Sentinel Metals Limited · ASX:SNM

Sentinel Metals — Shareholder Meeting (May 2026)

22 slides from Sentinel Metals's shareholder meeting presentation, May 7, 2026

  1. Slide 1: Developing the advanced Columbia Gold and Silver Project in Montana, USA

    Developing the advanced Columbia Gold and Silver Project in Montana, USA Large-scale resource, immediate exploration upside, near-term development potential ASX: SNM Annual General Meeting | 7 May 2026 1

  2. Slide 2: Disclaimer

    DISCLAIMER DISCLAIMER Disclaimer and Forward-Looking Statements information relating to the estimate included in the Prospectus and that all material assumptions and technical parameters underpinning the estimate in the Prospectus continue to apply and have not materially • This presentation (Presen

  3. Slide 3: Board

    BOARD MARK WILLIAMS MATT HERBERT SIMON DAHROUGE ADAM RITCHIE NON-EXECUTIVE CHAIR MANAGING DIRECTOR EXECUTIVE DIRECTOR INDEPENDENT NON- AND CO-FOUNDER AND CO-FOUNDER AND CO-FOUNDER EXECUTIVE DIRECTOR • Former MD of Red 5 Ltd (ASX:RED) for • Geologist with a metals and mining • Geologist with 11 years

  4. Slide 4: Corporate Summary and Our Mission

    CORPORATE SUMMARY CAPITAL STRUCTURE OUR MISSION “ “ Shares on Issue 104.1 million To deliver long-term value to all stakeholders through the Share Price (at 4 May 2026) 61c Market Capitalisation (at 4 May 2026) $63.5 million development and production of high-quality advanced gold Cash (at 31 March

  5. Slide 5: Columbia Gold and Silver Project

    COLUMBIA GOLD AND SILVER PROJECT STATE OF MONTANA CURRENT INFERRED JORC (2012) MINERAL RESOURCE ESTIMATE (NOVEMBER 2024) Existing JORC Resource of 920,000oz Au at 1.34g/t Au Large Existing Resource with Significant Exploration Upside: Existing JORC (2012) MRE containing 920,000oz Au at 1.34g/t Au pl

  6. Slide 6: The Current Resource

    THE CURRENT RESOURCE ELEVEN RESOURCE DOMAINS OPEN • 3.1m at 106.3 g/t Au from 33.5m (DC-009) • 3.1m at 72.0 g/t Au from 45.7m (7UP-247A) • 12.2m at 11.6 g/t Au from 1.5m (PD-90-166) • 12.2m at 9.7 g/t Au from 48.8m (PD-90-128) • 28.9m at 3.9 g/t Au from 3.0m (COL12-001) • 132.6m at 2.01 g/t Au from

  7. Slide 7: Resource Growth Potential

    RESOURCE GROWTH POTENTIAL RESOURCE GROWTH POTENTIAL INDEPENDENT EXPLORATION TARGET1 Tonnes (Mt) Grade Au (g/t) Au (Koz) Defined within a 350m wide corridor of up to 2km strike length to an average depth of ~220m below surface Low High Low High Low High 22 27 1.1 1.4 800 1,200 ELEVEN RESOURCE DOMAINS

  8. Slide 8: Geophysics Targets

    GEOPHYSICS TARGETS Historical Drilling Extent Deep Conductive Target Alteration Core Pathways Proto Heat Source 100m HSAMT Voxel Model overlain by 50m Voxel Model HSAMT highlights a deep conductive zone and overlying vertical breaks interpreted as potential structural and hydrothermal pathways. Thes

  9. Slide 9: Columbia Section Example: 5200480N

    COLUMBIA SECTION EXAMPLE: 5200480N COLUMBIA SECTION EXAMPLE: 5200480N WEST NORTH EAST Resource Optimised at US$2,200/oz, whilst peers are using $2,800+ leaving material upside at next resource estimation update 9

  10. Slide 10: Convergence Zone Targets

    CONVERGENCE ZONE TARGETS Vein Trace Convergence Zone Vein Trace Convergence Zone Projected vein traces converge at depth along interpreted structures, defining priority targets for feeder-style mineralization beneath historical drilling 10

  11. Slide 11: Maiden Drill Program

    MAIDEN DRILL PROGRAM • 21 new HQ drill holes totalling 5,000m • Based on HSAMT, field structural mapping, grab sampling, drone EM surveys and Dr Greg Corbett’s clay zone recommendations • Target testing goals: ✓ Improve Resource confidence ✓ NW strike extension ✓ Extend isolated Western mineralisati

  12. Slide 12: Montana Exploration Boom

    MONTANA EXPLORATION BOOM The Boom Strong critical-mineral demand and record gold and DEQ INCREASED WORKLOAD – 2026 APPLICATION QUEUE silver prices have seen the State of Montana being ▸ Sibanye-Stillwater flooded with new claims, applications and capital – Operating Permit 00118 — Amendment 014 (PGM

  13. Slide 13: Montana News

    MONTANA NEWS • Krista Lee Evans appointed as Vice President of Government and Community Relations • Strategic in-country appointment strengthens critical areas of community, government and regulatory engagement for the Columbia Gold Project • Newly created role supports the Company’s commitment to r

  14. Slide 14: Since IPO

    SINCE IPO Water table and historical baselining archives have been updated and restarted Full data-room and database remodel complete – along with geophysics Core shed remodel and pulp and core inventory check complete Building strong relations with Montana State Offices and Regulators Maiden drill

  15. Slide 15: Contact Us

    ASX: SNM CONTACT US Managing Director info@sentinelmetals.com matthew.herbert@sentinelmetals.com www.sentinelmetals.com +1 807 358 6798 1 5

  16. Slide 16: Appendix A

    APPENDIX A APPENDIX A ASX:SNM 16

  17. Slide 17: Montana Is the Treasure State

    MONTANA IS THE TREASURE STATE STATE OF MONTANA 150+ Significant mining legacy, with its first years major gold discovery in 1852 LIBBY EXPLORATION PROJECT BLACK BUTTE A state rich in gold, silver, copper and ROCK CREEK COPPER PROJECT UNITED STATES OF AMERICA PGM deposits – ranked 23rd globally PROJE

  18. Slide 18: Historical Technical Work

    HISTORICAL TECHNICAL WORK MORE THAN 300 TEN BULK SAMPLES 96% TOTAL  COMPOSITE SAMPLES TESTED OF BETWEEN FIVE AND TEN TONNE EACH RECOVERIES FROM GRAVITY + FLOTATION SIGNIFICANT BODY GRAVITY AND FLOTATION EXCAVATED FROM COMBINED FLOWSHEET TESTS COMPLETED TRENCHES FOR BENCH- TESTS ACHIEVED UP TO OF HI

  19. Slide 19: 2024 JORC Mineral Resource Estimate

    2024 JORC MINERAL RESOURCE ESTIMATE 2024 JORC MINERAL RESOURCE ESTIMATE • The deposit model comprised 11 subvertical host structures within a 350m wide corridor over COLUMBIA PROJECT 2024 MRE BY DOMAIN a 2km strike zone Domain Tonnes Au Au Ag Ag AuEq1 (t) (g/t) (troy oz) (g/t) (troy oz) (g/t) • The

  20. Slide 20: JORC Mineral Resource Estimate

    JORC MINERAL RESOURCE ESTIMATE JORC MINERAL RESOURCE ESTIMATE Information regarding metal equivalents • The MRE is constrained within a US$2,200 / Au oz optimised shell and COLUMBIA PROJECT 2024 MRE BY CLASSIFICATION above a 0.4865g/t AuEq cut-off grade • The MRE has been optimised and reported usin

  21. Slide 21: Drill Collars and Mineralisation Envelopes

    DRILL COLLARS AND MINERALISATION ENVELOPES DRILL COLLARS AND MINERALISATION ENVELOPES DRILL COLLARS EXAMPLE MINERALISED DOMAINS EXAMPLE MINERALISED ENVELOPE 21

  22. Slide 22: ASX: SNM

    YY SENTINEL METALS

Sentinel Metals — Shareholder Meeting (May 2026) on 6ix