Faraday Copper Corp · TSX:FDY

Faraday Copper — Investor Presentation (September 2023)

36 slides from Faraday Copper's investor presentation, September 2023

  1. Slide 1: Developing U.S. Copper Resources

    Developing U.S. Copper Resources CORPORATE PRESENTATION September 2023

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Some of the statements in this presentation, other than statements of historical fact, are “forward-looking statements” and are based on the opinions and estimates of management as of the date such statements are made and are necessarily based on estimates and assumptions that a

  3. Slide 3: Faraday Copper: Highlights

    FARADAY COPPER: HIGHLIGHTS Building a Premier North American Copper Company ASSET STRATEGY CATALYSTS ▪ Copper Creek in Arizona is a large ▪ Growing the resource though ▪ 20,000 m Phase III drill program undeveloped project with over 4.2 definition of high-grade zones and commencing (Q4 2023) Blbs of

  4. Slide 4: Faraday Copper: Compelling Investment

    FARADAY COPPER: COMPELLING INVESTMENT Low Capital Intensity, Long Life U.S. Copper Project Owned by a Developer Initial Capital Intensity vs Mine Life (a, b) Enterprise Value / M&I Mineral Resources (b) 60¢ 37.1¢ 17.6¢ 15.0¢ 10.0¢ Copperwood (US¢/lb CuEq Mine Plan Inventory) Carmacks Copper 50¢ Flat

  5. Slide 5: Corporate Overview

    CORPORATE OVERVIEW TSX-listed Under the Symbol “FDY” Analyst Coverage Ownership 41.0% 33.4% Strategic Shareholders: 33.4% Dalton Baretto Institutions: 22.8% Roger Bell Insiders: 2.8% Connor Mackay Other / Retail: 41.0% 2.8% 22.8% Alex Terentiew Top Strategic Shareholders Arun Lamba Lundin Family | M

  6. Slide 6: Copper Creek: Top Mining Jurisdiction

    COPPER CREEK: TOP MINING JURISDICTION Arizona Ranked Seventh for Investment Attractiveness (Fraser Institute, 2022) Pinto Valley Arizona, USA ARIZONA Globe-Miami ▪ 100% owned property in Pinal County, Resolution Arizona Ray Morenci ▪ Near mining and service hubs with Cactus Copper Creek Safford Lone

  7. Slide 7: Copper Creek: Large Land Package

    COPPER CREEK: LARGE LAND PACKAGE ▪ ~65 km2 Property offers strategic benefits ▪ Mineral claims include patented claims, unpatented claims and state prospecting permits ▪ Optionality for infrastructure placement ▪ Solar power generation potential ▪ Ranch includes ~26,000 acres of surface rights throu

  8. Slide 8: Updated Mineral Resource (2023)

    UPDATED MINERAL RESOURCE (2023) MRE is Supported by >200,000 m of Drilling, 83% of Resource is M&I ▪ Drillhole database includes Phase I drill Tonnes Cu Mo Ag CuEq2 Cu Mo Ag CuEq2 results (as of Oct 27, 2022) Category (Mt) (%) (%) (g/t) (%) (Mlbs) (Mlbs) (Moz) (Mlbs) ▪ Updated geological model Open

  9. Slide 9: Significant Resource with Upside

    SIGNIFICANT RESOURCE WITH UPSIDE Open Pit and Underground Mineral Resource Open Pit Grade Distribution A A Copper Prince Childs Aldwinkle A’ 1,300RL Globe Mammoth N Copper 1,200RL Prince Marsha OPEN PIT 1,100RL Old Childs Reliable Alwinkle 1,000RL Mammoth 100 metres 900RL A’ Bald 500 metres Undergro

  10. Slide 10: PEA Highlights

    PEA HIGHLIGHTS Life-of-Mine Average Annual Life-of-Mine Payable Measured and Indicated 51,100 tpa Payable CuEq 1 Production 3.4 Blb CuEq 1 Production 4.2 Blb Copper Mineral Resource a KEY FINANCIAL DATA ANTICIPATED PRODUCTION PROFILE Post-tax NPV(7%) $713 million Mine Life b 32 years Tonnes Milled c

  11. Slide 11: Mine Design Overview

    MINE DESIGN OVERVIEW Integrated Mine Plan Provides Optionality and Scalability ISOMETRIC VIEW Open Pit Open pit mining enables rapid payback on LOOKING NORTHEAST 154 Mt at 0.39% CuEq 1 initial capital and funds development of bulk underground mine High-grade = 28 Mt at 0.98% CuEq Globe / Marsha Medi

  12. Slide 12: Resource Potential: Phase II Results (Post-PEA)

    RESOURCE POTENTIAL: PHASE II RESULTS (POST-PEA) Drill Hole Assay Results Copper Grade (%) >2.00 1.00 0.70 High-grade High-grade 0.50 intercept intercept 0.31 below below 0.25 Copper Copper 0.13 Prince Giant 0.05 0.00 Block Model Copper Grade (%) >2.00 1.00 0.70 0.50 0.31 0.25 0.13 Potential for 0.00

  13. Slide 13: Resource Expansion Potential

    RESOURCE EXPANSION POTENTIAL Significant Growth Opportunities Rum ~4,000 metres Globe Copper Childs Marsha Prince Aldwinkle Potential for Old expansion of open Reliable Mammoth Bald pit mineralization, ISOMETRIC VIEW which remains LOOKING NORTHEAST open laterally and at depth American Eagle Potentia

  14. Slide 14: Targeting New Discoveries

    TARGETING NEW DISCOVERIES Significant Growth Opportunities in an Underexplored District ▪ Integration of new data is driving target Holy Joe Fault generation and prioritization: airborne geophysics, hyperspectral data, and new field mapping ▪ Multiple untested breccia and porphyry targets across the

  15. Slide 15: Environmental & Stakeholder Engagement

    ENVIRONMENTAL & STAKEHOLDER ENGAGEMENT Building a Framework for Data Collection and Engagement ENVIRONMENT STAKEHOLDER ENGAGEMENT Baseline environmental monitoring Commitment to open dialogue and systems in place for data collection to support for the local economy and social support permitting proc

  16. Slide 16: Opportunities and Next Steps

    OPPORTUNITIES AND NEXT STEPS Phase II drill Gold by-product Asset Phase III drill District program potential scalability program exploration ▪ Recent results ▪ Targeting potential ▪ Potential for ▪ 20,000 m drill ▪ New airborne demonstrate gold inclusion in production rate program geophysical and po

  17. Slide 17: Contact Information

    Developing U.S. copper resources ▪ Scarcity of development-ready copper projects CONTACT INFORMATION Suite 250, 200 Burrard Street Vancouver, BC Canada www.faradaycopper.com ▪ Large undeveloped Mineral Resource STACEY PAVLOVA, CFA VP Investor Relations ▪ Significant exploration upside 778-730-1067 i

  18. Slide 18: Appendix

    “’| FARADAY COPPER APPENDIX —

  19. Slide 19: Bringing a Senior Mining Company Expertise

    BRINGING A SENIOR MINING COMPANY EXPERTISE Faraday has Drawn Senior Mining Company Talent Who Know Good Projects with Real Potential Management Board of Directors Graham Richardson Dr. Thomas Bissig Audra Walsh Robert Doyle Paul Harbidge Chief Financial Officer VP Exploration Russell Ball Prev. CEO,

  20. Slide 20: Copper Creek: Mineral Resources (2023)

    COPPER CREEK: MINERAL RESOURCES (2023) Grade Contained Metal Category Tonnes (Mt) Cu Mo Ag CuEq 2 Cu Mo Ag CuEq 2 (%) (%) (g/t) (%) (Mlbs) (Mlbs) (Moz) (Mlbs) Open Pit (OP) Measured 67.2 0.48 0.008 1.2 0.51 710.5 12.5 2.6 751.1 Indicated 59.9 0.31 0.008 0.6 0.33 412.9 10.1 1.1 440.5 M&I 127.1 0.40 0

  21. Slide 21: Copper Creek: Notes to Mineral Resources

    COPPER CREEK: NOTES TO MINERAL RESOURCES ▪ CuEq: Copper equivalent; g/t: Grams per tonne; Mlb: Million pounds; Moz: Million troy ounces; Mt: Million tonnes ▪ The mineral resources in this estimate were prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Stand

  22. Slide 22: PEA: Geotechnical Assessment

    PEA: GEOTECHNICAL ASSESSMENT Data Collected for Open Pit and Underground Mine Design ▪ Geotechnical core logging ▪ Geomechanical data ▪ Fracture orientation ▪ Rock mass classification Pit slope stability assessment Underground caveability assessment ▪ Geologic structure domaining confirmed confirmed

  23. Slide 23: Metallurgical Summary

    METALLURGICAL SUMMARY High Metal Recoveries and Clean Concentrate Recovery (%) 2023 Test work was assimilated with the historical test work to Domain Cu Mo Ag form the basis of the process design criteria for the PEA Oxide 75.0% n/a n/a Transitional 74.7% 70.9% 66.9% ▪ High copper recovery from sulp

  24. Slide 24: Processing Flowsheet

    PROCESSING FLOWSHEET Grinding Circuit Co–Mo Rougher Flotation and Regrind Co–Mo Cleaner Primary Flotation Open Pit Crusher Sag Mill Ball Mill Sulphide Stockpile Co–Mo Radial Stacker Concentrate 5-Stage Mo Thickener Tailings Thickening Cleaner Flotation & Filtering Mo Dry Stack Tailings Rougher Mo Co

  25. Slide 25: Mine Production Schedule

    MINE PRODUCTION SCHEDULE Life-of-Mine Processed Material Total Processed Material by Material Type 18 16 Open Pit Sulphide Transitional 14 Underground Sulphide Oxide Quantity (million tonnes) 12 10 8 6 4 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Years

  26. Slide 26: Open Pit Mine Production Schedule

    OPEN PIT MINE PRODUCTION SCHEDULE Mined Material by Period 30 Copper Prince Mammoth Globe Old Reliable 25 Marsha Bald / Jailhouse Rum Underground - Development 20 Underground - Keel Underground - American Eagle Quantity (Mt) Waste 15 10 5 - -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

  27. Slide 27: Underground Mine Production Schedule

    UNDERGROUND MINE PRODUCTION SCHEDULE Underground Development Metres and Mill Feed by Period 12 10,000 9,000 10 8,000 Mill Feed (million tonnes) 7,000 Development (metres) 8 6,000 6 5,000 4,000 4 3,000 2,000 2 1,000 0 0 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Year

  28. Slide 28: Site Infrastructure

    SITE INFRASTRUCTURE Configured for scalability In-pit Waste Explosive Rock Dump Facilities Overland Conveyor Materials handling synergies between Low-grade Stockpiles open pit and underground External Open Pits Waste Primary Rock Dump Process Crusher HLF (136 Mt) Plant (20 Mt) SXEW Underground Plant

  29. Slide 29: Capital Expenditures

    CAPITAL EXPENDITURES Low Initial Capital with a two-year construction period Initial Capital Expenditure Developed using EPCM project development approach with quotes, design driven quantity estimations and first principles Owners Costs and Contingency Process Infrastructure including Crushing and M

  30. Slide 30: Operating Costs

    OPERATING COSTS Average Life-of-Mine Production Cash Costs3 of $1.67/lb Copper Open Pit: Contractor-operated conventional truck and shovel Developed from first principles based on quantities generated from ▪ Open pit operating cost applied to mineralized material and waste mine design, production sc

  31. Slide 31: Economic Sensitivity

    ECONOMIC SENSITIVITY Well-positioned to Leverage the Copper Price $2,000 40% PEA $1,843 29.6% Post-Tax NPV ($ million) $1,500 $1,576 30% Post-Tax NPV (7%) $ M Post-Tax IRR 21.0% Post-Tax NPV (8%) $ M $1,000 20% 15.6% $1,144 $951 Post-Tax IRR % $713 $500 $566 10% $0 0% $3.80 $4.25 $5.00 Copper Price

  32. Slide 32: Targeting New Discoveries

    TARGETING NEW DISCOVERIES Empirical Data Informs Technical Decisions New Airborne Geophysical Survey (VTEM) New Airborne Spectral Survey N N 500 metres 500 metres New Structural Interpretation New Geophysical Processing (ZTEM) N N 500 metres 500 metres faradaycopper.com I page 32

  33. Slide 33: Permitting Pathway

    PERMITTING PATHWAY Plan of Operations and 404 Permit Plan of Operations ▪ Ground water National Environmental Update Plan of Operations and ▪ Surface water Environmental Impact bonding ▪ Air, Biological Policy Act Statement ▪ Tribal Record of Applications consultations After National Decision submit

  34. Slide 34: Endnotes

    ENDNOTES 1. Preliminary Economic Assessment (“PEA”) copper equivalent (“CuEq”) values are calculated using commodity type and price, considering the relevant recovery rate based on domain, applied using a regression formula as a function of grade. Recovery regression formulas are based on the outcom

  35. Slide 35: Contact Copper: Exploration Upside

    CONTACT COPPER: EXPLORATION UPSIDE ▪ 100% owned, 5,900+ acres of patented and unpatented mining claims in Nevada, US Contact Copper ▪ Excellent access to a major highway, power, water and local mining services Elko ▪ Open pit, heap-leach copper oxide opportunity NEVADA ▪ Deposit open in all directio

  36. Slide 36: Contact Information

    CONTACT INFORMATION STACEY PAVLOVA, CFA Suite 250, 200 Burrard Street VP Investor Relations Vancouver, BC Canada 778-730-1067 www.faradaycopper.com info@faradaycopper.com

Faraday Copper — Investor Presentation (September 2023) on 6ix