Slide 1: Commerzbank German Corporate Day 2024

Slide 2: EnBW investment highlights
• >93% of share capital constantly held by Baden-Wuerttemberg (third- • Demonstrated resilience across cycles and crises largest German state) and OEW (an association of counties) • Target 2024-30: ≥70% share of regulated grids and contracted or • €40 bn of gross investments 2024-2030 with ≥85% envi

Slide 3: Agenda
Agenda —EnBW 2. Corporate and sustainability strategy 10 3. Funding strategy 23 4. Appendix 30

Slide 4: EnBW at a glance
• Power generation and marketing of electricity, district heating, trading, gas storage • Generation capacity: >12 GW With an integrated approach along the value chain and by • Power generation: 27 TWh serving the entire triangle of the • Transmission & distribution grids for electricity and gas, wa

Slide 5: Shareholder structure
• Austria, Czech Republic, Denmark, France, Poland, > 93% held by two largest shareholders: Sweden, Switzerland, Türkiye, United Kingdom The state of Baden-Württemberg (3rd largest German state and one of the most prosperous regions in Europe) and OEW (an association of districts) 46.8 OEW Sharehold

Slide 6: Financial performance 2019-2024
in € bn • Revenues: €44.4 bn 6.4 6,4 5.5 – 6.3 4.6 – 5.2 • Retained cash flow: €4.8 bn 4.0 4,0 • Gross investments: €4.9 bn 2.8 2,8 3,0 3.0 2,4 2.4 • Taxonomy-aligned capex: 87% • Net debt: €11.7 bn 2019 2020 2021 20222 2023 Guidance Target 2024 2030 • Credit ratings: A- (S&P) Baa1 (Moody‘s) • Uncer

Slide 7: Adjusted EBITDA 2024 guidance by segment
in € bn • Lower energy prices due to normalized market environment 4.6 2.6 - 3.1 • Capacity growth in renewables 4.6 – 5.2 1.8 1.9 - 2.2 • Higher earnings from grids as a result of 2023: 6.41 increased investments • No repetition of negative one-offs 2023 0.2 0.25 - 0.35 • Restructuring of the produ

Slide 8: Key operating figures and progress
+0.2 GW (to 6.5 GW) -1 GW (to 3.5 GW) 1.5 GW (under construction) Installed renewables capacity1 Coal-based capacity H2-ready new flexible capacity >55% 3% (-1% pt yoy) >800 km (under construction) Renewables installed capacity share Coal-based revenues in H1 2024 TSO power links projects 5 GW -100

Slide 9: Agenda
Agenda —EnBW 1. EnBW at a glance 4 3. Funding strategy 23 4. Appendix 30

Slide 10: Energy transition in Germany: nuclear and coal phase-out
• Decided in 2011 in a political and social consensus and regulated by law • The last 3 nuclear power plants were shut down in April 2023 • All of EnBW’s nuclear power plants are in the dismantling stage; it is technically impossible to bring them back into operation • Decided in 2020 – law sets the

Slide 11: EnBW strategy: infrastructure focus
Focus on the infrastructure aspects of existing • Integrated strategy along the entire energy value chain Update of the 2025 strategy with an outlook to energy-related business fields • Demonstrated resilience to adverse market developments the period up to 2030: • Quick adaptation to political and

Slide 12: Strategy 2030: earnings mix and investments
0.7 - 1.0 ≥ 70% 10% 85% ≥ low-risk taxonomy-aligned earnings share 30% capex 1 (adj. EBITDA in Grids and 5.5 - 6.3 Renewables) 40 € bn 2.7 - 3.0 € bn 2.3 - 2.6 60% Net investments2 2024-30: €22 bn Sustainable Generation Infrastructure System Critical Infrastructure Smart Infrastructure for Customers

Slide 13: Generation portfolio development to 2030
0.2 GW 1.3 GW 2.2 • Significant expansion of the GW portfolio 0.9 GW 0.1 GW • Renewable portfolio increases to 13.4 GW 12.2 GW o/w 2.5 GW o/w 5.7 GW 1.5 GW 75 - 80% 10 – 11.5 GW by 2030 Renewables renewables renewables (19%) (47%) • Thermal generation is gas-based; coal-free in 2028 1.0 GW 1.0 • Swi

Slide 14: Decarbonization path and coal phase-out
in GW 1 4.1 2027 2030 2035 3.7 Hard coal 2026 2028 Lignite 3.1 Fuel switch projects Coal phase-out Climate neutrality 2.3 Start of commercial (subject to enabling conditions) in Scope 1 & 2 3.2 2.8 operation emissions 2.0 2.2 1.4 Scope 1 & 2 emissions Scope 1 & 2 emissions 1.1 All coal-fired power p

Slide 15: Sustainable Generation Infrastructure
• Joint ventures with bp to build 5.9 GW offshore wind farms in the UK by 2029 • Power generation and marketing of electricity, district heating, trading, gas storage • 30% of all investments will be on the expansion of wind farms and solar parks and the construction of climate-friendly, hydrogen-re

Slide 16: Offshore wind projects
100% Environmentally sustainable Morven Dreekant Morgan He Dreiht Mona Location United Kingdom Location Germany, North Sea Location Germany, North Sea 3 GW (leases) Mona and Morgan Capacity 1 GW Capacity 960 MW Capacity 2.9 GW Morven 2029/30e Mona and Morgan Commissioning 2031 Commissioning 2025 Com

Slide 17: H2-ready gas power plants
100% taxonomy aligned 1 H2-ready gas power plant, 675 MW (CCGT) Expected COD: end of 2026 • Final Investment Decision in March 2022 • All 3 projects under construction 2 Gas turbine plant, • Switch to natural gas reduces carbon emissions immediately by up to 55% 124 MW (OCGT) First fire in October 2

Slide 18: System Critical Infrastructure
• Expansion of electricity and gas transport grids • Transmission and distribution grids for electricity and gas • Preparation of grid infrastructure for future demands (mobility, heat pumps, • Water supply and provision of grid-related services decentralized energy) • Adj. EBITDA 2023: €1.8 bn 9,77

Slide 19: Grid expansion projects
Projects Grid length Grid length Scheduled Bruns- total TransnetBW büttel Wilster Büchen Rhine river area in ~121 km 2029 Emden Routes are Baden approximate North Baden- ~82 km 2031 Corridor AC4 grid Württemberg A-Nord reinforcement North-east Baden- ~99 km 2026 Württemberg Osterath Hochrhein ~140 k

Slide 20: Smart Infrastructure for Customers
• Focus on expanding fast-charging infrastructure for e-mobility to 30,000 • Sale of electricity and gas, in addition to telecommunications points by 2030 • E-mobility and home storage systems for solar electricity • Expansion of household energy solutions, such as photovoltaics and storage • Adj. E

Slide 21: E-mobility: fast-charging network
Most popular >2.7 million • EBITDA break-even expected in 2024 electromobility app in Germany! downloads of EnBW mobility+ app • Ranked as the winner in consumer tests as Germany’s largest and best electromobility supplier and rated as VERY GOOD as a charging network operator for the third time in a

Slide 22: Agenda
Agenda —EnBW 1. EnBW at a glance 4 2. Corporate and sustainability strategy 10 4. Appendix 30

Slide 23: Funding strategy
€2.5 - 3 bn p.a. • Refinancing of maturing liabilities on average • Funding of corporate growth • EnBW’s assets are typically characterized by long life cycles up to 30 years • Decision based on market demand, maturity profile & interest levels • First green bond issued in 2018 Cumulative total • Ta

Slide 24: Credit ratings and financial targets
• Debt repayment potential • EnBW regularly checks whether target value is in line with key credit metrics of the rating agencies to safeguard rating targets 𝑅𝑒𝑡𝑎𝑖𝑛𝑒𝑑 𝐶𝑎𝑠ℎ 𝐹𝑙𝑜𝑤1 𝑁𝑒𝑡 𝐷𝑒𝑏𝑡 12% 15% A- target adjusted in Integrated Annual stable Report 2023 • High share of…

Slide 25: Rating peer group comparison
A A2 A– A3 BBB+ Baa1 BBB Baa2 BBB– Baa3 • EnBW is the highest and most stably rated company • EnBW is at the high end of the rated universe, only one company within its peer group, maintaining an A- rating since 2016 within its peer group maintains an A3 rating with Moody’s currently • Slight overal

Slide 26: ESG ratings
AA Leader AAA – AA; Average A – BB; Laggard B – CCC Leader B absolute best-in-class basis; Prime Status awarded Prime status 28.0 Risk Score: negligible (0-10); low (10-20); medium (20-30); high (30-40); severe (40+) Medium risk A- Leadership A/A-; Management B/B-; Awareness C/C-; Disclosure D/D-; F

Slide 27: Green Financing Framework
100% taxonomy Eligible Project Contribution to green activity category aligned • First published in 2018 and most recently UN SDGs EU taxonomy1 updated in 2024 4.1 Electricity generation using • Solar (PV) energy generation solar photovoltaic technology (NACE: D35.1.1) • Alignment with ICMA Green Bo

Slide 28

Slide 29: Agenda
Agenda —EnBW 1. EnBW at a glance 4 2. Corporate and sustainability strategy 10 3. Funding strategy 23

Slide 30: Additional information: Management team
—EnBW Additional information: Management team

Slide 31: Board of Management and Supervisory Board
• Responsible for Group management and strategy • Consists of 20 experienced, diverse and independent • Represents the company legally members and is composed of an equal number of shareholder and employee representatives • Appoints members of Board of Management and sets their remuneration • Acts a

Slide 32: Additional information: Nuclear and coal
—EnBW Additional information: Nuclear and coal

Slide 33: Nuclear decommissioning and dismantling
2005 - Obrigheim was shut down and has been in the dismantling process since 2008. March – 6 Nuclear Power Plants shut down immediately after the Fukushima incident. 2011 June – German Bundestag (Parliament) decides to phase-out nuclear energy completely within a - decade. EnBW starts the multi-stag

Slide 34: German installed capacity and nuclear provisions
in GW 2023 2022 2021 • No installed nuclear capacity for electricity generation in Germany since May 2023 Solar 81.8 67.6 60.1 Onshore wind 61.0 58.0 55.9 • EnBW considers the dismantling of its five nuclear power plants to be part of the Biomass 9.0 8.9 8.9 energy transition and is rigorously imple

Slide 35: Coal phase-out and fuel switch plan
in MW 4 RDK 7 9 RDK 87,8 May 2024 examination of fuel switch4 2028 6 MÜN 7 HLB 78 8 HKW 28 1 BEX 2 HLB 5,6 3 HKW 1 5 FUG fuel switch3 fuel switch3 fuel switch3 10 ROS7,9 & 11 LIP7,9 5.1 Dec 2014 Apr 2015 July 2017 Mar 2024 2025 Febr 2026 2027 2028 Hard coal 1 BEX (Bexbach) 4.3 10 2 HLB 5,6 (Heilbron

Slide 36: Additional information: Sustainable Generation Infrastructure
—EnBW Additional information: Sustainable Generation Infrastructure

Slide 37: Renewable Energies
0.1 1.0 1.0 • Adj. EBITDA 20232: €1.7 bn Share of total adj. EBITDA: 27% • Investments 2023: €1.2 bn 5.71 • Employees 2023: 7,563 (Sustainable Generation Infrastructure) 1.0 GW 1.5 • Generation capacity 2023: 5.7 GW, 47% of total generation capacity • Electricity generated 2023: 13 TWh, 48% of total

Slide 38: Thermal Generation and Trading
0.5 1.2 • Adj. EBITDA 20233 (including trading): €2.9 bn Share of total adj. EBITDA (including trading): 46% 0.9 • Investments 2023: €0.6 bn 1 0.6 6.5 • Employees 2023: 7,563 (Sustainable Generation Infrastructure) GW • Generation capacity 2023: 6.5 GW, 53% of total generation capacity Gas Pumped st

Slide 39: Additional information: Funding
—EnBW Additional information: Funding

Slide 40: Debt structure by instrument and currency
in % 17 3 21 3 4 1 6 Currency Fixed/ 4 ~€14.6 bn mix floating mix 3 69 88 97 Public senior Promissory Notes Public hybrid EUR CHF GBP Fix Private placement USPP AUD USD JPY Floating As of 5 November 2024. 40

Slide 41: Bond maturity profile and green bonds
in € bn Senior bonds Hybrid bonds as of 5 November 2024 Green senior bonds Green hybrid bonds Green First call dates of hybrid bonds 1.7 bonds ratio: First call dates of green hybrid bonds 1.5 1.5 52% 0.51 1.4 0.54 0.57 1.2 1.0 1.0 1.0 0.5 0.7 0.8 0.5 0.7 0.5 0.7 1.39 0.76 0.6 0.53 0.58 0.5 0.5 0.5

Slide 42: Allocation to green bonds
Allocation to green bonds 100% 80% 60% 40% 20% 0% Senior bond 2018 Hybrid bond 2019 Hybrid bond 2020 Hybrid bond 2021 Senior bond 2022 Senior bond 2023 Hybrid bond 2024 Senior bond 2024 Senior bond 2024 (€0.5 bn) (€0.5 bn) (€0.5 bn) 1 (€0.5 bn) (€1.0 bn) (€1.5 bn) (€0.5 bn) (€1.2 bn) (A$1.0 bn) Proc

Slide 43: Additional information: Financial overview
—EnBW Additional information: Financial overview

Slide 44: Adjusted EBITDA 9M 2024
in € m 4,921 €4.6 - 5.2 bn Guidance 2024 - Lower earnings from pumped storage due to decreased spreads 2,105 3,745 1,104 - Normalized earnings level after extraordinarily high earnings contribution 1,360 876 in previous year 71% low-risk 57% low-risk earnings earnings -24% 1,772 1,428 + Higher earni

Slide 45: Net cash investments 9M 2024
in € m Net cash investments Co-financing/divestments 3,873 1% 12% 2,801 29% Sustainable Generation Infrastructure Renewable Energies 3,394 €3.9 bn Thermal Generation and Trading 2,328 9M 2024 System Critical Infrastructure Smart Infrastructure for Customers +38% 44% Other/consolidation 14% 473 480 9

Slide 46: Retained cash flow
in € m in € m 4,832 3,217 3,174 1,463 +50% -54% 20222 2023 9M 2023 9M 2024 1 After covering interest expenses, taxes and dividend payments, the retained cash flow is available to the company for investment without the need to raise additional debt. | 2 Previous year’s figures 46 restated.

Slide 47: Net debt development
in € bn +14% • Debt repayment 3.4 0.1 13.3 potential target of -0.3 -0.2 ≥15%1 11.7 • Current credit ratings: 0.1 A-/Baa1 -1.5 • Commitment to maintain solid investment grade ratings Net debt RCF Adjusted Net cash Equity credit of Change in Others Net debt 31.12.2023 working capital investments gree

Slide 48: Nuclear provisions and cash flow impact
in € m 10,000 8,000 6,000 4,000 Max. No €375 m1 impact on p.a. impact 800 OCF on OCF 600 400 200 0 2023 2025 2030 2035 2040 2045 2050 As of 31 December 2023. I 1 Adjusted for inflation. ◼ OCF contribution ◼ Asset contribution 48

Slide 49: Key financial figures 2019-2023
2023 2022 2021 2020 2019 Earnings External revenue € mn 44,431 56,003 32,148 19,694 19,436 Adjusted EBITDA1 € mn 6,365 3,967 2,959 2,781 2,433 Adjusted Group net profit/loss1,2 € mn 2,780 1,413 1,203 683 787 Earnings per share2 € 5.68 6.42 1.34 2.20 2.71 Dividend per share/dividend payout ratio3 €/%

Slide 50: Segment figures 2019-2023
2023 2022 2021 2020 2019 Energy sales Electricity bn kWh 81 106 108 107 153 Gas bn kWh 548 509 495 442 362 Sustainable Generation Infrastructure External revenue € mn 20,832 30,543 13,804 6,064 6,623 Adjusted EBITDA1 € mn 4,648 2,616 1,540 1,278 925 System Critical Infrastructure External revenue1 €

Slide 51: Additional information: Calendar, links and contacts
—EnBW Additional information: Calendar, links and contacts

Slide 52: Financial calendar and publications
Quarterly Statement 9M 2024 .................................... (PDF) 26 March 2025, 03:00 p.m. (CET) Investor and analyst conference call Six-Monthly Financial Report 2024 ........................... (PDF) Integrated Annual Report 2023 .................................. (PDF) Green Bond Impact Rep

Slide 53: Investor Relations contacts
SVP Finance, M&A Head of Investor Relations Senior Manager and Investor Relations Investor Relations +49 721 63 16 102 +49 721 63 12 210 +49 721 63 12 060 ma.muench@enbw.com l.zikmundova@enbw.com j.vonwietersheim@enbw.com 53

Slide 54: Disclaimer
No offer or investment recommendation Forward-looking statements This presentation is prepared for information purposes only. It does not constitute an offer, an invitation or a This presentation, which has been prepared by EnBW, includes statements that are, or may be deemed to be, recommendation t

Slide 55: Investor Relations
Investor Relations investor.relations@enbw.com +49 721 63-12060 Durlacher Allee 93 76131 Karlsruhe, Germany Companies registered office: Karlsruhe, Germany Local court Mannheim ⋅ HRB no. 107956 Chairman of the Supervisory Board: Lutz Feldmann Board of management: Dr. Georg Stamatelopoulos (Chairman)
Source: Internet Archive copy of enbw.com
More decks from ENBW Energie Baden-Wuerttemberg AG
9M 2026 Earnings Presentation20 slides · Nov 12, 2026
Investor Presentation (November 2026)56 slides · November 2026
Investor Presentation (October 2026)65 slides · October 2026
Investor Presentation (September 2026)65 slides · September 2026
6M 2026 Earnings Presentation24 slides · Aug 7, 2026
Q1 2026 Earnings Presentation20 slides · May 12, 2026