  1. Slide 1: Warren Resources, Inc. Investor Update

    Warren Resources, Inc. August 21, 2008 Investor Update Investor Update

  2. Slide 2: Disclaimer

    Disclaimer Cautionary Note to U.S. Investors: This presentation includes "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. The opinions, forecasts, projections or other stateme

  3. Slide 3: Introduction

    Introduction i

  4. Slide 4: Investment Highlights

    Investment Highlights Large, high-quality resource base with 53 MMBO net proved oil reserves. Huge remaining oil-in-place of 550 MMBO and 1.0 TCF of potential gas reserves Long-lived oil and gas reserves (+20 yrs) Low-risk development drilling program in giant Wilmington Oil Field in California and

  5. Slide 5: Warren Resources Operational Overview

    Warren Resources Operational Overview Net proved reserves with a PV-10 value of $1.05 billion (using $86.21 realized price per Bbl and $5.02 per MCF at 12/31/07), accounts for 10% of net acreage Interests in 483 gross (298 net) producing wells and are the operator or joint-operator in over 90% of th

  6. Slide 6: Proved and Unrisked, Unbooked, Potential Reserves

    Proved and Unrisked, Unbooked, Potential Reserves Washakie CBM – Net Proved Reserves 34 Bcfe Unrisked, Unbooked Potential Reserves 1.1 Tcfe Potential ASP: TBD Washakie CBM – Unrisked, Unbooked Potential Net Gas Reserves at 1 Bcf per CBM well 750 Bcfe Wilmington – Unrisked, Unbooked Potential Net Oil

  7. Slide 7: Business Strategy

    Business Strategy Exploit existing properties through the drillbit – Increase proved reserves by drilling 1,200 identified Atlantic Rim CBM wells and 450 Wilmington oil wells – Increase production by 70% or more in 2008 and continue to deliver significant organic production growth in 2009 and beyond

  8. Slide 8: Experienced Operating Team

    Experienced Operating Team Warren has assembled a top-notch technical team of 10 petroleum engineers with considerable experience in our operating regions including: Name Title Years Operating Experience Regional Focus Area of Expertise Lloyd G. Davies Chief Executive – Warren E&P 45 California & Wy

  9. Slide 9: Focused Operations - Wilmington Oil Field

    Focused Operations - Wilmington Oil Field

  10. Slide 10: The Wilmington Oil Field

    The Wilmington Oil Field The Wilmington Field is the third largest oil field in the United States, having produced 3.5 billion barrels of oil (40% of OOIP) Prudhoe Bay in Alaska is the largest oil field and the East Texas oil field is the second largest According to the EIA as of 2002, approximately

  11. Slide 11: Wilmington Field Geometry

    WTU (Warren) Structure is 18 ½ mile long, highly faulted, asymmetrical anticline Wilmington Fault Wilmington Field Geometry NWU (Warren) 6 Wilmington Field Geometry

  12. Slide 12: Wilmington Townlot Unit (WTU)

    Wilmington Townlot Unit (WTU) Unitized in 1972 by Exxon Warren holds 98.6% WI, 82.3% NRI 34 MMBO net booked proved reserves at 12/31/2007. Enhanced secondary recovery and significant ASP potential not yet booked. Multiple productive sands in reservoirs (Tar, Ranger, Upper Terminal, UP 237, Ford & ba

  13. Slide 13: Vertical vs. Horizontal Tar Wells

    Vertical vs. Horizontal Tar Wells Cumulative Oil Production (from Simulation) Simulation Results Per Well •Peak Rates Increase 300-400% •Oil Recovery Improves 400% •Drilling Costs Increase 50% over vertical wells •Fewer wells required Cumulative Oil Production Increased Recovery Cumulative Days on P

  14. Slide 14: PeriScope Geosteering of Hz Wells at WTU

    PeriScope Geosteering of Hz Wells at WTU Planned Well Path Actual Well Path Forecasted Formation Top 9

  15. Slide 15: Wilmington Townlot Unit

    Wilmington Townlot Unit Two drilling cellars constructed and operational Two rows of wells in each cellar (140 wells/cellar) Zoning permit to drill up to 540 wells from cellars Production equipment below ground level Drilling Rig skid-mounted over cellar allows rapid rig moves All fluid production a

  16. Slide 16: WTU Oil Production Since 01/2004

    WTU Oil Production Since 01/2004 0 1,000 2,000 3,000 06/08 04/2007 04/2006 04/2005 04/2004 BOPD Warren takes over operatorship of WTU Nabors 411 starts work Ensign 518 starts work Historic Production Decline 12

  17. Slide 17: WTU Key Projects Underway

    WTU Key Projects Underway WTU 10-inch oil sales pipeline (20 MBO/D capacity) to ConocoPhillips Carson refinery became operational in March 2008 to eliminate trucking oil Six Co-Gen, Micro-turbines activated to convert waste gas to net income Installed Automated Well Testers to improve accuracy and r

  18. Slide 18: North Wilmington Unit

    North Wilmington Unit Unitized for Water Flood in 1977 by Sun Oil Produced 37 MMBO (24% of OOIP) Net proved reserves remaining of 19 MMBO in Ranger zone Warren holds 100% W.I. and 84.6% N.R.I. Warren has focused on operational improvements and returning idle wells to production/injection since acqui

  19. Slide 19: ASP Flood Basics

    ASP Flood Basics WHY USE ASP? WHAT IS ASP? – ASP = Alkaline-Surfactant-Polymer – Alkaline reacts with certain oils to form surfactant in-situ reduces surfactant costs – Surfactant reduces oil/water interfacial tension (IFT) reduces capillary forces that hold oil in pore space – Polymer improves mobi

  20. Slide 20: Surtek – EOR Expertise Since 1978

    Surtek – EOR Expertise Since 1978 Warren is using Surtek, a Golden, Colorado based engineering company, to assist in the ASP project design and evaluation. Major Surtek ASP projects include: 31% of OOIP (N/A Mbbls) Saertu II Sandstone Daqing, China 28% of OOIP (1,143 Mbbls) Minnelusa Sandstone Cambr

  21. Slide 21: Wilmington Field Projects

    Wilmington Field Projects Sun’s Advanced Recovery Group – Lab Work (1975-1976) – Core flood using NWU #3-8 showed 0.3 pore volume (1% NaOH and 1000 ppm biopolymer ) yielded incremental recovery of 15%-20% DOE and City of Long Beach Alkaline Pilot of Ranger Zone in Fault Block VII (1980- 1983) – Resu

  22. Slide 22: Surtek Wilmington Linear Core Flood

    Surtek Wilmington Linear Core Flood Linear core flood sensitivity: – Surfactant alone = 5% incremental recovery – Polymer alone = 4% incremental recovery – Surfactant + Polymer = up to 37% incremental recovery 18

  23. Slide 23: California Operations Summary

    California Operations Summary Quality Assets with huge remaining potential oil-in-place of 550 MMBO Newly proven technologies and high oil prices should enable substantial remaining reserves to be captured economically Construction phase of cellar 1 and 2 completed in Q2 2008 Production volumes have

  24. Slide 24: Washakie Basin – Atlantic Rim CBM

    Washakie Basin – Atlantic Rim CBM Located on the eastern rim of the Washakie Basin comprising 217,615 gross (121,997 net) acres Development of 141,000 gross acres in preferential CBM drilling fairway through a 50/50 joint venture with Anadarko – Managed jointly through operating subcommittee with eq

  25. Slide 25: Atlantic Rim CBM Type Curve

    Atlantic Rim CBM Type Curve Cellar 1 Cellar 2 Cellar 3 ATLANTIC RIM TYPE WELL PROFILE 1 10 100 1000 10000 0 24 48 72 96 120 144 168 192 216 240 Time (months) Gas Rate (Mcfd) Water Rate (Bpd) 21

  26. Slide 26: Rocky Mountain Pipelines

    Rocky Mountain Pipelines 22

  27. Slide 27: Financial Overview

    Financial Overview 23

  28. Slide 28: Capitalization

    Capitalization ($Millions) 24 $ 406.9 $ 472.8 Total capitalization 350.3 379.8 Total stockholders' equity 347.6 378.5 Common stock and additional paid in capital $2.7 $1.3 Preferred stock Stockholders' equity: $ 56.6 $ 93.0 56.0 92.7 Long Term Debt and other long-term liabilities 0.6 0.3 Current por

  29. Slide 29: Historical Financial Performance

    2008 2007 Net Production Natural Gas (MMcf) 656.6 249.5 Oil (MBbls) 252.0 211.1 Equivalents (MMcfe) 2,168.8 1,516.3 Revenues: Oil and Gas Sales 34.2 $ 13.3 $ Interest and other income 0.2 0.6 Total Revenues 34.4 13.9 Costs and Operating Expenses: Lease Operating Expense & taxes 6.5 5.2 Depreciation,

  30. Slide 30: Defined Growth

    Defined Growth NWU 11% WTU 40% Atlantic Rim 49% WTU 46% Atlantic Rim 36% NWU 18% Planned 2008 Gross Wells of 209 (104.1 net) 2008 Drilling Budget of $140 Million 26 and Recompleted Wells Total Gross Wells Net Capex Atlantic Rim 155 50.7 $50 WTU 42 41.4 65 NWU 12 12.0 25 TOTAL 209 104.1 $140 Planned

  31. Slide 31: Warren Resources, Inc.

    Warren RESOURCES, Inc.