Metals Exploration Plc · LSE:MTL

Metals Exploration — Corporate Update (January 2019)

31 slides from Metals Exploration's corporate update, Jan 16, 2019

  1. Slide 1: Metals Exploration

    Metals Exploration Building an independent APAC focussed gold producer January 2019

  2. Slide 2: Disclaimer

    Disclaimer  This presentation has been prepared by the management of Metals Exploration Plc for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. It should be read in conjunction with information provid

  3. Slide 3: Executive Summary

    Executive Summary  Metals Exploration (AIM:MTL) is a natural resources exploration and development company focussed on becoming an independent gold producer in the Asia Pacific region  The company wholly owns and operates the low cost Runruno Gold Mine located in the mineral rich province of Nueva

  4. Slide 4: Metals Exploration's value creation strategy & turnaround

    Metals Exploration’s value creation strategy & turnaround 1 Large defined Reserves and 8 Resources 2 8+ years life of mine remaining Operating mine with a long run with significant identified stable production resource / exploration upside potential 7 3 World class environmental, social $270m capex

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot metals®.. exploration

  6. Slide 6: Company overview

    Company overview Company overview Asset location  Metals Exploration (AIM: MTL) is a natural Philippines resources exploration and development company focussed on becoming an Runruno independent gold producer in the Asia Pacific region  The company listed on AIM in 2004 and currently has a market

  7. Slide 7: Experienced board of directors & management

    Experienced board of directors & management Board of Directors & Management overview Darren Bowden – Chief Executive Officer (Appointed January 2019)  Mining Executive with 25 years’ experience building and developing mining projects across Australia, North and South America.Darren has worked acros

  8. Slide 8: Runruno timeline – operational since July 2017

    Runruno timeline – operational since July 2017 Env. Compliance Certificate issued Jul ‘12: Pre-commitment site Jul ‘17: Commercial works commenced production Positive Concept Study identifies commercial FTAA May ‘14: US$83m debt viability issued facility secured Project acquired 2004 2008 2009-2011

  9. Slide 9: Runruno Gold Mining Operations

    Runruno Gold Mining Operations 9

  10. Slide 10: Runruno gold mine

    Runruno gold mine Overview  Unique surface cut and fill mining operation  Delivers ore at an average rate of 165-175kt per month  Operations are 24 hours, 365 days a year  Scheduled mine life is estimated at 8+ years  Environmental Compliance Certificate allows for maximum production of ore of

  11. Slide 11: Mining operations

    Mining operations  Surface cut and fill ― Initial pit is created which is then back filled as mining progresses ― Continuous rehabilitation integrated  Traditional excavator and truck approach, with drill and blast  Ore mined at 2.1Mtpa to 1.6Mtpa over remaining LOM  Total mine movement of 11.3M

  12. Slide 12: Exploration upside

    Exploration upside Significant known exploration upside Exploration targets and geology map  Step-out broad based exploration conducted throughout 2011/12 which supported the Malilibeg South resource estimate  Identification of Runruno style mineralisation south of the pit & potential extension no

  13. Slide 13: Processing

    Processing BIOX – Generation III  The Runruno BIOX® circuit is designed with upside capacity  The target sulphide sulphur grade is 17% S2-  Conventional comminution, gravity and flotation circuits used to produce a gold bearing sulphide concentrate  Refractory ore processed by a Generation III B

  14. Slide 14: Infrastructure

    Infrastructure Power  Grid power from Bayambong (national grid switch yard) c. 36km by transmission line to Runruno (69Kv) Road  Runruno is serviced via a national secondary road and is 26 km from the regional town of Solano  Solano serviced by sealed and concrete surfaced national roads with acc

  15. Slide 15: Mine site layout & sequencing

    Mine site layout & sequencing Overview Mine site layout  LOM strategy is to mine 2 stages contiguously  2019 will focus on mining Stage 1 and Stage 2 – Stage 3 preparation on an opportune basis  2019 waste dumping will be external – some minor backfilling of Stage 1 commenced in late 2018 as a de

  16. Slide 16: Pit design & geology

    Pit design & geology Pit design  Open pit area – 600m x 1,500m  Staged pit which mines longitudinally along the ore body to provide smooth the strip ratio and ore delivery to the plant  Rate of vertical versus horizontal advance is the key criteria in developing the schedule and pit design  Prog

  17. Slide 17: World class environmental standards

    World class environmental standards Production Operations Environmental Controls ROM SIZING WATER MINE DEWATERING MALILIBEG CATCHMENT Feed Material Primary Size Reduction returned from RSI 4 RESIDUE STORAGE GRAVITY GRINDING IMPOUNDMENT Recovery of Liberated Secondary Size DUST CONTROL Gold Reduction

  18. Slide 18: World class environmental standards (cont'd.)

    World class environmental standards (cont’d.) Production Operations Environmental Controls ROM SIZING WATER MINE DEWATERING MALILIBEG CATCHMENT Feed Material Primary Size Reduction returned from RSI 4 RESIDUE STORAGE GRAVITY GRINDING IMPOUNDMENT Recovery of Liberated Secondary Size DUST CONTROL Gold

  19. Slide 19: Residual storage impoundment

    Residual storage impoundment Overview Safety & environment  Waste which has been extracted from the Stage 1 of the  Is designed and constructed to ANCOLD international mine has been and continues to be used to construct the standards for the safe and environmentally acceptable Residual Storage Imp

  20. Slide 20: Recent challenges and solutions

    Recent challenges and solutions Issues Actions and solutions Timing  Dilution rates will be offset by targeting incremental ore  Mine dilution rates higher than in Feasibility Study Ongoing tonnes and increasing milling and flotation throughput  Historical flotation test work of master composites

  21. Slide 21: Tackling the operational challenges

    Tackling the operational challenges To ensure we can tackle the challenges ahead we have commenced the restructure of the Process Plant Management Team, targeting world class area specialist under a new Plant Manager Overall Plant Manager  By incorporating world class Accountability technical speci

  22. Slide 22: Community relations – local impact has been significant

    Community relations – local impact has been significant Multi awarded nationally and internationally Employment – 99% Filipinos Health & Education  Implemented Community Relations Office exceeding Equator  Improved health outcomes based on provision of Principles and World Bank guidelines professi

  23. Slide 23: Environment, health & safety

    Environment, health & safety Environment  Progressive mine rehabilitation – leave the area in better condition, mitigate impact and stabilise the environment ― Sulong River cleaner than prior to the project ― Forests re-established with approx. 2m trees planted to date (LOM c. 5m) ― Soil erosion co

  24. Slide 24: Capital Structure Overview

    Capital Structure Overview 24

  25. Slide 25: Capital structure

    Capital structure Overview 160 Capital structure1 Shares on Issue (m) 2,071 Share price (GBp) 0.8 21.3 Mkt. Cap. (US$m) 21.3 120 Cash in Bank (US$m)1 2.5 8.5 2.5 21.0 Total Debt incl. capitalisation (US$m) 110.9 (US$m) Enterprise Value (US$m) 130.9 28.2 80 108.4 129.7 35.6 110.9 40 5.0 4.0 8.6 - Sta

  26. Slide 26: Debt overview

    Debt overview Debt overview  Metals Exploration is currently in negotiations with its lenders for waivers to its current covenants and repayment schedule  Target are revised agreements with lenders (primarily HSBC and BNP Paribas) ― Metals Exploration is also exploring debt restructuring with new

  27. Slide 27: Conclusion

    Conclusion  The Runruno Gold Project is a large scale fully constructed and permitted, 8+ year estimated LOM project with significant upside exploration potential  Low cost operation with strong upside  Issues in the process of being resolved and set to perform  Designed and constructed to inter

  28. Slide 28: Appendix

    Appendix

  29. Slide 29: Processing

    Processing How the process works 29

  30. Slide 30: Resources & Reserves March 2011 & April 2013

    Resources & Reserves March 2011 & April 2013 Gold Molybdenum Ore (Mt) g/t Moz Au ppm Mlb Reserves Proven 10.2 1.90 0.62 616 13.9 Probable 4.8 1.77 0.27 414 4.4 Total 2P Reserves 15.0 1.85 0.90 603 18.3 Additional Inferred Resource in-pit 2.9 1.73 0.16 258 1.7 Resources Measured 11.2 1.88 0.68 604 14

  31. Slide 31: Liam Ruddy, Company Secretary

    Liam Ruddy Metals Exploration plc Company Secretary 200 Strand, WC2R 1DJ London, UK Tel: +44 (0) 208 133 3433 Tel: +44 (0) 207 539 7272 liam.ruddy@metalsexploration.com

Metals Exploration — Corporate Update (January 2019) on 6ix