  1. Slide 1: HSE Management of Contractors

    For personal use only HSE Management of Contractors Marian McLean Director - Delivery Integrity

  2. Slide 2: Management of contractors

    Management of contractors For personal use only u Increasing level of Improve contracts u Contractor = WorleyParsons (HSE performance reporting) u Legal ‘duty of care’ u If HSE well managed, generally things are well managed on all fronts

  3. Slide 3: Expectation alignment

    Expectation alignment For personal use only u Alignment on • Scope of work • Key HSE risks • Primacy contract categories • Realistic project schedule • Gap analysis and bridging document

  4. Slide 4: Leadership – site visits

    Leadership – site visits For personal use only u We don’t • Do a general walkabout without a clear focus • Tick of numerous action items of no real value u We do • TALK TO PEOPLE • Ask them how it’s going • Listen to what they say • Ask what we can do to help • Deliver on every promise made

  5. Slide 5: Changing behaviours

    Changing behaviours For personal use only u Changing safety cultures from reactive to proactive u Establishing ‘safety pioneers’ across locations globally u Investment and implementation of major programs to increase awareness and change unsafe behaviours

  6. Slide 6: Evaluating contractor performance

    Evaluating contractor performance For personal use only u HSE Plan implementation u Work method statement effectiveness u Commitment from senior management u Quality and effectiveness of communication u Performance against KPIs u Recommendation for future work

  7. Slide 7: Performance statistics

    Performance statistics For personal use only WorleyParsons’ Contractor Safety Performance 0.5 0.4 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.0 2008 2009 2010 2011 YTD Industry Comparison of Contractor Safety Performance LWCFR TRCFR 1.8 1.6 1.4 1.2 1.0 APPEA 0.8 OPG 0.6 WP 0.4 0.2 0.0 LWCFR TRCFR LWCFR TRCFR LWCF

  8. Slide 8: For personal use only

    _ DEVELOPED DEVELOPING “WORLD WORLD : me\ \S + Yom

  9. Slide 9: Introduction

    For personal use only Introduction John Grill Chief Executive Officer

  10. Slide 10: 1500 year celebration

    1500 year celebration For personal use only

  11. Slide 11: Differentiators

    For personal use only Differentiators

  12. Slide 12: Global reach – local operations

    Global reach – local operations For personal use only 35,100 people 143 offices 43 countries

  13. Slide 13: Leadership team

    For personal use only Leadership team

  14. Slide 14: Group outlook

    Group outlook For personal use only “Subject to the markets for our services remaining strong, we expect to achieve good growth in 2012 compared to 2011 underlying earnings. We are projecting that current year earnings will be weighted to the second half of the financial year but expect our first ha

  15. Slide 15: For personal use only

    For personal use only

  16. Slide 16: Development – Global and sector strategy

    For personal use only Development – Global and sector strategy Iain Ross Group Managing Director - Development

  17. Slide 17: Agenda

    Agenda For personal use only u Restructure role u Focus areas u Global industry outlook u Hydrocarbons u Power u Infrastructure u Minerals & Metals

  18. Slide 18: Restructure role

    For personal use only Restructure role

  19. Slide 19: Global industry outlook

    Global industry outlook For personal use only u Key global themes: • Continuing economic volatility • Instability in the Middle East • Ongoing investment by China across the global resource market • Continued uncertainty about carbon pricing and desire for sustainable solutions • Fukushima ripple ef

  20. Slide 20: Efficiency and optimisation of assets

    For personal use only u Efficiency and optimisation of assets u Sustainable solutions u Technical innovation u Global leverage u Private multinationals

  21. Slide 21: Monetising resource assets

    For personal use only u Monetising resource assets u Desire for energy sovereignty u Building technical capability u Major infrastructure investment u State owned multinationals

  22. Slide 22: Hydrocarbons sector dynamics

    Hydrocarbons For personal use only Sector dynamics u Difficult Oil – Arctic and heavy oil u LNG – greenfield, floating and regasification u Unconventional gas u Rapid emergence of Brazil & Kazakhstan u Sustaining capital services

  23. Slide 23: Hydrocarbons Strategy

    Hydrocarbons Strategy For personal use only Response u Continue to build capacity in offshore oil and gas market and heavy oil/ oil sands u Execution of LNG in Australia is a primary focus u Work closely with the NOCs to deliver a broad range of services

  24. Slide 24: Power sector dynamics

    Power For personal use only Sector dynamics u Developed nations - reduced energy consumption and drive toward smart energy u Sustaining capital services in fossil fuel power u Developing nations - new build nuclear

  25. Slide 25: Power Strategy

    Power Strategy For personal use only Response u Follow growth in Asia, Middle East, Latin America and Africa u Focus on asset optimisation and network integration in developed nations u Continue to lead energy storage and carbon capture & sequestration markets u Extend leadership in new build nuclea

  26. Slide 26: Infrastructure sector dynamics

    Infrastructure For personal use only Sector dynamics u Growing population, urbanisation and industrialisation of developing nations u Water scarcity u Aging infrastructure within developed nations requiring restoration u Lack of infrastructure for stranded resources

  27. Slide 27: Infrastructure Strategy

    Infrastructure Strategy For personal use only Response u Focused on infrastructure and environmental needs for • pit to port • water management • ports of the future • master planning • remediation and decommissioning of facilities

  28. Slide 28: Minerals & Metals sector dynamics

    Minerals & Metals For personal use only Sector dynamics u Resurgence of iron ore projects u Innovative solutions required to bring Tier 2, 3 resources to market u Tier 1 regional and global service agreements u Continued need for investment in sustaining capital services

  29. Slide 29: Minerals & Metals Strategy

    Minerals & Metals Strategy For personal use only Response u Continue expansion in South America and Africa u Further embed unique pit to port infrastructure solutions for stranded resources u Broaden service offering in global agreement contracts

  30. Slide 30: For personal use only

    For personal use only

  31. Slide 31: Operations

    For personal use only Operations Stuart Bradie Group Managing Director - Operations

  32. Slide 32: Agenda

    Agenda For personal use only u Restructure rationale u Development group u Finance, People and Delivery support groups u Operations u Local delivery – global support u Doing what we do better u People u Benefits and outcomes

  33. Slide 33: Restructure Rationale

    Restructure Rationale For personal use only u WorleyParsons is uniquely differentiated through the breadth and depth of its global footprint u We will capitalise on this by embedding 1. Enhanced ability to service our customers globally 2. Efficiency and consistency of delivery 3. Increased focus on

  34. Slide 34: Development group

    Development group For personal use only Development Group Global Relationships I&E HC M&M Power u Service our global customers • Industry shift to global relationships • Global Customer Relationships (CRM) • Non business as usual

  35. Slide 35: Finance, People and Delivery Support groups

    Finance, People and Delivery Support groups For personal use only u Efficiency and consistency of delivery • Tight/Loose • Targeted and fit for purpose business support • Reputation (via Delivery Assurance) • Global best practice Delivery Finance People Support Group Group Group

  36. Slide 36: Operations

    Operations For personal use only Operations I&E HC M&M Power Select Local Locations Deliver customer Regional relationships Managing Finance People Deliver Improve Directors u Focus on locations • Differentiated sustainable business model • Where we make our money • Where we deliver our projects • I

  37. Slide 37: Local delivery – global support

    Local delivery – global support For personal use only Development Group Global I&E HC M&M Power Relationships Global Support Operations I&E HC M&M Power Select Local Locations Deliver customer Regional relationships Managing Directors Finance People Deliver Improve Global Support Delivery Finance Pe

  38. Slide 38: Doing what we do better

    Doing what we do better For personal use only u Global customers u Multi-location / cross-regional project delivery u Globally consistent and efficient tools, systems and work processes Ma’aden Phosphate, Saudi Arabia u Best practices First DAP shiploading – 23 September 2011 u Workshare Sectors Exe

  39. Slide 39: People

    People For personal use only u Increased focus on locations • Closer to our people • Talent identification and recognition • Cultural understanding enhanced u More regions / growing number of locations • More opportunities for our future leaders u Complex and challenging multi- location projects • E

  40. Slide 40: Outcomes and benefits

    Outcomes and benefits For personal use only u Increased chargeability in 2H Kazakhstan u Margins Perth • Increase of 2.8% in 2H u Improved cash performance in 2H Calgary u Match fit • Up Malaysia • Down u Head room for growth u Differentiated u Finding our future leaders

  41. Slide 41: For personal use only

    For personal use only

  42. Slide 42: Delivery Support Group

    For personal use only Delivery Support Group David Steele Group Managing Director - Deliver

  43. Slide 43: Agenda

    Agenda For personal use only u Delivery Support group u Overview of services u Consulting Practices u Select u Deliver u Improve

  44. Slide 44: Delivery Support group

    Delivery Support group For personal use only u Platform Leaders for Projects, Improve and Consulting Practices who have responsibility for the delivery platforms for these service types u Functional Leads who have responsibility for supporting the delivery platforms u System / Tools Leads who are th

  45. Slide 45: Overview of services

    For personal use only Overview of services

  46. Slide 46: Consulting and EcoNomics

    Consulting and EcoNomicsTM For personal use only Profitably embeds environmental, social, and financial sustainability into project delivery across the asset lifecycle Delivering technical consulting services to our customers either from within larger project teams or via stand alone engagements

  47. Slide 47: Consulting – APLNG

    Consulting For personal use only Customer: Australia Pacific APLNG LNG Engineering Project: Environmental Excellence Award impact assessment Offices: Brisbane and Perth Scope: u EIS studies u Site selection of key infrastructure u Stakeholder engagement The WorleyParsons, ConocoPhillips and Origin p

  48. Slide 48: Consulting – Anglo American

    Consulting For personal use only Customer: Anglo American Metallurgical Coal (AAMC) Project: Mine water desalination project Office: Brisbane Scope: u Fast track concept design and Class 2 estimate u EPCM awarded

  49. Slide 49: Consulting – Mongolia

    Consulting For personal use only Customer: Mongolia Project: Mongolia industrialisation and downstream processing study Office: Sydney and Ulaanbaatar Scope: u Advisory services u Strategic planning u Implementation pathways

  50. Slide 50: Select – Kazakhmys

    Select For personal use only Customer: Kazakhmys Project: Bozymchak Cu/Au mine definitive feasibility study Office: Almaty, London and Calgary Scope: u Prepare feasibility studies to permit fast track design, construction and commissioning of mine and processing plant u Risk management

  51. Slide 51: Deliver – SAMREF

    Deliver For personal use only Customer: Saudi Aramco Mobil Refining Company (SAMREF) Project: Clean fuels project Office: Al Khobar, Yanbu, Beijing and Monrovia Scope: u FEED u EPCM u Project management • Design team – 800 • Construction team – 4,000 • Man-hours – 4 million

  52. Slide 52: Deliver – TengizChevroil

    Deliver For personal use only Customer: TengizChevroil Project: Sour gas project Office: Atyrau, London, Houston and Philippines Scope: u Identify u Select u Define for SGI u EPCM for SGI and SGP

  53. Slide 53: Deliver – Jubilee first oil

    Deliver For personal use only Customer: Anadarko, Kosmos, Tullow Oil Plc Project: Jubilee first oil Office: Houston and Accara Scope: u Conceptual engineering / pre-FEED u FEED u Detailed Design u Procurement

  54. Slide 54: Improve – Pacific National

    Improve For personal use only Customer: Pacific National Project: PN rail alliance Office: Melbourne and China Scope: u Engineering and project delivery u Project management u Developing, maintaining and applying engineering standards u Coordinating and scheduling of capital projects u Business deve

  55. Slide 55: Improve – Tennessee Valley Authority

    Improve For personal use only Customer: Tennessee Valley Authority Project: TVA alliance Office: Reading and Chattanooga Scope: u 30,000 MW total installed capacity u Operation and maintenance u Modification services u Construction modification

  56. Slide 56: Summary

    Summary For personal use only Project APLNG EIA Mine Dewatering Project Industrialisation Study Bozymchak Cu/Au Mine Clean Fuels Project Sour Gas Project Jubilee First Oil Pacific National Alliance TVA Alliance

  57. Slide 57: For personal use only

    WorleyParsons resources & energy DEVELOPING WORLD

  58. Slide 58: Global Minerals & Metals Relationships

    For personal use only Global Minerals & Metals Relationships Mark Southey Managing Director – Minerals & Metals

  59. Slide 59: Agenda

    Agenda For personal use only u Industry trends u Tier 1 customer drivers and our response u Key global customer relationships

  60. Slide 60: Industry trends

    Industry trends For personal use only u Strategic mega projects in vogue u Developing world focus u Outlook strong u Skill shortages u Tight project finance u Industry consolidation u Delineation between customer groups u Realisation of new resource key to success

  61. Slide 61: Importance of Tier customers

    Importance of Tier 1 customers For personal use only u Sustained investment u Hold a disproportionate share of the spend u Provide insulation to market volatility u Critical for long term growth and success u Take a strategic approach to supply chain management u Seeking delivery assurance partners

  62. Slide 62: Customers strategic thinking

    Customers strategic thinking For personal use only

  63. Slide 63: Responding to the challenge

    Responding to the challenge For personal use only u Leveraging our global – local operating model u Fully integrated pit to port project delivery approach u Focusing on key commodity groups u Investment in global customer relationships

  64. Slide 64: Global service agreements

    Global service agreements For personal use only u Several global agreements u Agreements vary considerably • Enterprise wide • Commodity or business • Expansion • Sustaining capital u Many other opportunities u Confirmation of global status as ‘Partner of Choice’

  65. Slide 65: BHP Billiton (iron ore)

    BHP Billiton (iron ore) For personal use only u Structured integration with BHP systems and processes u Long term master framework agreement for Growth Program EPCM services across port, rail, mining and power u Current work includes • Yarnima Power Station • Port Hedland Tug Harbour u Secured susta

  66. Slide 66: Vale

    Vale For personal use only u From minor to major customer in three years u S11D iron ore project • One of the world’s largest iron-ore developments • Project based in Brazil, design being completed in Canada, Australia and Brazil u Global framework agreement now in place u Currently involved in proj

  67. Slide 67: BASF

    BASF For personal use only u Secured two long term engineering services agreement for Asia and North America region u EPCM execution model u Technology neutral u Currently executing multiple projects in • China • Singapore • Brazil u Major synergy benefits u Several other agreements in place

  68. Slide 68: Conclusion

    Conclusion For personal use only u Investing in global relationships …. Program starting to deliver u Global relationship focus is allowing our customers to get more value from WorleyParsons u Strengthening our market position for sustainable growth

  69. Slide 69: For personal use only

    ay uy “DEVELOPED DEVELOPING ORLD WORLD : we

  70. Slide 70: Water Security and Restoration

    For personal use only Water Security and Restoration Gordon Cowe Managing Director – Infrastructure & Environment

  71. Slide 71: Agenda

    Agenda For personal use only u Infrastructure & Environment strategy u Water security • Objectives • Global issue • Case Studies u Restoration • Customer challenges • Market • Value offering • Case Studies

  72. Slide 72: Introduction

    Introduction For personal use only u Fastest growing CSG in u Rapidly expanding global footprint WorleyParsons • Over 53% of revenue currently derived • Revenue increased 50% in 2011 outside ANZ FY11 Aggregated Revenue % by Region ANZ Canada E&A USLAC AME u Major Growth Opportunities in: • Resource

  73. Slide 73: Strategy

    Strategy For personal use only u Global CRM u Early entry into resource development opportunities u Global Businesses • Water Security • Unconventional gas • Pit to port • Master planning • Ports • Transport • Environmental • Geosciences • Restoration

  74. Slide 74: Why Water Security?

    Why Water Security? For personal use only u Water security issues • South Africa • Chile and Peru • India and Mongolia • Middle East • US and Canada • Australia and NZ u Hydrocarbons and mining projects • Water supply and produced water management

  75. Slide 75: Water security objectives

    Water security objectives For personal use only u Support customer’s earliest identification of risks and solutions associated with security of water u Utilise market leadership capability with EcoNomics™ tools u Provide advisory, consulting, engineering, project delivery and through asset life supp

  76. Slide 76: Water security – Government of Alberta

    Water security For personal use only Government of Alberta Department of Environment u Developing an adaptive management approach for evaluation and management of groundwater resources in the Athabasca oil sands region • Management • Monitoring • Modelling u Vulnerability and risk mapping

  77. Slide 77: Water security – Chevron / ExxonMobil

    Water security For personal use only Chevron / ExxonMobil Kazakh Government u Second generation oil and gas handling plant u 300,000 barrels of oil per day u No water source u Strict environmental regulations requiring zero discharge u Delivered a 2.3ML/d zero discharge waste water treatment / recyc

  78. Slide 78: Why Restoration?

    Why Restoration? For personal use only u Long term sustainability requirements and objectives u Rapidly changing regulatory requirements u Increasing expectations of shareholders u Facility end of life and retaining value u Environmental and social constraints u Assets in complex and sensitive setti

  79. Slide 79: Restoration services

    Restoration services For personal use only Liability management and remediation u Business risk and asset management solutions u Improve end of life decision making u Remediation EcoNomics™ Decommissioning u Enhancing program planning u Sequencing complicated aspects of restoration u Contaminated la

  80. Slide 80: Restoration – global issue

    Restoration – global issue For personal use only

  81. Slide 81: Size of the restoration market

    Size of the restoration market For personal use only

  82. Slide 82: Liability management and remediation

    Liability management and remediation For personal use only BP environmental consulting and engineering services u Three year North America agreement u Optimize environmental spend and contractual risk u Consistency and simplification

  83. Slide 83: Decommissioning

    Decommissioning For personal use only PowerGen power station decommissioning and redevelopment u An oil fired power station decommissioned for a new commercial property development u Responsible for • Detailed site investigation • Risk based remediation strategy • Remediation approach to heavy metal

  84. Slide 84: Response and recovery

    Response and recovery For personal use only Southern California Edison (SCE) u Provides services to nearly 14 million people, 180 cities, 5,000 large businesses and 280,000 small businesses u Review and update of their damage assessment plan u Provision of engineers to support the recovery of the SC

  85. Slide 85: Supporting changing needs

    Supporting changing needs For personal use only

  86. Slide 86: For personal use only

    «DEVELOPED DEVELOPING -WORLD WORLD

  87. Slide 87: Improve

    For personal use only Improve Graeme Henderson Managing Director - Improve

  88. Slide 88: Agenda

    Agenda For personal use only u Introduction u Explanation of Improve u Improve – growth of value u Customer attractiveness u Why we focus on Improve u Improve financial value u What makes us unique u Our progress u The future – industry focus u Future geographic growth focus This image cannot curren

  89. Slide 89: Introduction

    Introduction For personal use only This image cannot currently be displayed.

  90. Slide 90: Explanation of Improve

    Explanation of Improve For personal use only u CoSyn contract • Relationship between Syncrude and WorleyParsons (COLT) • Long-term multi-disciplined contract including engineering and procurement commenced 1991 • Large project work pull through eg Aurora Tailings Dam 2011 2011 1996 20 year I3 ideas

  91. Slide 91: Improve – growth of value

    Improve – growth of value For personal use only Accumulated I3 Project Value Since 2000, CoSyn has achieved $607.1 million in project related value This image cannot currently be displayed.

  92. Slide 92: Customer attractiveness

    Customer attractiveness For personal use only This image cannot currently be displayed.

  93. Slide 93: Why we focus on Improve

    Why we focus on Improve For personal use only u Builds deep relationships u Understand our customers’ business u Improves HSE capability u Underpins our global operations u Creates long term financial value u We have a sustainable competitive advantage This image cannot currently be displayed.

  94. Slide 94: Improve financial value

    Improve financial value For personal use only u Return on assets u Return on equity u Use of assets and funds u Integration and reliable cash flow u Reimbursable contracts This image cannot currently be displayed.

  95. Slide 95: What makes us unique

    What makes us unique For personal use only u Unequalled geographic footprint u Global/cross region agreements with seven Tier 1 customers u Diverse industries = potential for leading practice sharing u Distinct but complementary business streams – Improve and Deliver u Unique expertise drives value

  96. Slide 96: What makes us unique – BP

    What makes us unique For personal use only u Three global agreements with BP u BP GoM commenced in 2009 and has grown to 400 people u BP Trinidad and Brazil u Relationships = growth 1998 BP Kwinana Refinery, Australia 1997 BP Chemicals 2008 BP 2010 BP Malaysia GUPCO 2009 BP Gulf of Trinidad 2011 200

  97. Slide 97: Our progress

    Our progress For personal use only This image cannot currently be displayed.

  98. Slide 98: The future – industry focus

    The future – industry focus For personal use only Rail Coal Ports Iron ore Water Aluminium Unconventional Gas LNG Fossil Fuels Nuclear Heavy Oil Refining Conventional Oil & Gas This image cannot currently be displayed.

  99. Slide 99: Future geographic growth focus

    Future geographic growth focus For personal use only Minerals Power Hydrocarbons - Hydrocarbons - UCG & LPG & Metals Upstream Downstream This image cannot currently be displayed.

  100. Slide 100: For personal use only

    For personal use only This image cannot currently be displayed.

  101. Slide 101: For personal use only

    For personal use only This image cannot currently be displayed.

  102. Slide 102: Power developments and opportunities

    For personal use only Power developments and opportunities Chris Ashton Managing Director - Power

  103. Slide 103: Agenda

    Agenda For personal use only u Key trends u Improve and the developed world u Customer challenges u Nuclear power post Fukushima u Nuclear projects u Smart Grid

  104. Slide 104: Key trends

    Key trends For personal use only ► Gas emerging as a World Power Generation long term fuel of choice ► Power networks experiencing rapid growth ► Nuclear power continues to be strong ► Coal still a dominant fuel in the emerging economies ► Polarity in demand growth ► Renewable energy remains importa

  105. Slide 105: Improve and the developed world

    Improve and the developed world For personal use only World net electricity generation by region, 1990-2035 (trillion kilowatt-hours) u Demand growth projections remain low over the long term u Utilities view market conditions as an opportunity to change business models u Focus on existing generatin

  106. Slide 106: Improve and the developed world

    Improve and the developed world For personal use only u Continued focus on US, Australia and Canada – good position for growth: • Currently >40% of global power business • Strong base in North America, and continued growth in Australia • Existing long term, quality customer base in each country

  107. Slide 107: Customer challenges

    Customer challenges For personal use only u Asset maintenance – diverse services capability – not just engineering but includes maintenance and outages, integrated services, operations and maintenance u Technology alignment with customers fleet – coal, gas, nuclear, hydro, solar, wind, transmission

  108. Slide 108: Improve fossil fuel

    Improve fossil fuel For personal use only Project: Fossil / Hydro / Nuclear fleet Project: Fossil / Hydro engineering engineering Customer: Ontario Power Generation Customer: Tennessee Valley Authority (OPG) (TVA)

  109. Slide 109: Nuclear power post Fukushima

    Nuclear power post Fukushima For personal use only France US It would be “obviously out of the question to phase out nuclear power.” ~ Nicolas Sarkozy “Nuclear power will continue to be an important part of our energy mix, both in the United States and around the world. Its role grows more valuable

  110. Slide 110: Nuclear power post Fukushima

    Nuclear power post Fukushima For personal use only China Japan Japan’s incoming prime China will temporarily suspend minister, Yoshihiko Noda, told approval for nuclear power reporters he was determined to projects, including those that restart the country’s idled nuclear have already begun prelimin

  111. Slide 111: Nuclear power post Fukushima

    Nuclear power post Fukushima For personal use only Russia Turkey Russian Energy Secretary, Sergei Kiriyenko said that Russia’s model of nuclear cooperation includes assisting new entrant nations to develop “clear regulatory frameworks in accordance with the requirements and recommendations of the IA

  112. Slide 112: Nuclear power post Fukushima

    Nuclear power post Fukushima For personal use only Generation I design (Fukushima) Generation III+ design u 1960 – 70’s vintage design u 40 years of design evolution u Safety systems limited to u Step changes in available technologies available at that time technologies and safety philosophy

  113. Slide 113: Implications

    Implications For personal use only u Opportunity for new build Generation III+ projects u Upgrade opportunity on existing facilities will take several years u Decommissioning, decontamination, demolition and disposal (D4) process for shutdown plants

  114. Slide 114: Nuclear projects

    Nuclear projects For personal use only u Bulgaria – Belene NPP owners engineer u Jordan – NPP consultancy u Egypt – NPP consultancy u Armenia – NPP consultancy u Turkey – Akkuyu NPP consultancy u Japan – Fukushima stress test assessment u Bulgaria – KNPP stress tests programs u Uzbekistan – CSP inte

  115. Slide 115: Improve nuclear project

    Improve nuclear project For personal use only u APS – Palo Verde nuclear generating station u PG&E – Diablo Canyon power plant u PSG&E – Salem generating station u SCE&G – V.C. summer nuclear generating station u TVA – Watts Bar, Sequoyah, Bellefonte and Browns Ferry

  116. Slide 116: Smart Grid

    Smart Grid For personal use only consumerenergyreport.com

  117. Slide 117: Smart Grid – a disruptive technology?

    Smart Grid – a disruptive technology? For personal use only u Not a future technology, set to become ‘business as usual’ u Impacts on all levels of power • Generation • Transmission and distribution and • All WorleyParsons customer sectors 17

  118. Slide 118: Summary

    Summary For personal use only u Polarity evident in the markets u Fossil fuel Improve market continues to expand u Nuclear market will continue to grow and we are well positioned u Network and infrastructure upgrades to support Smart Grid plans will diversify the business

  119. Slide 119: For personal use only

    ay uy “DEVELOPED DEVELOPING ORLD WORLD : we

  120. Slide 120: South Africa / KV3 developments and opportunities

    For personal use only South Africa / KV3 developments and opportunities Francois Jacobs Chief Executive Officer, WorleyParsons RSA

  121. Slide 121: Agenda

    Agenda For personal use only u Historical overview u Merger created u Forward plan u Africa perspective u Infrastructure market drivers u Our core sectors • Infrastructure • Power • Minerals & Metals • Hydrocarbons

  122. Slide 122: Historical overview

    Historical overview For personal use only u WorleyParsons acquires 50% of Pangaea u 2011 – WorleyParsons acquires KV3 and remainder of Pangaea u 1977 – KV3 founded as Vorster, van der Westhuizen & Partners u Focus on consulting engineering services to the public sector u 2001 empowerment deal

  123. Slide 123: Historical overview

    Historical overview For personal use only u KV3 grown to become a leading consulting company u Provides multidisciplinary consulting services

  124. Slide 124: Merger created

    Merger created For personal use only u Strong multi-sector business • Four core sectors • 24 offices • Over 1,300 people u Pursuit of larger and more specialized projects u Multi-sector African hub • Centres of excellence • Projects in 15 countries u Draw on KV3 public sector experience for sub saha

  125. Slide 125: Broad Based Black Economic Empowerment (BBBEE)

    Broad Based Black Economic Empowerment (BBBEE) For personal use only u Business imperative u Addressing the legacy of the past u Investment in our country and our personnel u Benefit from doing it Dr Franklin Sonn right WorleyParsons RSA u Level 3 construction Chairman charter contributor u BBBEE tr

  126. Slide 126: African perspective

    African perspective For personal use only u Second largest continent u Different cultures u Poor infrastructure cuts growth by 2% per annum u Forecast USD93b each year • Currently USD45bn • 50% on power u Priority: regional integration u Africanization - South Africans welcome u South Africa - Afric

  127. Slide 127: Infrastructure market drivers

    Infrastructure market drivers For personal use only u Focus on infrastructure - new and upgrades u Budget of USD120b over the next 3 years u Construction industry moving out of slump and WorleyParsons RSA not affected u Significant projects won through combined capabilities

  128. Slide 128: Infrastructure

    Infrastructure For personal use only Roads u Major road upgrades • Provincial roads department • SANRAL N2 Wild Coast Road Rail u Rail infrastructure depleted • Cape Town airport rail • Transnet coal and iron ore lines Airports u All major airports upgraded recently • Upgrades Cape Town and Johannes

  129. Slide 129: Power

    Power For personal use only u Current projects • Medupi and Kusile power stations • Kalahari solar park u Opportunities • Eskom coal power stations and Improve independent power producers • Renewable energy • Nuclear - government

  130. Slide 130: Hydrocarbons

    Hydrocarbons For personal use only u Current projects • Transnet New Multi Products Pipeline • Sasol VOC brownfields upgrade u Opportunities • Improve • Continuous growth • Large Sasol projects • Cleans fuels upgrade to Euro 4 Standard

  131. Slide 131: Minerals & Metals

    Minerals & Metals For personal use only u Current projects • Sasol Shondoni colliery mine • Rio Tinto Simandou pit to port u Opportunities • Projects throughout Africa for Tier 1 companies

  132. Slide 132: For personal use only

    ay uy “DEVELOPED DEVELOPING ORLD WORLD : we

  133. Slide 133: Oil sands and construction in Canada

    For personal use only Oil sands and construction in Canada Randy Karren Regional Managing Director - Canada

  134. Slide 134: Agenda

    Agenda For personal use only ► Background ► Business trends ► Breadth of services ► Project diversity ► Integrated solutions ► Key differentiators ► Contract models ► Recent projects ► Future opportunities

  135. Slide 135: Background

    Background For personal use only ► Oil Sands - major capital investment driving Canadian economy ► Land locked geographical region ► Environmental sustainability discussions now in public forum ► Heavy oil has many operators, while oil sands mining is restricted to major resource companies ► Most ma

  136. Slide 136: Business trends

    Business trends For personal use only ► Cost certainty is driving lump sum strategies ► Chinese investment is increasing ► Construction labor shortages are prevalent ► Job market has returned to overheated status ► Customers strong preference is to mirror EPC execution team with their own team ► Hei

  137. Slide 137: Breadth of services

    Breadth of services For personal use only ► Engineering and design ► Procurement ► Module fabrication and pre-assembly ► Construction management ► Field construction ► Completions

  138. Slide 138: Project diversity

    Project diversity For personal use only ► Oil sands processing ► Heavy oil processing ► Tailings management ► Water treatment and water management planning ► Pipeline and pipeline facilities

  139. Slide 139: Integrated solutions

    Integrated solutions For personal use only u Significant resources in place, 5000 people u Market is busy and growing saturated u Many global customers now in oil sands u Significant workshare opportunity for global company u Cost competitive solutions are needed

  140. Slide 140: Key differentiators

    Key differentiators For personal use only ► Long-standing involvement in heavy oil and oil sands ► Full EPC project delivery capability ► Fabrication and construction productivity ► Long-term, stable work force ► WorleyParsons differentiators

  141. Slide 141: Contract models

    Contract models For personal use only ► Reimbursable (cost plus fee) ► Fixed fee / reimbursable cost ► Unit rate per quantity fabricated and/or installed ► Converted lump sum at high level quantity certainty ► Full lump sum ► Variations and permutations of above models

  142. Slide 142: Recent projects – MEG Energy

    Recent projects For personal use only Customer: MEG Energy Project: Christina Lake phase 2B Scope: Fabrication and module assembly megenergy.com

  143. Slide 143: Recent projects – Husky Oil

    Recent projects For personal use only Customer: Husky Oil Project: Sunrise wellpads and gathering Scope: EPC WorleyParsons Cord fabrication facility

  144. Slide 144: Recent projects – Imperial Oil / Syncrude

    Recent projects For personal use only Customer: Imperial Oil / Syncrude Project: Aurora tailings management Scope: EPC

  145. Slide 145: Future opportunities

    Future opportunities For personal use only ► Integrated Improve model ► Improve construction services ► Water management ► Tailings management ► High value project delivery

  146. Slide 146: For personal use only

    ay uy “DEVELOPED DEVELOPING ORLD WORLD : we

  147. Slide 147: FLNG and unconventional gas

    For personal use only FLNG and unconventional gas Brian Evans Managing Director - Hydrocarbons

  148. Slide 148: Agenda

    Agenda For personal use only u Hydrocarbons strategy u Unconventional gas • Types • Global distribution • Experience u Floating LNG • LNG process • Advantages • Challenges • Capability • Experience

  149. Slide 149: Hydrocarbons strategy

    Hydrocarbons strategy For personal use only u HSE performance u Global CRM u Maintaining leadership in EPCM delivery u Expanding our Improve offering u Advancing leadership in arctic, heavy oil and enhanced recovery markets u Driving value solutions for the global gas market • Delivery of end to end

  150. Slide 150: Unconventional gas overview

    Unconventional gas overview For personal use only u Different approach to conventional gas reservoirs • high number of wells • spread over a large development region u Technology advancement • horizontal drilling • fracture stimulation • de-watering u Long term planning impact

  151. Slide 151: Unconventional gas

    Unconventional gas For personal use only u European governments encouraging investment • ExxonMobil – Germany and Poland • ConocoPhillips – Poland • Shell – Ukraine and Sweden • Chevron – Poland, Romania and potentially Bulgaria • Total and Hess in France u China opens competition for 1,275tcf • BP

  152. Slide 152: Unconventional gas – Global Opportunities

    Unconventional gas Global Opportunities For personal use only Source: Global Data / Advanced Resources International, Inc. / PESA News

  153. Slide 153: Unconventional gas – Global Opportunities

    Unconventional gas Global Opportunities For personal use only Source: Global Data / Advanced Resources International, Inc. / PESA News

  154. Slide 154: Unconventional gas – Global Opportunities

    Unconventional gas Global Opportunities For personal use only Source: Global Data / Advanced Resources International, Inc. / PESA News

  155. Slide 155: An array of differentiators

    An array of differentiators For personal use only u Lean engineering concept u Full life-cycle integrated water management solutions u Modularisation experience u Local presence u EcoNomics™ and environmental capability in-house u Continuity of team

  156. Slide 156: BP Khazzan - Oman tight gas project

    BP Khazzan - Oman tight gas project For personal use only u Early Production (experimental) phase completed in Oman. u London has just commenced FEED which will go to mid-2012 • 330 wells, 8 -10 drilling rigs being supported by ~1,000 personnel • ~500km of gathering system once fully installed • ~10

  157. Slide 157: LNG chain

    LNG chain For personal use only Source: DRAGONLNG

  158. Slide 158: Floating LNG advantages

    Floating LNG advantages For personal use only u Numerous stranded and remote gas fields u Offshore access and ease of mobility u Cost savings from onshore infrastructure and pipelines u Potentially reduced carbon footprint u Shorter construction schedule

  159. Slide 159: FLNG challenges

    FLNG challenges For personal use only u Safety • Gas transfer in bad weather • Space and fire safety compliance u Technical • Absorption / fractionation columns • Main cryogenic heat exchangers • Sloshing in tanks u Commercial • Risk sharing in owning and trading LNG • Maintenance of production leve

  160. Slide 160: Broad base of capability

    Broad base of capability For personal use only u World leader in offshore engineering u INTECSEA provides deepwater and hull specialists u Early study work u Project experience with FLEX FLNG • Topsides scope • Weight >20,000 tonne • Gas Feed 300 MMSCFDNG • Capacity up to 2.0 mtpa

  161. Slide 161: Summary

    Summary For personal use only u WorleyParsons is extending our project portfolio u Two strong and emerging hydrocarbons horizons u Staked-out leadership positions in each u Globally leveraging footprint and applicable experience and capabilities in new ways u Applying the strength of the broader Hyd

  162. Slide 162: For personal use only

    ay uy “DEVELOPED DEVELOPING ORLD WORLD : we