Besra Gold Inc · ASX:BEZ
Besra Gold — Shareholder Meeting (July 2023)
13 slides from Besra Gold's shareholder meeting presentation, Jul 25, 2023
Slide 1: Besra Gold Inc. Special General Meeting 24-25 July 2023
BESRA GOLD INC. Special General Meeting 24-25 July 2023
Slide 2: Competent Person's Statement and Disclaimer
Competent Person’s Statement Disclosure The information in this Announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr. The Pejiru Sector lies within MC/KD/01/1994 which has been pending renewal for a number Kevin J. Wright, a Compe
Slide 3: Bau Gold Field Corridor Update
BAU GOLD FIELD CORRIDOR UPDATE
Slide 4: Quantum Funding Facility
• Quantum Funding Facility is a “game- changer” • Removes the need for traditional pipeline of equity based dilutive funding requirements that typically cap the share price of companies transitioning from explorer to producer. • Provides certainty for implementing Besra’s forward strategic core acti
Slide 5: Forward Strategic Priorities: Jugan Pilot Plant and Test Pit
Construction & Commissioning of Jugan Pilot Plant and Test Pit • 60,000m Jugan Resource drilling. • JORC Resource 870,000koz @ 1.5 g/t (Measured & Indicated) and 90koz @ 1.6 g/t (Inferred). • 2021-2022 drilling confirmed stand-alone development potential including higher grades. • Mineralisation fro
Slide 6: Forward Strategic Priorities: Pilot Plant Construction and Commissioning
Construction & Commissioning of Jugan Pilot Plant and Test Pit • Environmental Impact Assessment approved; • Project Manager appointed; • Detailed site survey completed and soil/water benchmark survey about to commence; • Pilot plant equipment procurement items finalised; • Site design earthworks an
Slide 7: Forward Strategic Priorities: Bau Gold Field Corridor Resource Drilling
BAU GOLD FIELD CORRIDOR RESOURCE DRILLING • Funding facility enables accelerated Resource drilling to upgrade Inferred and Indicated Resource inventories. • Bau Corridor has an Exploration Target of (4.9- 9.3 Moz)1 FORWARD STRATEGIC • Significant potential to add Resources through low risk drilling
Slide 8: Bekajang Project
Bekajang Project Current JORC (2012)/NI 43-101 Compliant Resource:- •Indicated 1.9 Mt@2.0 g/t Au for 120.4 koz •Inferred 10.6 Mt@1.5 g/t Au for 524.1 koz. Mineral fairway contains two historical mines. Strong structurally controlled mineralisation trends implicate local shallow intrusive heat source
Slide 9: Resource Drilling: Unlocking higher grade gold potential
RESOURCE DRILLING Unlocking higher grade gold potential. BONANZA GRADE INTERCEPTS BKDDH-27 47m of mineralisation including : 2m @ 8.81 g/t Au from 40m to 42m 13m @ 22.91 g/t Au from 58m to 71m - including 0.5m @ 209 g/t Au from 60.5m to 61.0m, including 1.0m @ 64.0 g/t Au from 61.0m to 62.0m,
Slide 10: Bekajang Project
Bekajang Project • Program of ~1400m of fully diamond core drilling completed as follow-up on BBKDH-27 bonanza grade intercepts. • Visual inspection of core indicates a south-west orientation for the hydrothermally associated mineralisation, cross-trend to the WNW surface faulting. • Awaiting final
Slide 11: Commitment to Social Licence - ESG
COMMITMENT TO SOCIAL LICENCE -ESG With long term funding certainty, Besra intends to implement long term plans to deliver on its commitment to ESG and requirement to earn a social licence from all stakeholders. Besra’s long association with the local FORWARD STRATEGIC communities is further enhanced
Slide 12: Unique Amongst Its Peers
The Quantum Funding Facility now makes Besra unique amongst its peers. Besra’s access to this funding puts it on a footing which is normally not associated with junior mining companies. Besra will have no need for dilutionary funding for the foreseeable future, with very positive implications for sh