Charger Metals Nl · ASX:CHR

Charger Metals Nl — Future Facing Commodities Conference Singapore 2023

20 slides from Charger Metals Nl's conference presentation, Mar 31, 2023

  1. Slide 1: Australian lithium explorer drilling outstanding targets

    Australian lithium explorer drilling outstanding targets ASX:CHR Future Facing Commodities Conference | Singapore, Apr 2023

  2. Slide 2: Disclaimer - Forward Looking Statements

    Disclaimer - Forward Looking Statements This presentation is for information purposes Certain statements contained in this information, future events or results or properties; native title and Aboriginal heritage only. Neither this presentation nor the presentation, including information as to the o

  3. Slide 3: Australian lithium explorer leveraged for success

    Australian lithium explorer leveraged for success • Proven systematic lithium targeting has generated drill-ready targets on both lithium projects • Lake Johnston Lithium Project (Western Australia) – moving to 100% interest • Maiden drill programme recently completed has intersected spodumene pegma

  4. Slide 4: Corporate Overview

    Corporate Overview Strong management experience in lithium exploration and development Aidan Platel - Managing Director Strong share price Adrian Griffin - Non-Executive Chairman performance since listing David Crook - Non-Executive Director Terry Gardiner - Non-Executive Director Bryan Dixon – Busi

  5. Slide 5: Australian lithium explorer highly leveraged to success

    Australian lithium explorer highly leveraged to success Multi-asset • Two highly prospective lithium projects with sizeable exploration targets exploration • Lake Johnston Lithium Project in surrounded by Yilgarn lithium projects opportunity • Bynoe Lithium Project in surrounded by the Finniss Lithi

  6. Slide 6: Bynoe Lithium Project NT

    Bynoe Lithium Project NT • Covers approximately 63 km2 in known lithium (spodumene) belt. • Surrounded by Core Lithium Ltd, Finniss Lithium Mine. Mineral Resource 18.9 Mt at 1.32% Li2O - mining and construction well advanced1 • Geophysics indicates contiguous geological environment. • Merged and ext

  7. Slide 7: Bynoe Lithium Project NT

    Bynoe Lithium Project NT Geophysics indicates contiguous geological Outcropping pegmatites at 7up lithium prospect 7 environment with Finniss Project

  8. Slide 8: Bynoe Lithium Project NT

    Bynoe Lithium Project NT Nearby: Core Lithium Limited (ASX: CXO) provided the following drill results: Ah Hoy Prospect1: • 11m at 1.42% Li2O in SRC053 • 19m at 1.21% Li2O in SRC054 • 14m at 1.37% Li2O in SRC055 Bilatos Prospect2: • 24m at 2.24 % Li2O in SRC068 • 30m at 1.11 % Li2O in SRC068 1: JORC

  9. Slide 9: Bynoe Lithium Project NT: Fully Permitted. Maiden drill programme about to commence

    Bynoe Lithium Project NT • Soil geochemistry has generated numerous drill targets at 7-Up, Old Bucks, Mega Bucks and Enterprise1 • Mine management plan for drilling approved • AAPA heritage approvals in place Fully Permitted. Maiden drill programme about to commence 2 1. JORC Table 1 included in an

  10. Slide 10: Bynoe Lithium Project NT

    Bynoe Lithium Project NT Mega Bucks Prospect – very large target • Strong soil anomaly extending 800m overlays mapped and trenched pegmatite • Pegmatite strikes over 500m and has been trenched on 100m intervals 700m • Historical trenching suggests average of 40m widths strike • Parallel pegmatites a

  11. Slide 11: Bynoe Lithium Project NT

    Bynoe Lithium Project NT Old Bucks Prospect • Strong soil anomaly extending 800m by 500m • Anomaly overlays mapped pegmatite 800m strike with historical workings 7Up Prospect • Strong soil anomaly extending at least 700m strike 700m long overlays outcropping mapped pegmatite • On same structural cor

  12. Slide 12: Lake Johnston Lithium Project

    Lake Johnston Lithium Project • Proposed consolidation 100% of the lithium rights to the whole project for 7M shares (~$1.8M)1 • Access to port infrastructure by Kalgoorlie- Esperance road and rail corridor • Significant lithium footprint already identified with additional targets being added • The

  13. Slide 13: Lake Johnston Lithium Project

    Lake Johnston Lithium Project • Targeting confirms the Lake Johnston Project has multiple lithium systems • Medcalf: swarm of spodumene pegmatites • strong soil anomalies, and • rock chips ranging between 1.51% and 7.15% Li2O1 • drilling has confirmed spodumene pegmatites up to 13m in width2 • Mt Da

  14. Slide 14: Lake Johnston Lithium Project

    Lake Johnston Lithium Project Medcalf: a swarm of spodumene-pegmatites within a 300m by 700m target

  15. Slide 15: Lake Johnston Lithium Project

    Lake Johnston Lithium Project • 41 RC holes completed • Stacked spodumene bearing pegmatites with apparent thicknesses of up to 13m intersected1 • Maiden RC drilling programme to test for mineralised extensions, both along strike and at depth now completed • Very promising start with numerous spodum

  16. Slide 16: Lake Johnston Lithium Project

    Lake Johnston Lithium Project 1. JORC Table 1 included in an announcement to ASX announcement “Charger Confirms High Grade Lithium at Medcalf “ on 22 March 2023. Charger confirms that it is not aware of any new information or data that materially affects the information included in the original mark

  17. Slide 17: Lake Johnston Lithium Project

    Lake Johnston Lithium Project Mt Day: a very large LCT pegmatite field • Geochemical survey generated Li anomalies over LCT-pegmatites • Numerous mapped pegmatites within a 5.5km by 1.5km field. • Detailed soils planned prior to drilling

  18. Slide 18: Australian lithium explorer highly leveraged to success

    Australian lithium explorer highly leveraged to success • Lithium in strong demand in the rapidly expanding battery industry • 2 highly prospective Australian lithium projects in sought after spodumene provinces: • Lake Johnston Lithium Project – maiden 40 hole drill out completed at Medcalf Spodume

  19. Slide 19: JORC Table 1 Statement

    JORC Table 1 Statement JORC Table 1 was included in the following announcements released to the ASX: Bynoe Project 27 October 2021: “Charger confirms emerging lithium targets at Bynoe”. 17 January 2022: “Charger's targeting suggests Large Lithium System”. Lake Johnston Project 9 June 2022 “Charger c

  20. Slide 20: Company's Contact Details

    Company’s Contact Details Telephone: +61 8 9322 6283 Email: admin@chargermetals.com.au Website: www.chargermetals.com.au Twitter: @ChargerMetals Authorised for release by David Crook Managing Director

Charger Metals NL — Future Facing Commodities Conference Singapore 2023 on 6ix