  1. Slide 1: A New Benchmark for Sustainable Mining

    A New Benchmark for Sustainable Mining Wyloo Presentation 2024

  2. Slide 2: Confidentiality and disclaimer

    Confidentiality and disclaimer Confidentiality Abbreviations & Acronyms Ring of Fire Metals Pty Ltd. is a member of the Wyloo group of companies (“Wyloo” or the “Company”). B billion Any reproduction or distribution of this presentation, in whole or in part, or the disclosure of its contents without

  3. Slide 3: We are Wyloo

    We are Wyloo Global nickel producer of scale Ring of Fire Greenest nickel in the world All projects located in IRA-compliant Exploration jurisdictions of Australia and Canada Properties Large Pipeline of Projects Kambalda • Production, development & exploration Integrated Battery • Dominant land pac

  4. Slide 4: Wyloo Ring of Fire

    Wyloo Ring of Fire EAGLE’S NEST Developing world-class operations vital for the clean energy transition Our vision is to unearth critical minerals, innovate how we mine and process them, and sustain the planet for future generations. THUNDER BAY In Canada, we’re focusing on the Eagle’s Nest Project:

  5. Slide 5: Backed by a Global Mission

    Backed by a Global Mission GREEN CRITICAL MINERALS $5B Global integrated nickel company producing valuation high-grade clean nickel and other critical minerals Our family of companies is driving global decarbonization through investment in critical minerals and renewable energy $10B Australia’s larg

  6. Slide 6: Eagle's Nest

    Eagle’s Nest Ring of Fire Region, Northern Ontario

  7. Slide 7: Building Eagle's Nest

    Building Eagle’s Nest WEBEQUIE WEBEQUIE SUPPLY ROAD EAGLE’S NORTHERN NEST ROAD LINK MARTEN FALLS Ring of Fire region home to high grade nickel, copper, Ontario MARTEN FALLS cobalt, PGE and chromite ACCESS ROAD Quebec Eagle’s Nest Nakina Located ~500 km northeast of Thunder Bay ONTARIO Eagle’s Nest t

  8. Slide 8: Building Eagle's Nest

    Building Eagle’s Nest 0m 20 Year 15,000 tpa Potential Mine-Life Nickel in Concentrate 250m UNDER- GROUND Traditional 3,000 tpd underground mine 500m (blast hole open stope) with paste backfill ANNUAL 15kt Ni / 6kt Cu in separate high quality 750m PRODUCTION (also 70koz Pd / Ni / Cu concentrates  22

  9. Slide 9: To support midstream capacity

    To support midstream capacity Establishing Ontario as a leader in North America’s EV supply chain Strategically located near ‘highway’ of gigafactories in the US and Canada Committing $25M toward feasibility studies to Wyloo – IGO Limited nickel processing plant: investigate potential for • 30% inte

  10. Slide 10: Our Path to Production

    Our Path to Production Opportunity to supply Ontario and Canada with high-grade nickel sulphide mined sustainably in partnership with local communities Working with Federal and Provincial Mine planning (Optimization studies) governments on permitting and approvals Environmental studies Our Timeline

  11. Slide 11: People

    People Genuine Partnerships & Collaboration with Local Communities

  12. Slide 12: Collaboration with Indigenous and Local Communities

    Collaboration with Indigenous and Local Communities Our vision is to develop the Ring of Fire deposits while partnering with local Indigenous communities and working alongside contractors, suppliers and surrounding communities Signed MOUs Memorandum of Understanding Working towards Webequie Marten F

  13. Slide 13: First Nations Empowerment

    First Nations Empowerment CURRENT 50%+ Indigenous employment EMPLOYMENT at Esker Site Create and sustain Indigenous Proven Experience: TRAINING & EMPLOYMENT employment opportunities We believe PROGRAM One of Australia’s development in this Provides guaranteed employment for largest Indigenous region

  14. Slide 14: Sustainability

    Sustainability Sustainability at the Heart of our Design

  15. Slide 15: Sustainability at the heart of our design

    Sustainability at the heart of our design Minimal surface disturbance ~1KM2 Underground tailings storage DEVELOPMENT FOOTPRINT  NO  surface tailings, surface quarry, open pit, waste rockpiles  Reduces dust generation, visual impact, inundation risks and potential run-off pollution Mine design on

  16. Slide 16: Underground Tailings Solution

    Underground Tailings Solution The first mine of its kind where 100% tailings will be stored underground. The construction of a road simultaneously with the mine removes the need for a surface tailings dam, creating one of the smallest footprint mines in the world. 1 Aggregate rock (~4Mt) from declin

  17. Slide 17: Net Zero Initiatives

    Net Zero Initiatives Going the extra mile: investigating sustainable technologies to complement existing mine design TECHNOLOGY RENEWABLE ENERGY / POWER ENVIRONMENT AllElectric All electric mine HighWind energy Pressure Flotation Electrical Solar Ontario grid / Wind Biomass Carbon Mine Grinding Roll

  18. Slide 18: Our Leadership Team and Our Values

    Our Leadership Team Our Values

  19. Slide 19: Our Leadership – Canada

    Our Leadership – Canada Kristan Straub Annie Sismanian Stephen Crozier CEO CFO VP Sustainability previously Global Mining Executive, previously CFO, previously VP Sustainability, Glencore Nickel Kuya Silver IAMGOLD Sylvain Goyette Glenn Nolan Ryan Weston VP Projects VP Indigenous VP Exploration prev

  20. Slide 20: Wyloo is an organization driven by a set of values

    Wyloo is an organization driven by a set of values. Humility Courage & Empowerment Enthusiasm ᑕᐸᓭᓂᒧᐏᐣ Determination ᒪᐡᑲᐍᓂᒧᑐᑕᒧᐏᐣ ᒋᑫᓂᒧᐣ ᒪᐡᑲᐏᔭᐣ & ᑌᐱᓇᒪᓱᐣ Family Frugality Generating Integrity ᑎᐯᐣᒋᑫᐏᐣ ᒪᓇᒋᒋᑫᐣ Ideas ᒋᓂᑕᑌᐻᔭᐣ ᑲᓇᓇᐣᑕᐍᐣᑕᓇᐣ ᑫᑐᒋᑲᑌᑭᐣ Safety Stretch Targets ᐊᐣᑿᒥᓯᐏᐣ ᓇᐣᑭᓇᐣ ᑲᑲᑵᑌᐱᓂᑲᑌᑭᐣ 20

  21. Slide 21: Thank You and Miigwech

    Thank You and Miigwech www.wyloo.com