined (M tons) Molybdenum Production (Mlb) Grade of Ore Processed (%

  44. Slide 44: Molybdenum Value Chain

    Molybdenum Value Chain MOLYBDENUM SUPPLY MOLYBDENUM ROASTING MOLYBDENUM DEMAND Metallurgical Technical grade customers Mo oxide Chemical customers Mo Blend & Chemical grade Mo & by- Mining Processing concentrate roast Mo oxide products Global Mo markets Miners and concentrate producers Global Mo con

  45. Slide 45: Langeloth Metallurgical Facility

    Langeloth Metallurgical Facility Langeloth has the potential to be ramped up to full capacity in a straightforward manner Roaster cleaning Ferromolybdenum production Roaster feed stock Finished products storage 45

  46. Slide 46: Langeloth Commercial Model

    Langeloth Commercial Model Langeloth dampens the volatility in the molybdenum market and remains profitable at lower Mo prices REVIEW OF COMMERCIAL MODEL AT LANGELOTH Langeloth pricing mechanism ILLUSTRATIVE Source concentrate (third-party offtake plus Thompson Creek Spread supply), process concentr

  47. Slide 47: 2025 Production & Cost Guidance

    2025 Production & Cost Guidance 2025 Production Guidance (Koz) Q1 2025 2025 Guidance Consolidated Gold Production 59 270 – 310 Mount Milligan(1,2,3) 36 165 – 185 Öksüt(2) 23 105 – 125 Total Copper Production(1,2,3) (Mlb) 12 50 – 60 2025 Cost Guidance(3) ($/oz) Q1 2025 2025 Guidance Consolidated Gold

  48. Slide 48: 2025 Capital Expenditures and Other Guidance

    2025 Capital Expenditures and Other Guidance 2025 Capital Expenditures Guidance ($M) Q1 2025 2025 Guidance Consolidated Additions to PP&E(2) 68.1 237 – 280 Mount Milligan 23.7 75 – 90 Öksüt 11.9 30 – 40 Thompson Creek 32.3 130 – 145 Consolidated Sustaining Capital Expenditures(1, 4) 18.0 97 – 119 Mo

  49. Slide 49: 2025 Exploration and Other Guidance

    2025 Exploration and Other Guidance Global Exploration Costs ($M) Q1 2025 2025 Guidance Total Exploration Costs(3) 9.0 40 – 50 Brownfield Exploration(3) 5.4 25 – 30 Greenfield and Generative Exploration 3.6 15 – 20 Other Costs ($M) Q1 2025 2025 Guidance Kemess Project Care & Maintenance 3.1 13 – 15

  50. Slide 50: Consolidated Financial & Operating Highlights

    Consolidated Financial & Operating Highlights Financial Highlights ($M, except as noted) Q1 2025 2024 2023 2022 Revenue 299.5 1,214.5 1,094.9 850.2 Production costs 198.9 710.3 706.0 574.6 Gold production costs ($/oz) 1,271 913 733 681 All-in sustaining costs on a by-product basis(1) ($/oz) 1,491 1,

  51. Slide 51: Mount Milligan Financial & Operating Highlights

    Mount Milligan Financial & Operating Highlights Financial Highlights ($M, except as noted) Q1 2025 2024 2023 2022 Gold revenue 86.5 299.8 218.2 248.6 Total revenue 135.2 495.8 407.3 472.5 Production costs 77.8 306.3 303.4 269.0 Gold production costs ($/oz) 1,384 1,105 1,088 767 All-in sustaining cos

  52. Slide 52: Öksüt Financial & Operating Highlights

    Öksüt Financial & Operating Highlights Financial Highlights ($M, except as noted) Q1 2025 2024 2023 2022 Revenue 69.6 465.7 380.9 101.6 Production costs(1) 27.0 148.0 89.6 21.1 Gold production costs ($/oz) 1,102 748 457 386 All-in sustaining costs on a by-product basis(2) ($/oz) 1,563 1,015 675 791

  53. Slide 53: Molybdenum BU Financial & Operating Highlights

    Molybdenum BU Financial & Operating Highlights Financial Highlights ($M, except as noted) Q1 2025 2024 2023 2022 Total revenue 94.7 253.0 306.7 276.1 Production costs 94.2 256.0 312.9 284.5 Earnings (loss) from mine operations (0.6) (6.4) (10.5) (13.6) Care and maintenance costs – Molybdenum mines 2

  54. Slide 54: Operating Cost Breakdown (by Operating Site)

    Operating Cost Breakdown (by Operating Site) Mount Milligan Q1 2025 2024 2023 2022 Mining cost per tonne ($/t)(1) 2.97 2.68 2.25 2.18 Processing cost per tonne ($/t)(1) 7.39 5.33 5.96 5.39 Site G&A cost per tonne ($/t)(1) 2.76 2.45 2.51 2.58 On site cost per tonne ($/t)(1) 17.1 13.54 13.66 12.50 Öks

  55. Slide 55: 2025 Sensitivities and Material Assumptions

    2025 Sensitivities and Material Assumptions 2025 SENSITIVITIES Impact on Impact on ($M) ($/oz) Production Capital Cash AISC on a by-product Revenues Costs & Taxes Costs Flows basis per ounce(4) Gold price(1) $100/oz 3.0 – 3.5 — 16.5 – 19.5 14.0 – 17.0 5–6 Copper price(1) 10% 0.5 – 1.0 — 12.5 – 16.5

  56. Slide 56: Mineral Reserves & Resources – Gold

    Mineral Reserves & Resources – Gold(1) (as of December 31, 2024)(5) Proven Gold Reserves Probable Gold Reserves Total Proven & Probable Gold Reserves Property Tonnes Grade Contained Grade Contained Grade Contained Gold Tonnes (kt) Tonnes (kt) (kt) (g/t) Gold (koz) (g/t) Gold (koz) (g/t) (koz) Mount

  57. Slide 57: Mineral Reserves & Resources – Copper

    Mineral Reserves & Resources – Copper(1) (as of December 31, 2024)(5) Proven Copper Reserves Probable Copper Reserves Total Proven & Probable Copper Reserves Property Tonnes Copper Contained Tonnes Copper Contained Tonnes Copper Grade Contained (kt) Grade (%) Copper (Mlbs) (kt) Grade (%) Copper (Mlb

  58. Slide 58: Mineral Reserves & Resources – Molybdenum

    Mineral Reserves & Resources – Molybdenum(1) (as of December 31, 2024) Proven & Probable Molybdenum Mineral Reserves Proven Reserves(2) Probable Reserves(2) Total Proven & Probable Reserves Property Tonnes Moly Grade Contained Tonnes Moly Grade Contained Tonnes Moly Grade Contained (kt) (%) Moly (Ml

  59. Slide 59: Mineral Reserves & Resources Additional Footnotes

    Mineral Reserves & Resources Additional Footnotes General A conversion factor of 31.1035 grams per troy ounce of gold is used in the mineral reserve and mineral resource estimates. Mount Milligan Mine The mineral reserves are reported based on a gold price of $1,800 per ounce, a copper price of $3.7

  60. Slide 60: Mineral Reserves & Resources Additional Footnotes

    Mineral Reserves & Resources Additional Footnotes Qualified Persons (“QPs”) – Mineral Reserves and Resources Christopher Richings, Professional Engineer, member of the Engineers and Geoscientists British Columbia (EGBC) and Centerra’s Vice President, Technical Services, has reviewed and approved the

  61. Slide 61: Thank You!

    TSX CG NYSE CGAU THANK YOU! 1 University Avenue, Suite 1800 phone 416-204-1953 Toronto, Ontario M5J 2P1 fax 416-204-1954 email investor@centerragold.com