Prosafe SE · OSL:PRS

Prosafe — Q1 2007 Earnings Presentation

30 slides from Prosafe's earnings presentation, May 11, 2007

  1. Slide 1: First quarter 2007 results

    Slide 1: First quarter 2007 results

    Oslo, 11 May 2007 First quarter 2007 results

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    2 Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurat

  3. Slide 3: Agenda

    Slide 3: Agenda

    3 Agenda The quarter in brief Financial result for 1st quarter 2007 Business divisions: status, strategy and outlook Summary

  4. Slide 4: Q1 2007 in brief – Offshore Support Services

    Slide 4: Q1 2007 in brief – Offshore Support Services

    4 Q1 2007 in brief – Offshore Support Services New rig contracts: Safe Bristolia: 6-month contract MSV Regala: 7-month contract Safe Bristolia: 85-day contract extension Safe Caledonia and Safe Scandinavia in the yard Safe Caledonia Steadily increasing day rates

  5. Slide 5: Q1 2007 in brief – Floating Production

    Slide 5: Q1 2007 in brief – Floating Production

    5 Q1 2007 in brief – Floating Production New FPSO contract for Apache in Australia Breakthrough for in- house developed disconnectable turret Installation of FPSO Polvo and FPSO Umuroa according to plan FPSO Umuroa upon its arrival in New Zealand Growth continues at higher pace

  6. Slide 6: Income statement

    Slide 6: Income statement

    6 Income statement (Unaudited figures in USD million) Q1 07 Q4 06 Q1 06 2006 Operating revenues 88.2 103.2 75.1 365.6 Operating expenses (39.9) (41.2) (31.7) (157.9) Operating profit before depreciation 48.3 62.0 43.4 207.7 Depreciation (15.3) (17.3) (11.8) (57.7) Operating profit 33.0 44.7 31.6 150

  7. Slide 7: Balance sheet

    Slide 7: Balance sheet

    7 Balance sheet (Unaudited figures in USD million) 31.03.07 31.03.06 31.12.06 Goodwill 355.0 128.3 355.0 Rigs 753.8 355.4 763.4 Ships 631.0 354.6 538.7 Other non-current assets 271.5 8.3 262.4 Total non-current assets 2 011.3 846.6 1 919.5 Cash and deposits 141.4 218.8 147.2 Other current assets 64.

  8. Slide 8: Offshore Support Services

    Slide 8: Offshore Support Services

    8 Offshore Support Services (Unaudited figures in USD million) Q1 07 Q4 06 Q1 06 2006 Operating revenues 66.4 77.3 51.5 272.6 Operating expenses (28.7) (27.9) (19.7) (113.6) EBITDA 37.7 49.4 31.8 159.0 Depreciation (11.3) (13.0) (8.4) (41.7) Operating profit 26.4 36.4 23.4 117.3

  9. Slide 9: Floating Production

    Slide 9: Floating Production

    9 Floating Production (Unaudited figures in USD million) Q1 07 Q4 06 Q1 06 2006 Operating revenues 21.7 25.8 23.4 92.6 Operating expenses (8.5) (12.0) (10.6) (39.1) EBITDA 13.2 13.8 12.8 53.5 Depreciation (3.9) (4.2) (3.3) (15.7) Operating profit 9.3 9.6 9.5 37.8

  10. Slide 10: Cash flow

    Slide 10: Cash flow

    10 Cash flow (Unaudited figures in USD million) Q1 07 Q4 06 Q1 06 2006 Net cash flow from operating activities 42.9 19.1 111.2 232.8 Net cash flow from investing activities (107.1) (105.9) (157.2) (1 207.4) Net cash flow from financing activities 58.4 (49.3) (38.8) 818.2 Net cash flow (5.8) (136.1)

  11. Slide 11: Key figures

    Slide 11: Key figures

    11 Key figures Q1 07 Q4 06 Q1 06 2006 Operating margin 37.4 % 43.3 % 42.1 % 41.0 % Equity ratio 50.0 % 50.8 % 41.4 % 50.8 % Return on equity 8.2 % 11.3 % 27.3 % 16.8 % Return on capital employed 10.0 % 10.3 % 15.5 % 11.6 % Net interest bearing debt 704.6 491.7 165.3 491.7

  12. Slide 12: Shareholders

    Slide 12: Shareholders

    12 Shareholders AS AT 07.05.2007 No. of shares Ownership BW Group 55 932 990 24.3 % Folketrygdfondet 14 239 935 6.2 % Euroclear Bank (nom.) 12 790 881 5.6 % UBS (nom.) 10 763 750 4.7 % Cater Allen International Ltd 9 112 400 4.0 % State Street Bank & Trust (nom.) 6 993 352 3.0 % JP Morgan Chase Bank

  13. Slide 13: Financial capacity and capital return policy

    Slide 13: Financial capacity and capital return policy

    13 Financial capacity and capital return policy § High rig dayrates increase free cash flow Balance sheet supports future increased leverage Investments towards long-term contracts are ideal for debt financing New dividend policy total payments of at least NOK 5 per share in 2007 and 2008, followed

  14. Slide 14: Offshore Support Services – status

    Slide 14: Offshore Support Services – status

    14 Offshore Support Services – status Six-month contract for Safe Bristolia on the UKCS 85-day extension for Safe Bristolia at Sakhalin Four-month decommissioning contract for MSV Regalia Upgrade of Safe Caledonia and Safe Scandinavia Strong operational performance Safe Bristolia Number of new prosp

  15. Slide 15: Continuous increase in dayrates

    Slide 15: Continuous increase in dayrates

    15 Continuous increase in dayrates 250 000 Time charter equivalent. 200 000 MSV Regalia Safe Scandinavia 150 000 Safe Caledonia Safe Concordia Safe Bristolia 100 000 50 000 2003 2004 2005 2006 2007 2008 Time of contract award

  16. Slide 16: Offshore Support Services – contract status

    Slide 16: Offshore Support Services – contract status

    16 Offshore Support Services – contract status Safe Astoria Safe Bristolia Asia Safe Esbjerg Safe Caledonia North Sea/ Safe Scandinavia West Africa MSV Regalia Safe Concordia Safe Britannia Safe Lancia Gulf of Safe Regency Mexico Jasminia Safe Hibernia 1Q04 3Q04 1Q05 3Q05 1Q06 3Q06 1Q07 3Q07 1Q08 3Q

  17. Slide 17: Offshore Support Services – outlook

    Slide 17: Offshore Support Services – outlook

    17 Offshore Support Services – outlook Strong demand for available units Increasing dayrates going forward Available rigs will benefit from the increasing dayrates Interesting situation in 2008 with the renewal of the Mexico contracts – will result in increased earnings Prosafe is the dominant playe

  18. Slide 18: Floating Production – status

    Slide 18: Floating Production – status

    18 Floating Production – status FPSO contract for Apache in Australia First application of in-house developed disconnectable turret FPSO Polvo and FPSO Umuroa have arrived at their respective fields Significant increase in earnings after production has commenced

  19. Slide 19: Floating Production – status (cont)

    Slide 19: Floating Production – status (cont)

    19 Floating Production – status (cont) Strong competitive edge based on Unique patented in-house technology Solid project management experience Excellent operational track-record Capacity to conduct one additional conversion project as from late 2007 Capacity to support sustainable growth

  20. Slide 20: 109 floaters in the planning stages – 60-70 are likely to be FPSOs

    Slide 20: 109 floaters in the planning stages – 60-70 are likely to be FPSOs

    20 109 floaters in the planning stages – 60-70 are likely to be FPSOs Units/ 25 fields § 30 of the 109 projects are in 20 ultra-deepwater > 1 500 meters § Another 23 are in water depth 15 of 1000 - 1500 meters 10 § The remaining 56 projects are in water depth < 1 000 meters 5 § Order backlog of prod

  21. Slide 21: Recent FPSO contract awards

    Slide 21: Recent FPSO contract awards

    21 Recent FPSO contract awards Contract FPSO owner Field operator Field / location Type of contract Lease period award Jul 2005 Modec Petrobras Espadarte Sul, Brazil 8 + 4 yrs Aug 2005 Saipem Petrobras Golfinho, Brazil 9 + 3 yrs Sep 2005 Prosafe Devon Polvo 7 + 8 yrs Nov 2005 Prosafe AWE Tui, New Ze

  22. Slide 22: Disconnectable turret

    Slide 22: Disconnectable turret

    22 Disconnectable turret First application for Apache Opens new geographical areas for Prosafe’s FPSOs Typhoon/hurricane areas such as Australia and GoM Strong competitive advantage Reduced cost compared with solutions from third parties Better control with lead time Increased control during project

  23. Slide 23: FPSO with drilling capacity (FDPSO)

    Slide 23: FPSO with drilling capacity (FDPSO)

    23 FPSO with drilling capacity (FDPSO) Developed FPSO with drilling capacity Cost-efficient solution to develop deepwater marginal fields Modular drilling technology Earlier production

  24. Slide 24: Floating Production - contract status

    Slide 24: Floating Production - contract status

    24 Floating Production - contract status FPSO Australia Apache, Australia è 2023 FPSO Brazil Petrobras, Brazil è 2023 LoI è 2024 Umuroa NZOP, New Zealand è 2017 Polvo Devon, Brazil è 2022 Abo Agip, Nigeria Espoir Ivoirien CNR, Angola Canadian Natural Resources, Ivory Coast è 2022 Petr. Nautipa (1) V

  25. Slide 25: Status FPSO Polvo and FPSO Umuroa

    Slide 25: Status FPSO Polvo and FPSO Umuroa

    25 Status FPSO Polvo and FPSO Umuroa Both vessels have arrived at their respective fields Installation and commissioning Estimated time of start-up: Q2 2007 FPSO Polvo

  26. Slide 26: Status FPSO Cidade de São Mateus for Petrobras

    Slide 26: Status FPSO Cidade de São Mateus for Petrobras

    26 Status FPSO Cidade de São Mateus for Petrobras Contract awarded 11 December 2006 Conversion of the VLCC M/T Navarin Project team in place Engineering in progress Long lead items have been ordered M/T Navarin Vessel will arrive at conversion yard in June 2007 Target arrival in field Q4 2008

  27. Slide 27: Status FPSO for undisclosed client (LOI)

    Slide 27: Status FPSO for undisclosed client (LOI)

    27 Status FPSO for undisclosed client (LOI) Conversion of the VLCC M/T Europe Project team in place Engineering started Commitments made for long lead items (covered by LOI) Vessel in conversion yard early Q3 2007 Target arrival in field Q4 2008 M/T Europe

  28. Slide 28: Status FPSO for Apache

    Slide 28: Status FPSO for Apache

    28 Status FPSO for Apache Conversion of the Aframax M/T Kudam Application of in-house developed disconnectable turret Project team in place Engineering started Commitments made for long lead items Vessel in conversion yard M/T Kudam early Q3 2007 Target arrival in field Q4 2008

  29. Slide 29: Floating Production – outlook

    Slide 29: Floating Production – outlook

    29 Floating Production – outlook Continued high level of bidding activity Well positioned in high growth markets Strong competitive edge based on in-house technology and project experience Capacity to commence one additional FPSO FPSO Umuroa conversion in the second half of 2007 Growth continues at

  30. Slide 30: Summary and outlook

    Slide 30: Summary and outlook

    30 Summary and outlook Rig dayrates continue to climb Strongly positioned in the top segment of the FPSO market Expect strong improvement in earnings in 2007, 2008 and 2009

Source: Internet Archive copy of prosafe.com

More decks from Prosafe SE

All 115 Prosafe decks