Slide 1: Oyu Tolgoi: Creating long-term value at world's best developing copper project
TD Securities Mining Conference JANUARY 18-19, 2017 Oyu Tolgoi:Creating long-term value at world’s best developing copper project
Slide 2: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis Oyu Tolgoi expected to be world’s third-largest copper mine with underground Hugo North Lift 1 financing in place1 Timing of underground benefits from expected drop in copper supply (~2020) Oyu Tolgoi’s resources provide long-term development optionality 1. Financi
Slide 3: Long-term copper fundamentals strong
Long-term copper fundamentals strong Copper supply/demand outlook Copper market likely to be in Base Highly Probable Primary Demand Annual avg cu price balance in 2017 30 $4 Forecast Ongoing attrition at existing mines driven by declining Annual average LME copper price (US$/lb) 25 grade $3 Copper s
Slide 4: Oyu Tolgoi underground a Tier 1 asset
Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Cost S
Slide 5: Potential full-production valuation upside
Potential full-production valuation upside Indicative valuation1 (US$B) EV/Reserves EV/M+I+I Resources5,6 Price/NAV TRQ EV/Reserves ($/lb.) TRQ EV/M+I+I Resources ($/lb.) TRQ P/NAV $0.17 $0.06 0.82x Trading comps2 Average EV/Reserves ($/lb.) Average EV/M+I Resources ($/lb.) Average P/NAV Current EV3
Slide 6: 2016 Reserves Case mining areas
2016 Reserves Case mining areas Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 1 Underground Open Pit Plant Ramp-up (2020-2027), full production (~33mtpa) Open-pit mine tops-up concentrator when
Slide 7: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Exc
Slide 8: Key underground components
Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre
Slide 9: 2016 Resources Case
2016 Resources Case Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 2 ~700
Slide 10: Alternative Production Cases
Alternative Production Cases Resources 120 Case • Assumes ~Year 20, concentrator expanded to 120mtpa • NPV8% $8.80 billion1 • Expansion capital costs of $14.86 billion3 Resources 100 Case • Assumes ~Year 20, concentrator expanded to 100mtpa • NPV8% $8.88 billion1 Resources 50 Case • Expansion capita
Slide 11: Production highlights
Production highlights Open-pit All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.11 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved
Slide 12: Financial highlights
Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,437 $719 $1,344 $651 $381 $863 Cu:$3.10 Cu:$2.49 Cu:$2.15 Au:$1,266 Au:$1,160 Au:$1,259 2013 2013 2014 2015 Q3'16 YTD Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 Q3'16 Strong cash position Consecutive periods of pos
Slide 13: Production and financial guidance
Production and financial guidance 2016 2017 Copper in concentrates 175,000 – 195,000 tonnes 130,000 – 160,000 tonnes Gold in concentrates 255,000 – 285,000 ounces 100,000 – 140,000 ounces Operating cash costs $840 million $720 million Capital expenditures $200 million (open pit) $100 million (open p
Slide 14: Managing near-term ore grade challenges
Managing near-term ore grade challenges Phase 3 nearly complete (2017) Phase 6 and lower-grade stockpile ore processed mid-2016 to mid-2018 Phase 4 waste mining critical, uncovers 2017 medium-grade ore, then 2018 high-grade ore Primary Crusher 2017-18 Ore (Phase 4a & 6, stockpiles) Waste Tailings Du
Slide 15: Oyu Tolgoi's impact in Mongolia
Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $5.9B At the end of Q3’16, ~94% Between 2010 and 1H’16, Between 2010 and Q3’16, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $5.9B in Mongolia1
Slide 16: Oyu Tolgoi – a long-term growth opportunity
Oyu Tolgoi– a long-term growth opportunity Underground development progressing Long-term development optionality and plant expansion opportunities Open-pit mine performing as expected in low gold areas Demonstrated productivity and cost improvements Oyu Tolgoi is the best copper asset in development
Slide 17: Appendix
Appendix
Slide 18: Approved underground CAPEX
Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3 Underground expansion capital, VAT and escalation of $5.3 billion Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 18
Slide 19: Project financing – flow of funds
Project financing – flow of funds At September 30, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $2.9 billion Shareholder loan: $2.9 billion Payable to Turquoise Hill* Receivable from Oyu
Slide 20: Oyu Tolgoi at China's doorstep
Oyu Tolgoi at China’s doorstep 20