  1. Slide 1: McEwen Mining AGM 2013

    McEwen SiViinine Prvse MUX 1% AGM 2013

  2. Slide 2: Agenda

    Agenda 1. Formal Meeting 2. Financial Overview 3. Operation + Exploration Update 4. Gold Market Overview 2

  3. Slide 3: Formal Meeting

    FORMAL MEETING Nils Engelstad Vice President, Corporate Affairs & Secretary 3

  4. Slide 4: Financial Overview

    FINANCIAL OVERVIEW Perry Ing Chief Financial Officer 4

  5. Slide 5: Cautionary Statement

    Cautionary Statement Forward Looking Statements This presentation contains certain forward-looking statements and information, including "forward- looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed,

  6. Slide 6: Statement of Operations

    Statement of Operations Year ended Three months ended Dec 31, 2012 Mar 31, 2013 Income from MSC $20,835 ($237) Gold and silver sales from El Gallo 1 $5,966 $13,498 Production costs applicable to sales from El Gallo 1 ($3,861) ($10,593) Gross margin $22,940 $2,668 Mine operating and construction cost

  7. Slide 7: Argentina

    Argentina 2012 2013 San Jose Mine (100%) Q1 Q2 Q3 Q4 Q1 Gold eq. oz sold 34 40 71 53 30 Avg realized price / gold eq. oz $1,807 $1,441 $1,699 $1,623 $1,519 Cash cost / gold eq. oz $688 $752 $764 $794 $966 All-in sustaining cost / gold eq. oz $1,236 $1,232 $1,122 $1,226 $1,520 Implied economic contri

  8. Slide 8: El Gallo 1

    El Gallo 1 2012 2013 Q1 Q2 Q3 Q4 Q1 Gold eq. oz produced - - - 6.7 6.8 Gold eq. oz sold - - - 3.2 8.2 Avg realized price / gold eq. oz - - - $1,725 $1,639 cash cost / gold eq. oz - - - - $742 All-in sustaining cost / gold eq. oz - - - - $1,483 Implied economic contribution - - - - $1,279 In thousand

  9. Slide 9: All-In Sustaining Cost / oz

    All-In Sustaining Cost / oz Dec 31, 2012 Mar 31, 2013 Total cash costs for El Gallo 1 Production costs applicable to sales (1) - $10,593 Less: Depreciation - (669) Less: Pre-stripping costs for future pit access - (3,813) Total cash costs as reported by MSC (49%) 73,311 14,159 Total consolidated cas

  10. Slide 10: Balance Sheet

    Balance Sheet Dec 31, 2012 Mar 31, 2013 Cash and gold and silver bullion $72,611 $46,812 IVA taxes receivable $9,150 $7,887 Inventories $7,262 $6,692 Mineral Properties $767,067 $766,675 Investment in MSC $273,948 $273,711 Total Assets $1,150,937 $1,124,963 Deferred Tax Liability $229,522 $223,059 T

  11. Slide 11: Liquid Assets

    Liquid Assets Dec 31, 2012 Mar 31, 2013 May 15, 2013 Cash $70,921 $45,122 $37,499 Gold and silver bullion (1) $2,063 $1,983 $1,708 Inventories – Gold and silver doré (1) $5,962 $3,555 $6,990 Total $78,946 $50,660 $46,197 In thousands of US dollars (1) Based on London PM close as of December 31, 2012

  12. Slide 12: Share Capital

    Share Capital Jan 24, 2012 Dec 31, 2012 Mar 31, 2013 (Merged with Minera Andes) Common & Exch. Shares* 267,084 296,025 297,086 Options 6,000 4,581 4,522 Fully Diluted Shares 273,084 300,606 301,608 In thousands 12

  13. Slide 13: December 2012 Rights Offering Raised $61 Million

    December 2012 Rights Offering Raised $61 Million Fully Subscribed Low Cost Shareholder Friendly 13

  14. Slide 14: Operational + Exploration Update

    OPERATIONAL + EXPLORATION UPDATE IAN BALL Senior Vice President 14

  15. Slide 15: Key Assets

    Key Assets Gold Bar Gold El Gallo 1 Mine El Gallo 2 Permitting Gold Silver Production Permitting Los Azules Copper Copper San José Mine (49%) Exploration Silver / Gold Production 15

  16. Slide 16: 2012 AGM Growth Forecast

    2012 AGM Growth Forecast What We Told You Last Year 290,000 oz 180,000 oz 105,000 oz 130,000 oz Achieved On Track 2012A 2013E 2014E 2015E San José El Gallo 1 El Gallo 2 Gold Bar *Gold equivalent 16

  17. Slide 17: Gold Price 2012 - Present

    Gold Price 2012 - Present $280 / oz Decline May Gold 2012 $1,650 / oz May Gold 2013 $1,370 / oz *As of May 15, 2013 17

  18. Slide 18: Mining IPOs Dry Up in Q1

    Mining [POs dry up in QI NP. CaNapIAN Press | 13/04/01 11:37 AM ET More from Canadian Press Junior miners fret over lack of investment Northern Ontario mineral exploration has dropped dramatically, observers say cBcnews | Posted: Mar 5, 2013 11:49 AM ET Financing for junior mining feels the pinch |T

  19. Slide 19: If there's a way to do it better... find it

    “IF THERE’S A WAY TO DO IT BETTER… FIND IT.” THOMAS A. EDISON 19

  20. Slide 20: El Gallo 1 Mine: Mexico

    El Gallo 1 Mine: Mexico 20

  21. Slide 21: El Gallo 1: Expansion Drivers

    El Gallo 1: Expansion Drivers Announced This Morning 1. Exploration Success 2. Small Capital Requirements 21

  22. Slide 22: El Gallo 1 Mine

    El Gallo 1 Mine Heap Leach Pad Samanegio Pit Lupita Pit New Central Sagrado Discovery Pit 22

  23. Slide 23: El Gallo 1: Central Zone - Growth

    El Gallo 1: Central Zone - Growth 23

  24. Slide 24: El Gallo 1: Central Zone - Growth

    El Gallo 1: Central Zone - Growth 24

  25. Slide 25: $5 Million Capital to Expand El Gallo

    Capital to Expand El Gallo 1 3,000 4,500 ore tonnes per day $5 Million Internally Financed 25

  26. Slide 26: El Gallo 1 Expansion $5 Million

    El Gallo 1 Expansion $5 Million Process Plant $2.0 M Heap Leach Pad Expansion $2.5 M Crushers $0.5 M 26

  27. Slide 27: El Gallo Mine: Increasing Gold Production

    El Gallo 1 Mine Increasing Gold Production 75,000 oz 60,000 oz 37,500 oz 27,300 oz 2013E 2014E 2015E 2016E El Gallo 1 El Gallo 1 Prior Est. Expansion Est. 27

  28. Slide 28: El Gallo 2: Mexico

    é j ; ha Ye he ie Ai _ ~~ . $a Lo tas . ; 1 ee ke les — oe El Gallo 2 exe) Mex

  29. Slide 29: El Gallo: What Method is Best?

    El Gallo 2 What Method is Best? Today $ New Mill Heap Leach Defer 29

  30. Slide 30: El Gallo 2: Heap Leach Processing

    El Gallo 2: Heap Leach Processing How is this Possible? 1. El Gallo 1 & 2: Only 5 km apart 2. El Gallo 2: Early Heap Leach Results Positive 30

  31. Slide 31: El Gallo 1 & 2: Close Proximity

    El Gallo 2 El Gallo 1 & 2: Close Proximity El Gallo 1 Mine 5 km Road 31

  32. Slide 32: El Gallo 2: Heap Leach Recovery

    El Gallo 2: Heap Leach Recovery Early Test Results 45 – 65% Silver Recoveries 32

  33. Slide 33: El Gallo 2: Next Steps

    El Gallo 2: Next Steps 1. Establish Silver Recovery 2. Confirm Costs 3. Decide Process Method 33

  34. Slide 34: Los Azules: Argentina

    4 me . gi Se ! = Et ae — = Los Azules: Argentina

  35. Slide 35: Possible Financing Sources

    Possible Financing Sources Sale / JV Los Azules Lease / Debt / Equity 35

  36. Slide 36: Los Azules Resource Growth

    Los Azules Resource Growth Billion Pounds Copper 14.3 10.8 10.3 11.2 4.6 5.4 2.2 2008 2010 2012 2013 Indicated Inferred 36

  37. Slide 37: Comparing Market Caps

    Comparing Market Caps Lumina Copper $315 Million Los Azules 2/3 Size = $200 Million *As of May 15, 2013 37

  38. Slide 38: Los Azules: Possible Source of Funding

    Los Azules: Possible Source of Funding Asset Sale or JV For Sale 38

  39. Slide 39: Los Azules vs Lumina Copper

    Los Azules vs Lumina Copper Argentina Copper Development Projects 50% Resource Los Azules(1) Taca Taca(2) Growth Since PEA (McEwen) (Lumina) Production 375,000 535,000 Capex $2.8 Billion $3.0 Billion Cash Cost $0.96 $1.11 Net by-product Copper Grade 0.50% 0.45% Strip Ratio 1.3:1 1.6:1 Mine Life 26 Y

  40. Slide 40: Los Azules Updated PEA Due Q3

    Los Azules Updated PEA Due Q3 40

  41. Slide 41: San José: Argentina

    San José: Argentina 41

  42. Slide 42: San José Mine: Forecast 2013

    San José Mine: Forecast 2013 Gold & Silver Production, Gold Eq. Argentina 102,700 oz 12 Yr Annual Mine Life $750 / oz $1,300 / oz Cash Cost Total Cost High-Grade Gold + Silver *Silver : Gold ratio (52:1) 42

  43. Slide 43: San José Mine

    San José Mine The Good The Bad Resource Size All Time High 20 – 25% Inflation Grade vs 2011 Unions Production 5 Years Changing Regulations 43

  44. Slide 44: San José: High Grade

    San José: High Grade Comparison of High-Grade Deposits 20 Pretium Rubicon HOC / McEwen Phoenix Valley of Kings San José 16 Grade (Au gpt Eq.) Goldcorp Red Lake 12 Yamana Goldcorp El Penon Cerro Negro 8 Goldcorp Elenore Mine 4 Development Exploration 0 0 2 4 6 8 10 12 14 *Source: company reports Size

  45. Slide 45: Gold Bar: Nevada

    Gold Bar: Nevada 45

  46. Slide 46: Gold Bar – Cortez Trend, Nevada

    Gold Bar – Cortez Trend, Nevada Next to World’s Largest Gold Mine 46

  47. Slide 47: Gold Bar Production Forecast

    Gold Bar Production Forecast Construction Forecasted to Begin 2014 Nevada 50,000 oz Au 2015 Annual Production Starts $700/oz $850/oz Au Eq Cash Cost Total Cost 8 Yr Capex Mine Life $55 M 47

  48. Slide 48: Gold Bar: Previously Mined

    Gold Bar: Previously Mined Haul Road Open Pit Open Pit Waste Dump 48

  49. Slide 49: Gold Bar: Previously Mined

    Gold Bar: Previously Mined Open Pit Haul Road Waste Dump 49

  50. Slide 50: Growth Scenarios by 2016

    Growth Scenarios by 2016 El Gallo 2 Mill El Gallo 2 El Gallo 2 2012 AGM Est. Heap Leach Deferred 290,000 oz 285,000 oz 225,000 oz *Gold equivalent production (52:1 silver/gold ratio) 50

  51. Slide 51: MUX / Gold Market Overview

    MUX / GOLD MARKET OVERVIEW ROB McEWEN Chief Owner 51

  52. Slide 52: Our Goal: Qualify for S&P

    Our Goal Qualify For S&P 500 52

  53. Slide 53: Forecast Annual Production Growth

    Forecast Annual Production Growth 2015 Est. Cash Cost $750 / oz 2015 Est. Total Sustaining Cost $1,000 / oz 290,000 oz 180,000 oz 130,000 oz ? 105,000 oz 2012A 2013E 2014E 2015E San José El Gallo 1 El Gallo 2 Gold Bar *Gold equivalent 53

  54. Slide 54: El Gallo 2: Capex

    El Gallo 2: Capex $180 Million Construction Other, $5.0 Contingency, Owners Equipment, $10.0 $18.8 Cost, $8.8 Final Cement/Steel, Engineering, $8.5 $37.0 Construction Management, $12.0 Spares, $2.0 Construction Plant Equipment, Labour, $22.0 $57.0 54

  55. Slide 55: Assumptions: Los Azules / El Gallo 2

    Assumptions: Los Azules / El Gallo 2 1. Increase Its Value Through Exploration 2. Sale would cover El Gallo Capex 3. Sale Would Allow Non-Dilutive Build 55

  56. Slide 56: Subsequent Events

    Subsequent Events 1. Increased Copper Resource Significantly 2. Mega Project: Less Enthusiasm 3. Argentina: Less Attractive 4. Silver/Gold Prices Fall – Adverse Impact IRR 5. Cost of Capital High 56

  57. Slide 57: Adversity Mother of Innovation

    Adversity Mother of Innovation 57

  58. Slide 58: Expand with Less Capex

    Expand with Less Capex 58

  59. Slide 59: Expand El Gallo 1 Internally Funded

    Expand El Gallo 1 Internally Funded 59

  60. Slide 60: Issue at Hand: Financing El Gallo 2

    Issue at Hand Financing El Gallo 2 60

  61. Slide 61: Development Economics – El Gallo 2

    Development Economics – El Gallo 2 Silver Price / NPV 5% Payback oz (Millions) After Tax IRR $30.00 $212 2.0 39% $27.50 $165 2.2 33% $25.00 $118 2.6 26% $22.50 $71 3.0 18% $20.00 $23 4.1 10% 61

  62. Slide 62: MUX Cost of Capital

    | MUX Cost of Capital Percent 45 40 35 30 25 20 15 10 Gere Now) 5 All Debt All Equity 40% Debt / Equity 0 $1 $2 Share Price $3 $4 62

  63. Slide 63: Cash Scenarios: Working Capital

    Alternatives Cash Scenarios 100 Working Capital ($ Millions) 50 Stop all work El Gallo 2 on hold 0 Finish Mill -50 Engineering Stop Gold Bar work -100 -150 Projects Maintaining Timeline -200 Q2-13 Q4-13 Q2-14 Q4-14 *Gold $1,350 Silver $23.00 63

  64. Slide 64: El Gallo Mill, Heap Leach, Defer

    El Gallo 2 Mill Heap Leach Defer 64

  65. Slide 65: Growth Scenarios by 2016

    Growth Scenarios by 2016 El Gallo 2 Mill El Gallo 2 El Gallo 2 2012 AGM Est. Heap Leach Deferred 290,000 oz 285,000 oz 225,000 oz *Gold equivalent production (52:1 silver/gold ratio) 65

  66. Slide 66: It's Money

    It’s Money 66

  67. Slide 67: Big, Persistent, Growing Concern

    Big, Persistent, Growing Concern US National Debt $16.8 Trillion EU Debt $11.3 Trillion 67

  68. Slide 68: Massive Monetary Easing

    MASSIVE MONETARY EASING 68

  69. Slide 69: Non-Existent Interest Rates

    Non-Existent Interest Rates 69

  70. Slide 70: Troubling Developments: Alert

    Troubling Developments: Alert Cyprus – Currency Controls ABN Amro – Defaulting on Gold Argentina – Currency Controls 70

  71. Slide 71: Ignore History at Your Risk

    Ignore History at Your Risk *As of May 15, 2013 71

  72. Slide 72: Strong Economies, Central Banks Buying Gold

    Strong Economies Central Banks Buying Gold 72

  73. Slide 73: SocGen – Gold: Down or Up?

    SocGen – Gold: Down or Up? April 2, 2013 $1,375 Foreign Exchange Team April 25, 2013 $10,000 Global Strategist 73

  74. Slide 74: Gold Shares Very Attractive

    Gold Shares Very Attractive Huge Divergence *As of May 15, 2013 74

  75. Slide 75: White House Effect

    White House Effect Performance of XAU 80% Presidential Election Year 7 Post Election Year 8 40% Bre-X 0% 8 8 -40% 84/85 88 /89 92 /93 96 /97 00 /01 04 /05 08 /09 12 /13 *As of May 15, 2013 75

  76. Slide 76: Contact Information

    Contact Information Jenya Meshcheryakova Investor Relations Tel: 1.866.441.0690 x.410 Email: info@mcewenmining.com facebook.com/mcewenrob twitter.com/mcewenmining store.mcewenmining.com 76

  77. Slide 77: End Notes: Non-GAAP Disclosure

    End Notes Non-GAAP Disclosure The Company has included non-GAAP performance measures, cash costs, and all-in sustaining cost per gold ounce, throughout this document on a historic and estimated forward looking basis. In the mining industry, these are common performance measures but do not have any s

  78. Slide 78: End Notes: Technical Disclosure

    End Notes Technical Disclosure Guidance to US Investors: McEwen Mining prepares its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the sta

  79. Slide 79: Resource Table

    Resource Table: Combined resources calculated using the following. San José Mine Tonnes (MM*) Ag (MMoz*) Au (MMoz*) Ag Grade (g/t) Au Grade (g/t) (49%) (1) (100%) (100%) (100%) Proven 0.83 470 6.73 12.54 0.18 Probable 0.94 471 6.19 14.26 0.19 Measured 1.3 559 8.2 23.17 0.34 (inclusive of P+P) Indica

  80. Slide 80: Resource Table: Cont'd

    Resource Table: Cont’d El Gallo Complex Tonnes (MM*) Au (MMoz*) Au Grade (g/t) Gold(2) (100%) (100%) Measured 28.3 0.46 0.41 Indicated 6.1 0.78 0.15 Inferred 27.6 0.31 0.27 Tonnes (MM*) Ag (MMoz*) Au (MMoz*) Gold Bar(3) Ag Grade (g/t) Au Grade (g/t) (100%) (100%) (100%) Measured 0.7 1.19 0.03 Indica

  81. Slide 81: Resource Table: Cont'd Los Azules

    Resource Table: Cont’d Los Azules(6) Tonnes (MM) Cu Grade (%) Au Grade (g/t) Ag Grade (g/t) Cu (B lbs) Indicated 389 0.63 0.07 1.8 5.4 Inferred 1,397 0.46 0.06 1.9 14.3 Tonnes (MM*) Ag (MMoz*) Au (MMoz*) Limo(5) Ag Grade (g/t) Au Grade (g/t) (100%) (100%) (100%) Measured 5.9 0.89 0.17 Indicated 3.7

  82. Slide 82: Cont'd

    Cont’d 3) Gold Bar resources were derived from the report titled “NI 43-101 Technical Report on Resources and Reserves Gold Bar Project, Eureka County, Nevada” dated February 24, 2012 with an effective date of November 28, 2011, prepared by J. Pennington, C.P.G., MSc., Frank Daviess, MAusIMM, Regist