Black Cat Syndicate Ltd. · ASX:BC8

Black Cat Syndicate — RIU Explorers Conference (February 2024)

34 slides from Black Cat Syndicate's conference presentation, February 2024

  1. Slide 1: Paulsens Refurbishment - off to a strong start

    Paulsens Refurbishment - off to a strong start February 2024

  2. Slide 2: Disclaimer, distribution and disclosure

    Disclaimer, distribution and disclosure Disclaimer and not for US distribution Competent Person’s Statements This presentation includes forward-looking statements including, but not limited to, comments regarding the timing The information in this announcement that relates to geology, exploration re

  3. Slide 3: Creation of a dominant player in 3 prolific gold districts

    Creation of a dominant player in 3 prolific gold districts • Sequential development strategy to >150,000oz pa production Paulsens 177koz / $110.6M cf / +4 yrs Underground Resource: 406koz @ 9.5g/t • High-grade mines with large and growing Resource base Only processing facility within 400km First gol

  4. Slide 4: Low capital, internal funding to build substantial value

    Low capital, internal funding to build substantial value Operation Paulsens 1 Coyote 2 Kal East 3 Strategy Land Size ~1,875 km2 ~820 km2 ~1,000 km2 >3,600 km2 - prime discovery potential Resources 0.55Moz @ 4.0g/t Au 0.65Moz @ 5.5g/t Au 1.3Moz @ 2.1g/t Au 2.5Moz @ 2.9g/t Au (growing) Initial Product

  5. Slide 5: Corporate & funding overview

    Corporate & funding overview Corporate Information (14 Feb 2024) $60m funding package to restart Paulsens1 Shares on issue 306M Options 23.7M Convertible Notes ($9M): Performance rights 6.5M • Hong Kong based investment holding company, Sundy Service Group Ltd (‘Sundy’) Market capitalisation (@ $0.2

  6. Slide 6: Paulsens Gold Operation

    1 PAULSENS GOLD OPERATION Restart to Drive Growth

  7. Slide 7: Paulsens - cornerstone operation to drive cashflow & growth

    Paulsens - cornerstone operation to drive cashflow & growth ~1,875km2 of highly prospective ground Well maintained 450ktpa processing facility Dewatered and ventilated underground mine One of Australia’s highest-grade deposits - 406koz @ 9.5g/t1 Only gold processing facility within 400km Robust rest

  8. Slide 8: Paulsens - more than just one Ore source

    Paulsens - more than just one Ore source • Main Zone - thick quartz & sulphide shear zone: • > 2.7km plunge (open) • 1Moz @ ~1,000oz/vm (historical production) • 100vm extension identified • Extensive unmined opportunities adjacent to decline • Eastern Zone - parallel mineralised structure • High gr

  9. Slide 9: Paulsens - improved study outcomes

    Paulsens - improved study outcomes Project Metric Units July 2023 November 2023 Improvement % Resources koz 328 406 24% Mined Gold koz 136.4 176.5 29% Met Recovery % 89.9 92.4 3% Recovered Gold koz 122.7 163 33% Initial Mine Life (growing) Years 3.0 4.2 31% Gold Price $/oz 2,900 2,900 - Gold Sales $

  10. Slide 10: Paulsens - "there's gold everywhere"

    Paulsens - “there’s gold everywhere” • Numerous unmined high-grade veins, include: • 1.50m @ 53.60g/t Au • 4.50m @ 23.35g/t Au • 2.70m @ 23.00g/t Au • 1.70m @ 26.40g/t Au • 5.0m @ 10.20g/t Au • 1.40m @ 34.34g/t Au • 3.40m @ 75.78g/t Au - immediate mining opportunity with airleg optimisation • Many m

  11. Slide 11: Paulsens - refurbishment underway

    Paulsens - refurbishment underway Low restart risk: • Established infrastructure and long operating history • Independently reviewed, detailed refurbishment plan • Independent progress supervision and internal controls • Key management & maintenance positions in place • Long lead items ordered • Ear

  12. Slide 12: Paulsens - refurbishment underway

    Paulsens - refurbishment underway Crushing circuit: 100tph – proof run (operational) Primary crusher - pan feeder motor replacement underway CIL tanks: 7x 150m3 - steel ordered, agitators tested Gravity tower – Knelsons to be changed out 1MW ball mill – liners and lifters ordered ASX: BC8 | Feb 2024

  13. Slide 13: Paulsens - Belvedere >2.5km of high-grade Au at surface

    Paulsens - Belvedere >2.5km of high-grade Au at surface • Potential for a Paulsens-scale deposit: • 6.5km from plant on Mining Lease • Historical handheld mining from pre-WWII • >2.5km trend, only ~100m drilled • Current Resource: 30koz @ 6.6g/t Au • 20koz underground included in November 2023 Study

  14. Slide 14: Paulsens - huge exploration upside

    Paulsens - huge exploration upside • Paulsens gold endowment ~1.4Moz @ 7.5g/t Au • +1Moz deposits are not formed in isolation • The region has seen limited drilling • Potential for a significant gold at multiple deposits: • Belvedere • Paulsens Repeat • Big Sarah • Mt Clement • Eastern Zone • Electr

  15. Slide 15: Paulsens - consolidation of Cu-Au tenure

    Paulsens - consolidation of Cu-Au tenure • Mt Clement hosts 13.9kt Sb, 1.6kt Cu, 18.7kt Pb, 66koz Au and 1.5Moz Ag (contained metal) • Region is poorly explored for base-metal mineralisation • Boolaloo acquisition - 700km2 strategic package • Synergies with Mt Clement polymetallic deposit • Multiple

  16. Slide 16: Coyote Gold Operation

    2 COYOTE GOLD OPERATION High-grade gold with scale and exploration potential 16

  17. Slide 17: Coyote - high-grade Resource and untested multi-metal potential

    Coyote - high-grade Resource and untested multi-metal potential 819km2 of highly prospective ground One of Australia’s highest-grade underground deposits - 356koz @ 14.6g/t Au Robust Scoping Study - $176M cashflow @ $2,900/oz Installed processing facility and camp to be expanded with owned mill Only

  18. Slide 18: Coyote - conservative study outcomes

    Coyote - conservative study outcomes • Robust +5-year base case July 2023 Scoping Study Highlights • 372koz @ 4.8g/t Au Resources not yet considered • Sandpiper underground to be assessed 1.7Mt Ore Mined 3.6g/t Au Ore Grade (UG 5.4g/t; OP 2.8g/t; SP 1.7g/t) • Mined underground grade - 5.4g/t Au • On

  19. Slide 19: Coyote Central - one of Australia's highest-grade deposits

    Coyote Central - one of Australia’s highest-grade deposits Open Pit 49koz @ 2.8g/t Au 102koz @ 11.4g/t Au excluded from study Underground 125koz @ 5.4g/t Au ASX: BC8 | Feb 2024 Refer to BC8 ASX announcement 16/01/23, 18/07/23 and Resource tables in the Appendices 19

  20. Slide 20: Kal East Gold Project

    3 KAL EAST GOLD PROJECT 1.3Moz Resource in Australia’s premier gold mining region 20

  21. Slide 21: Kal East - development ready with upside

    Kal East - development ready with upside 3rd largest holding (+1,000km2) in premier gold mining region 1.3Moz @ 2.1g/t Au Resource, within 50km of Kalgoorlie July 2023 Study Update - $168M cashflow @ $2,900/oz 800ktpa processing facility designed, permitted, major components acquired Approvals in pl

  22. Slide 22: Kal East - key study outcomes

    Kal East - key study outcomes July 2023 PFS Study Update - Highlights • Base case production target of 302koz over 5.5 years • 694koz @ 2.0g/t Au Resources not yet considered 4.8Mt Ore Mined • Ore Reserves - 80% of production 1.9g/t Au Ore Grade (OP: 1.7g/t; UG: 3.2g/t) • Average of 56kozpa, with hi

  23. Slide 23: Enterprise Value / Annual Production Ounces

    Production re-rating potential • Average Enterprise Value (“EV”) per production ounce for Australian gold producers is $4,740/oz • Notional EV’s based on peer average: • 50koz @ $4,740 = $240M • 100koz @ $4,740 = $480M • 150koz @ $4,740 = $720M $16,000 $14,000 Enterprise Value / Annual Production Ou

  24. Slide 24: Investment Summary

    Investment Summary • Sequential development strategy to >150,000oz pa production Paulsens 177koz / $110.6M cf / +4 yrs Underground Resource: 406koz @ 9.5g/t • High-grade mines with large and growing Resource base Only processing facility within 400km First gold second-half 2024 • Large tenure, outst

  25. Slide 25: Thank you

    Thank you Level 3, 52 Kings Park Road, West Perth WA 6005 PO Box 184, West Perth WA 6872 +61 (0)458 007 713 admin@bc8.com.au www.bc8.com.au ABN 63 620 896 282 25

  26. Slide 26: Demonstrated ability to acquire, find & produce Au

    Demonstrated ability to acquire, find & produce Au • Black Cat has acquired and discovered >2.5Moz gold 4000000 • Averaging >400kozpa growth • ~50:50 split acquisition to discovery Discovered Acquired 3500000 • Kal East: • 1.3Moz within 50km of Kalgoorlie 3000000 • Significant discovery potential •

  27. Slide 27: Paulsens - Main Zone is a cash cow

    Paulsens - Main Zone is a cash cow • Main Zone - thick quartz shear with semi- continuous high-grade sulphide zones: • 1Moz @ 6.9g/t Au (2005-2017), ~1,000oz/vm • remains open down plunge • Significant value potential discovered: • high-grade up to 200m below current development • Extensional drilli

  28. Slide 28: Paulsens - substantial infrastructure, ready to restart

    Paulsens - substantial infrastructure, ready to restart ROM pad Crushing screening Workshop RO plant Laboratory Mine Rescue CIL plant Administration Power station 1 Stores Raw water dams Electrical workshop Wastewater treatment ASX: BC8 | Feb 2024 28

  29. Slide 29: Coyote Central - significant regional potential

    Coyote Central - significant regional potential • Mineralisation is controlled by intersection of NW/NE faults and folded stratigraphy • Largest Tanami gold deposits occur in fold hinges (e.g. Callie +20Moz) • New geology model and reimaging of seismic data highlights multiple blind anticlines Lewis

  30. Slide 30: Gold Resource Summary

    Gold Resource Summary Measured Resource Indicated Resource Inferred Resource Total Resource Mining Centre Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal (‘000s) (g/t Au) (‘000s oz) (‘000s) (g/t Au) (‘000s oz) (‘000s) (g/t Au) (‘000s oz) (‘000s) (g/t Au) (‘000s oz) Kal Ea

  31. Slide 31: Polymetallic Resources Summary

    Polymetallic Resources Summary Resource Tonnes Zone Au (g/t) Cu (%) Sb (%) Ag (g/t) Pb (%) Au (koz) Cu (kt) Sb (kt) Ag (koz) Pb (kt) Category (‘000) Inferred 415 - 0.4 0.2 76.9 - * 1.6 0.7 1,026 - Western Total 415 - 0.4 0.2 76.9 - * 1.6 0.7 1,026 - Inferred 794 - - 1.7 17.0 2.4 * - 13.2 434 18.7 Ea

  32. Slide 32: Ore Reserves

    Ore Reserves Proven Reserves Probable Reserves Total Reserves Operation Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal (‘000s) (g/t Au) (‘000s oz) (‘000s) (g/t Au) (‘000s oz) (‘000s) (g/t Au) (‘000s oz) Kal East Open Pit - - - 3,288 1.8 193 3,288 1.8 193 Underground - - - 437 3.6 50 437 3.

  33. Slide 33: Long Term Incentive – Employee Performance Rights

    Long Term Incentive – Employee Performance Rights The performance rights are designed as Long-Term Incentives (“LTI’s”) to align the Senior Leadership Team with the creation of shareholder value over the long term and form part of the Company’s remuneration and retention strategy. Key pillars are in

  34. Slide 34: Supporting Information

    Supporting Information Resources Reserve / Production Target Production Measured Resource Indicated Resource Inferred Resource Total Resource Proven Probable Target Total Reference Year Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal