Lomiko Metals Inc.

Lomiko Metals — Investor Presentation (May 2024)

41 slides from Lomiko Metals's investor presentation, May 2024

  1. Slide 1: A responsible developer of choice in Quebec, Canada

    A responsible developer of choice in Quebec, Canada A partner of excellence in North America for a shared climate success story May 2024

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is not a prospectus, offering memorandum or an advertisement and is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscr

  3. Slide 3: Land Acknowledgement

    Land Acknowledgement We acknowledge that the land/projects where we operate are located within the traditional land of the Algonquin Anishnaabeg and Cree Eeyou Istchee Peoples. Our vision is to embrace Indigenous people and Indigenous values within our projects to develop a sustainable approach on o

  4. Slide 4: UL ECOLOGO certification

    UL ECOLOGO certification® What is it? • Ecologo (UL) is a certification specifically designed for mineral exploration. It contributes to the establishment of a social license within the socio-economic ecosystem of projects, in full transparency. • It was created as an independent third-party certifi

  5. Slide 5: The Lomiko Advantage

    The Lomiko Advantage Strong fundamentals for anode Projected massive growth in Domestic graphite will be considered Domestic graphite premium product, EV growth growth over • Global graphite demand growth of long term 30% to 40% year • 7x multiple of demand growth to 2040 with massive under-supply •

  6. Slide 6: Lomiko collaborations

    Lomiko collaborations Investissement G Ouébec SL CO ( e mM ~— International CRITM vezavecnseer Femina Collective SOlUEM Canada @ ECOLOGO eer A National Research errehey) UNIVERSITE Council Canada 65 Be LAVAL Conseil national de recherches Canada NRC-IRAP Industrial Research Assistance Program

  7. Slide 7: Mines, Mining Projects and Mineral Deposits in Québec

    CSM Mines, Mining Projects and Mineral Deposits in Québec www.lomiko.com TSXV: LMR OTC: LMRMF FRANKFURT: DH8C 7

  8. Slide 8: Ranked as the seventh biggest deposit worldwide by Mining.COM

    Lomiko advantage: Ranked as the seventh biggest deposit worldwide by Mining.COM Source: Company filings 8

  9. Slide 9: Market for Graphite

    #, LOMIKO Market for Graphite

  10. Slide 10: Electric Vehicle Market & Outlook: North American EV Sales

    Electric Vehicle Market & Outlook + Rocks and Stocks + January 2024 North American Market: EV Sales ‘000 sales 240 Husa Canada 180 120 60 (0) Jan- Apr- Jul- = Oct- — Jam-)— Apr- Jule Oct- —s Jan-)—s Apr- ss Jul- — Oct- —s Jam-—s Apr- — Jul-— Oct- 21 21 21 21 22 22 22 22 23 23 23 23 24 24 24 24 202 2

  11. Slide 11: The global EV market is in high growth mode

    The global EV market is in high growth mode • International Energy Agency (IEA): the number of electric cars, vans, trucks and buses on roads is forecast to grow from 11M in 2020 to 145M by 2030 (Right) • In 2022, China accounted for over 50% of all EVs on the road (13.8M of 26M globally) The surgin

  12. Slide 12: Shortfall to increase to 8Mt by 2040

    Shortfall to increase to 8Mt by 2040 Projected Anode Demand (Mt) Graphite Market Balance - Projected Demand and Supply (Mt) 9,000,000 12,000,000 8,000,000 10,000,000 7,000,000 6,000,000 8,000,000 La Loutre 5,000,000 Projected start 4,000,000 6,000,000 3,000,000 2,000,000 4,000,000 1,000,000 2,000,00

  13. Slide 13: PRC announces natural flake and synthetic graphite export restrictions

    PRC announces natural flake and synthetic graphite export restrictions • Restrictions set in December 2023 • China has declared its intention to implement export permits for certain graphite products to safeguard national security. This move is part of China's broader strategy to regulate the supply

  14. Slide 14: La Loutre Graphite Project

    La Loutre Graphite Project 14

  15. Slide 15: Lomiko is poised to be the responsible developer of choice in the South of Quebec

    Lomiko is poised to be the responsible developer of choice in the South of Quebec La Loutre Graphite Project Source: NI 43-101 Technical Report and Preliminary Economic Assessment (July 2021) 15

  16. Slide 16: La Loutre – 2021 PEA details

    La Loutre – 2021 PEA details • Two known deposits currently being explored: EV Carmin Zone and Battery Zone Zone • LOM plant production of 21.8 Mtonnes of mill feed at 6.78% Cg diluted EV Zone • Graphite concentrate production at 1.43 Mtonnes Battery grading 95.0% Cg Zone • 14.7-year mine life produ

  17. Slide 17: Achieving 184% Increase in Tonnage Indicated Mineral Resources

    Achieving 184% Increase in Tonnage Indicated Mineral Resources La Loutre Resource Estimate (Effective Date: March 31, 2023) Source: InnovExplo March 2023 2023 MRE 2021 MRE Deposit EV Battery TOTAL EV Battery TOTAL Cut-off (%) Cg 1.5 1.5 1.5 1.5 1.5 1.5 Indicated Tonnage (kt) 24,267 40,429 64,696 8,1

  18. Slide 18: La Loutre Graphite Met Studies - Summary

    La Loutre Graphite Met Studies - Summary ✓ SGS & Metpro Characterization Study, Feb 2023: 640kg core sample that was homogenized and used to test the graphite mineralization. Optimization of the flotation circuit resulted in achieving 94.7% recovery and reconciled LCT (Locked Cycle Testing) testing

  19. Slide 19: La Loutre Graphite Met Studies - Summary

    La Loutre Graphite Met Studies - Summary ▪ UNDERWAY: CRITM, NRC & COREM Study ▪ Comprehensive testing program supported by CRITM grant and being researched and tested by NRC and Corem with Lomiko and MetPro support ▪ COREM: Collected a representative 1,100 kg rock sample to produce flotation concent

  20. Slide 20: SGS Characterization Study, 2023 suitable for anode material

    SGS Characterization Study, 2023 suitable for anode material • Developed and optimized PFS level flotation plant flowsheet -LCT testing achieved 94.7% recovery and 98.6% - 99.1% Cg reconciled grade • La Loutre flake distribution is ~70% fines - suitable for anode market 37% growth year over year! •

  21. Slide 21: La Loutre metallurgical program 99.99% purified graphite content

    La Loutre metallurgical program 99.99% purified graphite content ✓ Completed PFS level met testing and optimized flow sheet ✓ Completed value-added testing with ProGraphite – micronization, spheroidization, and purification: ✓ Proved that La Loutre material is suitable for battery applications -Sphe

  22. Slide 22: La Loutre half-cell battery testing surpassed commercial graphite results

    La Loutre half-cell battery testing surpassed commercial graphite results ✓ Demonstrated that La Loutre material is suitable for battery applications – half-coin battery testing with Polaris Battery Labs, LLC, USA, is demonstrating higher reversible capacity compared to commercially available graphi

  23. Slide 23: La Loutre single layer pouch full-cell battery testing results

    La Loutre single layer pouch full-cell battery testing met and surpassed commercial graphite results ✓ Demonstrated that La Loutre material is suitable for battery applications – single layer pouch full cell battery testing completed with Polaris Battery Labs, LLC, USA, ✓ The single-layer pouch cell

  24. Slide 24: La Loutre graphite development milestones

    La Loutre graphite development milestones • Permitting and capital dependent – 100,000tpa flake concentrate PFS / Includes anode transformation plant at PEA Pilot Plant Testing Feasibility Study Baseline studies EIS/ BAPE/ Permitting Construction Production 2024 2025 2026 2027 2028 2029 24

  25. Slide 25: Lomiko Exploration Potential

    Lomiko Exploration Potential 25

  26. Slide 26: Graphite: Carmin

    Graphite: Carmin Carmin - historic PFS contiguous to La Loutre Carmin The original historical estimate contemplated certain assumptions Zone A where the mineral resources are stated as Proven and Probable resources for Sites A and B. • Site A: total 1.55 Mt at 10.0% Cg Proven: 1.47 Mt at 10.29% Cg (

  27. Slide 27: Regional exploration in Grenville belt

    Regional exploration in Grenville belt Most prospective graphite belt in North America • Completed 1,518-line kilometers of heliborne geophysical surveys completed over the six graphite properties, with 55 targets identified • 264 claims in total on 6 early-stage projects covering 15,639 hectares in

  28. Slide 28: Lithium exploration on massive claim package on Nemaska lithium corridor

    Lithium exploration on massive claim package on Nemaska lithium corridor Bourier Property 28

  29. Slide 29: Bourier lithium property

    Lithium exploration on massive claim package on Nemaska lithium corridor Bourier • 49% ownership achieved • 203 claims for a total ground position of 10,252 hectares (102 km2) that boasts other lithium deposits and known lithium mineralization • Bourier consists of volcano-sedimentary units, a seque

  30. Slide 30: Lomiko Advantage

    =, LOMIKO Lomiko Advantage

  31. Slide 31: NPV scenario analysis: Positively leveraged to graphite price increases

    NPV scenario analysis: Positively leveraged to expected graphite price increases • 2021 PEA used a graphite concentrate selling price of US $916/t (basket price) • The current forecast selling price for +94%Cg is US $1,070/t of graphite concentrate (source: Benchmark / Lone Star) • Current public in

  32. Slide 32: Concentrate Grade and NPV/Capex Multiple

    Lomiko advantage: Concentrate Grade and NPV/Capex Multiple • Updating the Lomiko PEA for USD $1,500/t Graphite selling price improves on current solid project returns. • The La Loutre project combines high-grade concentrate with compelling economics of a post-tax IRR of 43%, post-tax NPV of $520M, a

  33. Slide 33: High Quality project with low capital requirements

    Lomiko advantage: High Quality project with low capital requirements combined with High-Grade Graphite Concentrate Project Location Africa/Europe North America 33

  34. Slide 34: Cut-Off Grade & Graphite Con Grade

    Lomiko advantage: Cut-Off Grade & Graphite Con Grade Lower cost and higher recovery Project Location Africa/Europe North America 34

  35. Slide 35: La Loutre delivers 97.4kt/year over a 15-year mine life

    PEA: The La Loutre project delivers 97.4kt/year over a 15-year mine life – PEA only, expansion possible Lomiko – La Loutre Operating Graphite Mines Source: Company filings 35

  36. Slide 36: Diverse leadership & Experienced team, board and advisors

    Diverse leadership & Experienced team, board and advisors MANAGEMENT TEAM BOARD OF DIRECTORS Belinda Labatte, CEO, CFA, MBA, ICD.D Sagiv Shiv, Lead Independent Director and Chair of Audit Committee 1,3 20 years experience in capital markets. Fluent in French. Served as Chief Dev. Head of M&A at ACP

  37. Slide 37: For more information

    For more information info@lomiko.com Follow us @lomikometals on socials l l l f l

  38. Slide 38: Lomiko – a responsible developer of choice: A leader in 2024

    Lomiko – a responsible developer of choice A leader in 2024 ✓ Increase of 184% in tonnage for the Indicated Mineral Resource category in updated 2023 MRE – the largest southernmost graphite resource in Canada ✓ Met with many local community members and communicated with mayors throughout 2023 ✓ Demo

  39. Slide 39: 97 graphite mines needed to fuel the EV revolution

    97 graphite mines needed to fuel the EV revolution How many mines do we need? • Benchmark forecasts how many mines need to be built in the short time frame to keep up with exceptional volumes of demand needed for key raw materials expected by 2035 • La Loutre is positioning itself for success as a r

  40. Slide 40: La Loutre: 2021 PEA Layout – great base to build on

    La Loutre: 2021 PEA Layout – great base to build on Mine layout and costs – PEA • Waste rock and tailings co-disposed • Efficient site water management with WASTE ROCK & no wet tailings EV ZONE CODISPOSAL PILE • Pits sequenced to maximize the returns starting from North – EV Pits to South – Battery

  41. Slide 41: A responsible operator with track record of execution

    A responsible operator with track record of execution Studies completed ✓ Completed 13,000m+ of drilling at La Loutre with exceptional results ✓ Completed NI-43-101 mineral Resource for La Loutre ✓ Completed 12 months of environmental baseline studies ✓ Completed pre-feasibility metallurgical test p

Lomiko Metals — Investor Presentation (May 2024) on 6ix