Slide 2: 1H17 highlights: Recurring EBITDA €1,902m, Net Profit €450m
Recurring EBITDA: €1,902m, -5% YoY 62% decline YoY of hydro production in Iberia: 42% below historical avg. in 1H17 vs. 68% above in 1H16 Net Profit: €450m, -5% YoY Avg. cost of debt -40bp YoY, OPEX IV savings at €71m in 1H17 (27% above target) Net debt at €16.9bn by Jun-17 2016 dividend (€0.7bn) fu
Slide 3: Hydro production in 1H17 below historical average
Hydro Coefficient in Portugal: 2016/1H17 EDP Hydro Production in Iberia: 2016/1H17 (Deviation vs. avg. hydro year) (TWh) 91% 62% 6.7 45% 5.8 3.1 2.0 2.2 1.6 -36% -48% -66% 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 1H16 1H17 1H16 1H17 +68% -42% 12.5 -62% 4.7 Hydro production in 1H17
Slide 4: Recurring EBITDA in Iberia penalized by adverse hydro production
EBITDA Recurring EBITDA (€ million) (€ million) % Chg. YoY ForEx impact: -8% +20% 2,067 2.006 1.902 61 1,902 EDP Brasil 12% +31% Non recurring 17% items(1) ForEx EDP Renováveis 32% +11% impact: +3% 38% Recurring EBITDA 2,006 1,902 Generation & (2) -5% 31% Supply Iberia -43% 19% Networks 25% +3% 27%
Slide 5: 40bp decline in average cost of debt
Net Interest Cost (1) EDP 5-Year Bond Yield (2017 YTD) (€ million) (%) Latest Bond Issues (amount; maturity; yield) 202 196 2.0 185 179 €0.6bn; 6.7Y; 175 168 1.9% 1.5 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 USD1bn; 7.1Y; 3.7% 1H16 1H17 Net Interest -14% 1.0 398 343 0.9% Cost (1) (€m) Avg. Net Debt 16.9 -3% 16
Slide 6: EDPR tender offer timeline
Aug 3rd, 3pm(2) Aug 4th Aug 8th Euronext Special End of Offer Session & Results Offer Settlement Period Announcement The offer is voluntary and not subject to the fulfilment of any condition Delisting implies EDP to EDP may request the In case EDP holds >90% of maintain a permanent order delisting o
Slide 7: Guidance: Recurring EBITDA ~€3.6bn
Main drivers Guidance Weak hydro volumes Iberia 1H17 Recurring Gas distribution deconsolidation (most of 2H17) ~€3.6bn EBITDA Wind and hydro capacity increases Efficiency improvements Recurring Net Decline in avg. cost of debt > Recurring Net Profit Short term dilution effect from gas disposals (2H1
Slide 8: CMEC, electricity distribution regulation and judicial investigation
CMEC Calculation clearly defined by law, essentially based on historical data 1 final adjustment EDP to comply with existing contracts Public audition on June 22nd: ERSE proposes extension of regulatory period from 3 to 4 years Electricity Distribution 2 RoRAB: Premium vs. 10 year sovereign
Slide 9: Growth focused on renewables and regulated networks
Renewables Installed Capacity: Growth targets 2016-20 Electricity Transmission Concessions in Brazil Solar PV 8% # Lines 5 Wind 22% Built in 2016 & +3.5 GW Length (km) Onshore Secured 1,297 2016-20 Estimated Capex 70% 3.1 ($Rbn) CoD 2020-22 CoD 2016 2017-18 2019-20 Annual Revenues 494 GW RAP ($Rm) 0
Slide 10: Generation portfolio: low exposure to regulatory/environmental risks
Average Residual Useful Life of EDP’s Generation – 2020E Average Residual Useful Life of EDP’s by Technology(1) Generation Portfolio(1) (Years) Hydro CCGT Wind & Solar Coal with DeNOx Nuclear 48% 24 (33%) 30 (13%) 27 16 (42%) 21 (11%) 11 8 (1%) 0 5 10 15 20 25 30 35 Dec-05 Dec-20 Generation portfoli
Slide 11: Results Analysis
rede Results Analysis
Slide 12: Electricity demand and supply in Iberia
Electricity Demand and Supply in Iberia (1) (TWh) +1.0% 148 150 CCGT 11 +67% 18 Electricity demand: +1% 15 +83% Coal 27 (1) 34 Hydro production: -59% Hydro -59% 14 Wind 36 -12% 32 Wind production: -12% Nuclear 28 28 Coal and CCGT production: +76% (2) Other 27 28 -1 3 Net imports from Franc
Slide 13: EDP Generation Iberia production and average cost
EDP Generation Iberia – Production (1) Avg. Production Cost (TWh) (€/MWh) -14% +145% 19.6 Nuclear, 4% 33 -8% 16.8 Cog. & Waste 4% 28% Hydro(1) 64% -62% 14 +53% 49% Coal 28% CCGT +205% 18% 5% 1H16 1H17 1H16 1H17 Strong decline of the weight of hydro on production mix (28% in 1H17 vs. 64% in 1H16) Avg
Slide 14: EBITDA Generation & Supply Iberia
EBITDA Generation & Supply Iberia (€ million) -44% Avg. sourcing cost +77% 643 Energy management: wiped out on high pool prices 360 1H16 1H17 Weak performance in 1H17 following low hydro production and high pool prices 13
Slide 15: Regulated networks EBITDA and controllable costs
EBITDA - Regulated networks Controllable Costs(1) - Regulated networks (€ million) (€ million) Gas Iberia Electricity Spain Electricity Portugal +3% -3% 496 513 232 225 0% +15% 1% 1H16 1H17 1H16 1H17 Electricity Portugal: Slight YoY increase on RoRAB to 6.76%, 3% reduction on controllable costs
Slide 16: EDPR installed capacity and production
EDPR Installed Capacity Production (GW) (TWh) Brazil North America Europe vs. Long 633MW Under +1% = term avg. Construction +8% +9% +0.2 +0.1 10.1 14.5 9.4 +0.4 2% 13.3 2% 45% 48% 53% 50% Jun-16 Jun-17 Jun-16 Jun-17 Installed capacity +8%, due to US (+0.4GW) and Mexico (+0.2GW); more 0.6GW under con
Slide 17: EDPR EBITDA
EDPR EBITDA (€ million) ForEx impact: Other +1% Iberia +11% North America 719 648 +2% 16% 17% 35% 41% -7% 50% 42% +32% 1H16 1H17 North America: Forex +3%, production +21%, higher revenues from TEI/PTC and USD6m one-off in 1H17 Iberia: Production -9%; EBITDA Spain +1% (avg. selling price +12%); E
Slide 18: EDP Brasil EBITDA
EDP Brasil EBITDA EDP Brasil Recurring EBITDA (BRL million) (BRL million) Non recurring Recurring Hydro Generation & Other Pecém I Distribution +9% -15% 1.273 1.087 995 Gain on 278 1.087 Pantanal 397 257 +55% disposal 361 198 1.087 -45% 995 9% 377 +30% 492 1H16 1H17 1H16 1H17 Distribution: regulat
Slide 19: Opex by business area
Weight on Opex Business area Indicator YoY Change Main drivers Avg. MW: +6%; Avg. # contracts: +6% 56% Iberia Opex +1% Thermal prod.: +77%; Inflation Portugal +1.4% Core Opex/MW Average installed capacity: +8% 25% EDPR Flat (ex-forex): Opex ex-forex: +8% Opex in BRL Opex in BRL:+3% 19% EDP
Slide 20: Portugal electricity system regulatory receivables
Portugal: Electricity System Regulatory Receivables (€bn) Share of total receivables in the system 5.21 5.09 5.05 0.09 -0.20 -0.04 79% Other EDP 2.24 21% 1.00 1.08 Dec-15 1H16 2H16 Dec-16 1H17 Jun-17 2H17(E) Dec-17(E) Demand(1) (YoY Chg.) -0.4% +1.8% -0.9% Wind Factor (1.0=avg.) 1.09 0.91 0.99 Speci
Slide 21: Net expansion investment
(€ million) 1H16 1H17 ∆ Abs. Expansion Capex 460 463 +3 Change in Equipment EDPR seasonal effect (post 4Q commissioning) 409 350 -60 Suppliers Change in Consolidation 1H17: full consolidation of Mexico wind farm 1 216 +215 Perimeter Net Financial Investments (1) (804) (240) +564 1H16: Sale of
Slide 22: Change in net debt: Jun-17 vs. Dec-16
Change in Net Debt: Jun-17 vs. Dec-16 (€ billion) +0.7 -0.4 16.9 -0.8 +0.8 15.9 0.6 +0.1 1.0 Regulatory 1.0 Receivables €0.3bn VAT payment (refundable in 2H17) 15.0 €0.3bn income tax on 2016’s securitizations 15.9 Net Debt One-offs (3) FCF Ex-Reg. Reg. Adj, Net Dividends ForEx Net Debt Dec-16 Receiv
Slide 23: Debt by currency and maturity profile
EDP consolidated debt by currency: Jun-17 EDP consolidated debt maturity profile as of Jun-17 (%) (€ billion) Commercial Paper Hybrid Bond Avg. Debt Maturity: Other Subsidiaries EDP S.A. & EDP Finance BV PLN 4.6 years USD 3% 4.0 22% 3.5 3.0 2.5 BRL 7% 2.0 68% 1.5 EUR 1.0 0.5 0.0 2017 2018 2019 2020
Slide 24: Financial liquidity and refinancing needs
Financial liquidity (Jun-17) Refinancing needs 2017-2019 Cash & Equivalents: €2.0bn 2017: €2.2bn 6.625% GBP Bond maturing @ Aug-17 €0.32bn Available Credit Lines: €3.8bn 5.75% Eurobond maturing @ Sep-17 €0.75bn Revolving Credit Facility (Jun-19) €3.6bn Bank Loans and ECP €1.1bn Other RCF/Credi
Slide 25: Financial results and associates: 1H17 vs. 1H16
Financial Results & Associates: 1H17 vs. 1H16 (€ million of net cost) One-offs(1) Net interest costs: -14% YoY 412 (55) 40 10 (4) 363 Regulatory receivables related: 35% decline 16 on balance sheet amounts, lower returns Capitalised interest: Full commissioning of 396 388 hydro plants in Portu
Slide 26: Net profit: 1H17 vs. 1H16
Net Profit (€ million) 1H16 1H17 ∆% ∆ Abs. (€ million) % Chg. YoY EBITDA 2,067 1,902 -8% -164 Net Depreciations and -5% 739 710 -4% -29 Provisions 472 450 EBIT 1,327 1,192 -10% -135 Financial Results & (412) (363) +12% +50 Associated Companies Income Taxes 243 119 -51% -124 Recurring 517 493 Net pro
Slide 27: IR Contacts and Next Events
IR Contacts Miguel Viana, Head of IR Sónia Pimpão João Machado Maria João Matias Sérgio Tavares Noélia Rocha E-mail: ir@edp.pt Phone: +351 210012834 Visit EDP Website Next Events Site: www.edp.pt July 27th: Release of 1H17 Results Link Results & Presentations: Sep 8th: BPI Iberian Conference (Cascai