Raise Production Inc

Raise Production — Shareholder Meeting (October 2016)

6 slides from Raise Production's shareholder meeting presentation, Oct 26, 2016

  1. Slide 1: Annual General Meeting October 26th 2016

    Annual General Meeting October 26th 2016

  2. Slide 2: Horizontal Pump Overview

    Horizontal Pump Overview Deployment results from latest installation have proven the theory that varying degrees of depletion has occurred along the wellbore We base this on the following ; • Recovered frac sand • Gas interference at the heel area • Cross flow • Fluids separation • Water traps

  3. Slide 3: Gained Knowledge/Next Step

    Gained Knowledge/Next Step • Effective pump positions in the horizontal section • Initial production improvements tempered by water loading • The results indicate stranded reserves remain in place • The system is robust and versatile, allowed for consistent and selective inflow and outflow control f

  4. Slide 4: 2 deployments/different results

    2 deployments/different results Pump#4 2015 Pump#3 2015 Pump#2 2015 Pump#1 2015 “Heel” 845mtr MD 966mtr MD 1114mtr MD “Toe”1261mtr MD Pump#4 2016 Pump#3 2016 Pump#2 2016 Pump#1 2016 “Heel”1005mtr MD 1125mtr MD 1245mtr MD “Toe”1410mtr MD

  5. Slide 5: Rod Pump Overview

    Rod Pump Overview • The 1.5” and 2.5” high angle Reciprocating Rod Pump are ready for commercialization. The pumps performed as expected in horizontal and high deviation >75deg landed angles • The Large bore pump is in late development • The company has a number of technical sessions booked with int

  6. Slide 6: Thank you

    Thank you

Raise Production — Shareholder Meeting (October 2016) on 6ix