  1. Slide 1: Gold Focused in Canada’s Abitibi

    WWW.OREFINDERS.CA | ORX:TSXV Gold Focused in Canada’s Abitibi

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS We are in the mineral exploration and development business. It is inherently risky, and all potential investors should be keenly aware of this. This presentation contains forward-looking statements. All statements, other than of historical fact, that address activities, ev

  3. Slide 3: Orefinders Defined

    OREFINDERS DEFINED Orefinders is focused on developing advanced stage preproduction gold assets within Canada’s most prolific gold bearing region – the Abitibi. 100% ownership of two district scale projects in Ontario: • Mirado in Kirkland Lake • Knight in Timiskaming District 3

  4. Slide 4: Orefinders Assets: Heart of the Abitibi

    OREFINDERS ASSETS: Heart of the Abitibi 4

  5. Slide 5: Mirado Project

    MIRADO PROJECT • Mirado contains three former producing mines on 2,417 hectares including 12 patented claims • In 2017 sold 1,414 oz.. of Gold from its bulk sample from the Stockpiles from the Mirado Mine. • Mirado Mine’s PEA published January 2018 defines strong economics Mirado Mine restarting hig

  6. Slide 6: PEA: Mirado South Zone Open Pit

    PEA: MIRADO SOUTH ZONE OPEN PIT PEA defines Mirado South Zone’s near surface mineralization that can be profitably mined within a short time frame & without on-site processing or tailings facility. South Zone Open Pit Economics: IRR: 158% NPV: $30.8 million, undiscounted; $20.5 million NPV at 5% dis

  7. Slide 7: Open Pit PEA

    OPEN PIT PEA • Represents only 5% of Mirado Project • Will be used as a cash flow generator to develop big picture potential on Mirado and Knight Projects • Very low Capex required to restart • No tailings facility, no onsite mill = faster permitting • PEA is based off real metallurgical, crushing &

  8. Slide 8: Bootstrapping Growth

    BOOTSTRAPPING GROWTH 1 2 3 Open Pit PEA Intent is to define a Start small, and grow economics are very profitable but limited strategy strong, but do not scope project to fund encompass any value Mirado’s and Knight and potential outside Projects significant its narrow scope development potential 8

  9. Slide 9: NAV Sensitivities to Gold Price

    NAV SENSITIVITIES TO GOLD PRICE Gold Price Undiscounted Pre-Tax Discounted (5%) Post-Tax (US$/oz) Cash Flow ($ millions) Cash Flow ($ millions) 1,375 37.7 25.0 1,350 35.4 23.5 1,325 33.1 22.0 1,300 30.8 20.5 1,275 28.4 19.0 1,250 26.1 17.4 1,225 23.8 15.9 1,200 21.5 14.4 1,175 19.1 12.9 An exchange

  10. Slide 10: Orefinders Knight Project

    OREFINDERS KNIGHT PROJECT Nine Key Properties Consolidated in Highly Prospective District • Major land owner of both high grade & low grade bulk tonnage properties • District has potential for major orebody • Acquired 100% ownership in three separate transactions in January 2018 • Orefinders core la

  11. Slide 11: Knight Project Core Properties Map

    Knight Project Core Properties Map 11

  12. Slide 12: Knight Project Assets

    Knight Project Assets • Knight Project assets are accessible by car via Highway 560. • Minto Mine, Tyrenite Mine, Duggan Mine, Porphyry Lake, Mann Mine (Cobalt –Silver) • Total Land Package 23.5km2 on 14 patented leases and 67 mining claims • Approximately 30KM of drilling on properties • 5 former p

  13. Slide 13: Minto Mine

    MINTO MINE 2010-2011 Drill Programs • 18.2 gpt Gold over 65.7 metres, MC-09-02 • 13.3 gpt Gold over 82.5 metres, MC-09-01 • 1.01 gpt Gold over 192 metres, MC-11-11 • 1.15 gpt Gold over 280 metres, MC-10-03b The Minto is a very high grade breccia pipe with a diameter between 30 to 60 metres. The reso

  14. Slide 14: Minto Mine – Near Term Cash Flow

    MINTO MINE – Near Term Cash Flow 14

  15. Slide 15: Duggan & Porphyry Lake Drilling

    DUGGAN & PORPHYRY LAKE DRILLING Near surface intersections showing wide zones of mineralization with significant Open Pit Potential Duggan Drilling • 1.52 gpt Gold over 75.5 metres in hole D3-07 • 2.20 gpt Gold over 34.50 metres in hole CD13-03 Porphyry Lake Drilling • 2.40 gpt Gold over 15.0 metres

  16. Slide 16: Tyrenite Mine

    TYRENITE MINE Tyrenite Shaft Tyrenite Mine Extension acquired by Orefinders (was not owned 16 by Premet)

  17. Slide 17: Tyrenite Mine

    TYRENITE MINE 17

  18. Slide 18: Knight Project History

    KNIGHT PROJECT HISTORY Knight Project assets were acquired for a fraction of their past & future value • 2014, Knight Land package was acquired at a +$21M valuation. • +$13M was spent by previous owner (2010-2014) on exploration and development on Minto, Duggan and Tyrenite. • 2011, Hunter Dickinson

  19. Slide 19: Knight Project Vision

    KNIGHT PROJECT VISION • At least 2 and maybe 3 gold events at Knight. • Early mesothermal shear hosted quartz-carbonate-pyrite veins in volcanics and at contacts of porphyry intrusions. • Possible early intrusion-hosted gold in porphyries. • Late, epithermal diatreme breccias at Minto Deposit. • Clo

  20. Slide 20: Orefinders Leadership

    OREFINDERS LEADERSHIP • Behind the consolidation and discovery of Cote Lake Project • Bought by IAMGOLD in 2012 for $608M • Looking to recreate Cote Lake success with • Knight Project– with holds many similarities • Duggan • Porphyry Lake • Tyrenite • Minto • Mirado • Huge upside from exploration wh

  21. Slide 21: Management Team

    MANAGEMENT TEAM Stephen Stewart, M.Sc., MBA – CEO and Director Stephen has over 15 years of experience in the resource and finance industries where he has evaluated and raised capital for natural resource projects. His focus has been on the acquisition, exploration and development of resource assets

  22. Slide 22: Non Core Assets

    NON CORE ASSETS In addition to the Mirado & Knight Projects Orefinders also owns 100% of: • Mann Mines, Cobalt – Silver Mine with former production • Significant interest from 3rd Parties to Acquire this land package • Silver & Cobalt production from the 1980’s. • Multiple shafts and ramps to histor

  23. Slide 23: Mann Mine: High Value Non Core Asset

    MANN MINE: HIGH VALUE NON CORE ASSET • Mann Mines are silver and cobalt properties located in Milner Township, Ontario within the Cobalt-Gowanda District • The property hosts 9 historic shafts, a ramp driven to the 210-foot level and the former past producing Mann Mine recorded a production of nearl

  24. Slide 24: Mann: Cobalt-Silver Intersections

    MANN: COBALT-SILVER INTERSECTIONS MNDM: AFRI: 20011567

  25. Slide 25: Mann: Cobalt-Silver Intersections

    MANN: COBALT-SILVER INTERSECTIONS Ag (g/t) MNDM: AFRI: 20011567

  26. Slide 26: Mann’s 2011-2012 DDH

    MANN’S 2011-2012 DDH HoleID Datum UTMEast UTMNorth Elevation Length Dip Azimuth MN11-01 NAD83ZN17 513,824.9 5274074.1 395.0 227.00 -45 185 MN11-02 NAD83ZN17 513832.5 5274077.1 395.0 194.00 -45 174 MN11-03 NAD83ZN17 513832.5 5274077.1 395.0 209.00 -45 179 MN11-04 NAD83ZN17 513805.3 5274075.8 391.0 74

  27. Slide 27: Corona Property

    CORONA PROPERTY • Exploration Property with high grades outcropping at surface. • Extensive small scale artisan mining has been completed on the Corona for the last 3 decades. 27

  28. Slide 28: Contact