Red Rock Resources plc · LSE:RRR
Red Rock Resources — Investor Presentation (October 2010)
29 slides from Red Rock Resources's investor presentation, October 2010
Slide 1: October 2010
October 2010
Slide 2: Disclaimer
Disclaimer These presentation slides (the “Slides”) do not constitute an offer to the public or an offer for sale or solicitation to purchase or subscribe for any securities of the Company and they should not be relied on in connection with a decision to purchase or subscribe for any such securities
Slide 3: Corporate Profile
Corporate Profile AIM Listed Company (AIM:RRR) Assets : Gold and VMS deposits in Kenya Two gold mines in Colombia Major Shareholder: Regency Mines (22%) Share Price: 6.60 pence Market Cap: £43.18m Shares in Issue: 654,387,240 3
Slide 4: Share Price & Volume
Share Price & Volume Daily volume 8.5m shares on AIM 1.5m on PLUS (3m average) 4
Slide 5: Management
Management Executive Directors: Andrew Bell, MA, LLB, FGS, Chairman Over 30 years experience in finance, investment and mining. Directorships include Regency Mines Plc (Chairman), Resource Star Ltd (Chairman) and Jupiter Mines Ltd (Director). Manoli Yannaghas, BA, Director 15 years experience in
Slide 6: Management
Management Non-Executive Directors: Michael Nott, BSc, MSc, FIMMM, FIQ, FMES Mining engineer and geologist with over 35 years experience. John Watkins, FCA Former partner of Ernst & Young, with over 35 years of accounting experience. Robert Weicker, BSc, PGeo Geologist with over 25 years exper
Slide 7: Gold: Kenya
GOLD: KENYA 7
Slide 8: Migori: Project Overview
Migori: Project Overview Mid Migori Mining (MMM) Company Limited operates the Migori gold and base metals project RRR owns 15% of MMM with farm in to raise to 60% Historic gold and base metals mining between 1930s-60s Geita • Located in SW Kenya, 15 km north of the Tanzanian border AngloGold 1.89 g/
Slide 9: Migori: Project Map
Migori: Project Map Option over further 320 sq km SPL 236 (Ngira Migori) Special Prospecting Licences 122 and 202 covering 310.5 sq km 9
Slide 10: Migori: Current Gold Resources
Migori: Current Gold Resources Tonnes Grade Contained Prospect Category (kt) (g/t) Au (oz) KKM Indicated 22,110 0.96 680,000 Gori Maria Indicated 8,600 0.87 240,000 MK Indicated 1,450 2.32 108,000 Nyanza Indicated 840 5.32 144,000 2006 Subtotal: Indicated 33,000 1.10 1,172,000 NI 43:101 Macalder Tai
Slide 11: Migori: Tailings Project
Migori: Tailings Project Macalder Tailings Dam Mid- 2010: JORC-Compliant, Indicated Resource estimate Estimate excluded 5 holes from smaller, adjacent tailings dam Metallurgical test work being assessed 1.424 million tonnes containing 75,084 oz Au at 1.64 g/t Zone Volume (m3) Tonnes (kt) Grade
Slide 12: Migori: Exploration Stages
Migori: Exploration Stages GIS Database Geophysics Geology PHASE 1 Drilling & VTEM Field Reconnaissance Aug 2009 Soil Geochemistry Magnetics/Radiometrics Maps & Cross-Sections Sep 2010 PHASE 2 Interpretation Oct 2010 Nov 2010 PHASE 3 Drilling Programme 12
Slide 13: Migori: Objectives
Migori: Objectives Build a 2 - 3Moz resource base Follow up high grade intersections Investigate Macalder VMS and other VTEM targets Upgrade KKM Resource model with view to early production Plan for gold production from tailings
Slide 14: Gold: Colombia
VT, GOLD: Colombia
Slide 15: Colombia: Gold Overview
Colombia: Gold Overview Investment in two Colombian Goldmines on Frontino Gold Belt – oldest in Colombia Loan with rights to acquire up to 51% of operating company El Limon 60 year old production history – production infrastructure in place Ore production capacity expected to be 150tons/day
Slide 16: Colombia: Area Map
Colombia: Area Map Frontino Gold Belt Zaragoza El Limon La Aurora Segovia Mineralisation in the Frontino Gold Belt is controlled by the OTU FAULT (N-S) Remedios The Frontino Gold Belt is one of the world’s great mesothermal gold fields, with estimated production of 8-9 Moz from the Segovia-Remedios
Slide 17: Colombia: Assets
Colombia: Assets El Limon 60-year-old mine produced 108 tonnes of ore/m and 15.3kg/m in first five months of 2010 from non-mechanised operations. Vein-style gold deposit produced ore from 7 levels down to 380m. Surface plant with 150 tpd capacity non-operational for several years Machuca (La A
Slide 18: Colombia: Deal Structure
Colombia: Deal Structure 3 year $US2m loan to Mineras Four Points (MFP) 5% interest 3 year Consultancy Agreement at $200K and increasing to $350k/quarter (Gross Return $3.2m) Total agreed return 15% EBITDA if greater Option (2 yr period) to acquire 50% of MFP for $6.5m Option (3 yr period) to
Slide 19: Colombia: Objectives
Colombia: Objectives Looking for extensions to the vein Expanding plant capacity to 250tpd and 400tpd Exploring for other veins Expanding property portfolio in order to grow production 19
Slide 20: Financial Summary
VT, FINANCIAL SUMMARY
Slide 21: Investment Holdings
Investment Holdings Jupiter Mines Ltd ASX –listed ‘steel feed’ platform created by RRR/Pallinghurst with potential 1.3 bn ton magnetite project in WA (RRR has 1.5% royalty) August 2010 vote agreed to acquire major open pit manganese mine at Tshipi, S. Africa 83,734,165 shares held by RRR (22.7
Slide 22: Financial Overview
Financial Overview End October 2010 End December 2010 (Predicted) (Projected) Current Assets and Investments Cash £1,500,000 £7,000,000 Listed Investments £15,300,000 £15,300,000 Loans -£560,000 -£192,000 Market Value £44,000,000 £44,000,000 Overhead 2010 Q4 exploration cost (est): -£400,000 2010 Q4
Slide 23: Political Risk
VT, POLITICAL RISK
Slide 24: Kenya: Political Risk
Kenya: Political Risk Tribal riots after last Presidential election Migori area affected Perception of corruption Mitigated by: International mediation and assistance New constitution Bipartisan approach to reform New local appointments by MMM.
Slide 25: Colombia: Political Risk
Colombia: Political Risk FARC communist guerrillas and drug cartels established in some areas of the country The El Limon and Machuca areas historically affected Mitigated by: Successful military campaigns against FARC U.S.A assisted drive against cocaine production El Limon and Machuca ar
Slide 26: Summary
SUMMARY 26
Slide 27: Key Points
Key Points A new gold company: Production starting in Colombia 1.2m oz Indicated Gold Resource in Kenya Plans for production in Kenya but not a new company: Proven capacity to generate profits Active exploration Strong asset backing 27
Slide 28: 2010 – 2011 Key Objectives
2010 – 2011 Key Objectives Red Rock intends to INCREASE GOLD PRODUCTION and PLANT CAPACITY in Colombia Red Rock aims to START GOLD PRODUCTION in Kenya initially from tailings 28
Slide 29: Analyst and press comments
‘…..analysts believe the shares are worth over 20p…….investors looking for a way to benefit from current enthusiasm for gold should have a punt.’ Daily Mail – Midas Column, Joanne Hart, 26th Sept 2010 ‘Top-end scenario: NAV 61.59p per share’ Edison Investment Research, Charles Gibson, 22nd Sept 2010