  1. Slide 1: Mali: Committed to a new decade of investment and delivery

    Mali Committed to a new decade of investment and delivery 1

  2. Slide 2: Cautionary Statement on Forward Looking Information

    Cautionary Statement on Forward Looking Information Certain information contained in this presentation, including any information as to Barrick’s strategy, plans, or future financial or operating performance, constitutes “forward- looking statements”. All statements, other than statements of histori

  3. Slide 3: The leading African gold miner

    The leading African gold miner Jabal Sayid (50%) Loulo-Gounkoto (80%) Morila (40%) Massawa (83.25%) Kibali (45%) Tongon (89.7%) North Mara (84%) Lumwana Bulyanhulu (84%) Buzwagi (84%) Gold production Projects Tanzania Copper production

  4. Slide 4: Committed to a new decade of investment and delivery

    Committed to a new decade of investment and delivery… 2012 2013 2014 2015 2016 2017 2019 Record production Loulo Complex RRL production +1.2Moz +1.25Moz Gounkoto Randgold – Barrick Morila mine life record exceeds 1Moz RRL group RRL group super pit merger extended production LTIFR down 18% production

  5. Slide 5: Loulo-Gounkoto: what we found and what we've established

    Loulo-Gounkoto … what we found and what we’ve established

  6. Slide 6: Loulo-Gounkoto: what we found and what we've established

    Loulo-Gounkoto: what we found and what we’ve established

  7. Slide 7: Loulo-Gounkoto: what we found and what we've established

    Loulo-Gounkoto: what we found and what we’ve established

  8. Slide 8: Communities today

    Communities today... BARRICK

  9. Slide 9: Safety, health and environment: Mali

    Safety, health and environment…Mali Safety YTD LTIFR/Million Hours Worked 1,4 Improved safety performance year on year with LTI’s decreasing from 4 to 2 and LTIFR from 0.67 to 0.31 at Loulo, while Gounkoto achieved 1,2 LTI free year for 2 consecutive years 1 0,8 Continue to apply ISO 45001:2018 Safe

  10. Slide 10: Safety, health and environment: Mali

    Safety, health and environment…Mali HIV Positivity Rate HIV 2 HIV up from 2018, but significantly down from 2015 and the VCT number increased year on year. 1,5 Collaboration with local NGOs working in the surrounding villages. 1 HIV program audited and improvement plan developed. Preventative action

  11. Slide 11: FINA reserve

    FINA reserve… biodiversity offsetting project for Mali mines Convert residual environmental impact of Loulo, Gounkoto and Morila mines into conservation program of the FINA reserve 2020: Establish team, office; open 20km of 2021: Creation of 300km squared of cattle 2022: Fencing off area of 200km sq

  12. Slide 12: Delivering on 2019 business plan

    Delivering on 2019 business plan… Loulo-Gounkoto Complex exceeding guidance by producing 714,802 ounces1 Gounkoto UG feasibility update completed supporting its development to commence in 2020 - significant growth potential Yalea and Gara now deliver consistently to plan Innovation with RAMJACK proj

  13. Slide 13: Loulo UG development and mining

    Loulo UG development and mining2… UG ore tonnes Q4 2019 Ore tonnes achieved during quarter - 725Kt Stope tonnes Dev tonnes Overall mining compliance improved to over 90% 300 Commenced single hole auto drilling with Solos during 250 Tonnes ‘000s shift change 200 Record production of paste during quar

  14. Slide 14: Ramjack Newtrax update

    Ramjack Newtrax update… The project will automate the control of Yalea Mine secondary fans based on personnel and vehicle activities on the levels as well as the production and location tracking and safety management capabilities of the Newtrax system. This is achieved through the combination of thr

  15. Slide 15: Gounkoto underground project

    Gounkoto underground project… Key Highlights Gounkoto UG feasibility update completed On track to start development in Q4 2020 Potential additional ounces for the complex

  16. Slide 16: Gounkoto Open Pit

    Gounkoto Open Pit2… Ore Tonnes Mined Q4 2019 700 1,350Kt ore mined in Q4 600 Thousands Effective water management system was in place during the rainy 500 season 400 300 Excavator & truck availabilities were maintained above 80% 200 Waste stripping 100 247 469 633 6,958Kt mined in Q4 with improvemen

  17. Slide 17: Production, recovery and throughput

    Production, recovery and throughput1… Tonnes million Oz 000 % 6 1 200 100,00 97,00 5 1 000 94,00 91,00 4 800 88,00 85,00 3 600 82,00 2 400 79,00 76,00 1 200 73,00 70,00 - - 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Gold Produced oz Tons treated Plant Recovery %

  18. Slide 18: Loulo Power Generation Blend (HFO: LFO)

    Loulo Power Generation Blend (HFO: LFO)… Total power generated MWh Power unit cost $/kWh 40000 0,200 35000 30000 0,150 25000 20000 0,100 15000 10000 0,050 5000 0 0,000 Nov-19 Dec-19 Nov-18 Dec-18 Feb-19 Jul-19 Feb-18 Jul-18 May-19 Aug-19 Sep-19 May-18 Aug-18 Sep-18 Oct-19 Oct-18 Apr-19 Apr-18 Jan-19

  19. Slide 19: Loulo Solar Project: Construction Updates

    Loulo Solar Project… Construction Updates Construction: Earthworks by local contractor EGTF: Completed and handed over to JAD Topographic pegs of 1st 5 MW has been completed Trenches of Zone 1A have been completed Project split into four phases with commissioning of Phase 1 (5 MW) March 2020 Phase 2

  20. Slide 20: TSF capacity - Upgrade in 2020 to sustain LOM operation

    TSF capacity - Upgrade in 2020 to sustain LOM operation… Tailings Surface New TSF =127Ha Current TSF =171Ha Combined TSF =298Ha Tonnages deposition split New TSF = 22.7 Mtons Current TSF = 24 Mtons Combined TSF (last 5 years) = 10MTons Total tonnage 56.7 million tonnes New TSF upgrade milestones (as

  21. Slide 21: Loulo District: Tier 1 Destination

    Loulo District…Tier 1 Destination Major Mine Exploration Focus Area Satellite Mine Gounkoto Permit: Robust, untested auger anomalies verified on Gounkoto Domain Boundary and Faraba Structures Loulo Permit: for Q1 2020 drill test At Yalea, 320m step out drilling south of Yalea Transfer Robust drill r

  22. Slide 22: Yalea System: New Emerging Shoot Trends

    Yalea System… New Emerging Shoot Trends… Key Observation: Bold step out drilling 320m south of the Transfer Zone, intersects potential continuation of system Scout drilling confirms northern extension of Panel Zone and HW splay geometry Next Steps: Continue step out scout drilling, south of the Tran

  23. Slide 23: Gounkoto MZ1: Assessing UG Potential

    Gounkoto MZ1…Assessing UG Potential Key Observations: High grade intersections returned at the base of the current MZ1 Shoot Subordinate and narrower high- grade shoot trends defined to the north - open down plunge Next Steps: Complete 160m step out holes on the higher-grade shoots to the north (Q1/

  24. Slide 24: Loulo-Gounkoto: development of local skills

    Loulo – Gounkoto… development of local skills Total Employees: 4 593 Contractors Nationals: 4 387 (96%) Expats Expats: 206 (4%) 80 (2%) Mine Mine Expats Nationals Permanent 126 (3%) 1 640 (36%) Contractors Temporary Nationals Nationals 2 410 (52%) 337 (7%) *Totals may not add due to rounding

  25. Slide 25: Local contractors and supply strategy

    Local contractors and supply strategy… $313 million spent on local contractors and suppliers in 2019 (services rendered, goods and fuel supply) $500K provision created for an incubation project focused on incorporating local contractors into the mining industry Partnership with Malian contractors Mi

  26. Slide 26: Barrick: contribution to Mali economy

    Barrick…contribution to Mali economy Barrick/Randgold operations have contributed approximately US$ 7.2 billion to the Malian economy in the form of taxes, royalties, salaries and payments to local suppliers in the last 23 years Contribution to Malian % Contribution to Malian GDP Economy 10% LOULO 9

  27. Slide 27: Dividends, Taxes and Royalties paid to Mali

    Dividends, Taxes and Royalties paid to Mali… Barrick/Randgold operated mines have paid approximately US$ 2.7 billion in the form of Dividends, Taxes and Royalties to the State over 23 years Dividends to Dividends, Taxes and Barrick Royalties to the State US$ 1.0 billion US$ 2.7 billion

  28. Slide 28: Loulo-Gounkoto CSR - governance and stakeholder engagement

    Loulo-Gounkoto CSR - governance and stakeholder engagement… >$11m invested to date; $29.6m patent paid Potable water 57 boreholes and 4 water supply systems constructed Regular water quality analysis with annual feedback sessions held in villages Establishment of water management committees in villa

  29. Slide 29: Loulo-Gounkoto: update of agricultural development

    Loulo-Gounkoto… update of agricultural development Capital of $2.2 million over 5 Infrastructure (Center) Accommodation, classrooms, years funded by Loulo-Gounkoto conference room, fishponds, poultry, 1 center and 5 incubation farms admin, canteen constructed Infrastructure 5 farms X 5ha specialized

  30. Slide 30: Agribusiness: Installed entrepreneurs

    Agribusiness…Installed entrepreneurs 48 entrepreneurs established Support from the mine – water supply system +212 million FCFA of credit granted 30 farms created 5 farms of 4.9ha for plantation 4 farms of 4.7ha for poultry 4 farms of 5.7ha for cattle fattening 14 farms of 27.8ha for gardening 3 far

  31. Slide 31: Morila: Successful transition to tailings treatment

    Morila… Successful transition to tailings treatment TSF reclamation treatment methodology Environment Benefit: Mitigate the dust impact coming from TSF No impact on the groundwater quality at the two Sanso water supply boreholes (Boreholes 866 and 923) 149,330oz2 produced by reclaiming the TSF mater

  32. Slide 32: Morila after closure - current projects

    Morila after closure - current projects > $2m spent to develop Morila into a commercial agricultural hub Poultry farming Fish farming Honey farming Mango farming

  33. Slide 33: Illegal mining

    Illegal mining… Issues Invasion of permits and mining areas Use of mechanical equipment causing severe damage Dredging the river State not enforcing the law Use of dangerous chemicals (cyanide & mercury) Major environmental damage: siltation and contamination of river and ground water Security and s

  34. Slide 34: Outstanding legal and fiscal issues

    Outstanding legal and fiscal issues… working towards amicable solutions The dispute over tax and related issues has near full resolution which allows us to look forward to continue to grow our partnership with the Mali Government and its people; Strong engagement by demanding the application of our

  35. Slide 35: Endnotes

    Endnotes… 1. On a preliminary 100% basis. Our 2019 attributable production forecast is 520 - 570 thousand ounces for Loulo-Gounkoto. 2. On a preliminary 100% basis. Technical Information The scientific and technical information contained in this presentation has been reviewed and approved by: Rodney

  36. Slide 36: Appendix A - Yalea Transfer and Panel Zones Significant Intercepts

    Appendix A - Yalea Transfer and Panel Zones Significant Intercepts i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2m; internal dilution is equal to or less than 2m total width. ii. Transfer/Panel Zone drill hole nomenclature: prospect initial Y/YA

  37. Slide 37: Appendix B - Gounkoto MZ1 Significant Intercepts

    Appendix B - Gounkoto MZ1 Significant Intercepts i. All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2m; internal dilution is equal to or less than 2m total width. ii. Gounkoto drill hole nomenclature: prospect initial GK (Gounkoto), GKUG (Gounkoto Und